Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035G089 + (ML20035G089)
- RC-93-0100, Forwards Rev 0 to VC Summer Nuclear Station,Colr Cycle 8 + (ML20035G090)
- ML20035G092 + (ML20035G092)
- ML20035G093 + (ML20035G093)
- ML20035G094 + (ML20035G094)
- ML20035G096 + (ML20035G096)
- ML20035G097 + (ML20035G097)
- ML20035G098 + (ML20035G098)
- ML20035G100 + (ML20035G100)
- ML20035G102 + (ML20035G102)
- ML20035G103 + (ML20035G103)
- ML20035G105 + (ML20035G105)
- 05000456/LER-1993-004-05, :on 930328,quadrant Power Tilt Ratio Calculated Using Three Operable power-range Channels Instead of Four Channels Required by Ts.Caused by Personnel Error. Personnel Counseled Re Performance + (ML20035G107)
- ML20035G108 + (ML20035G108)
- 3F0493-06, Forwards Info Requested in GL 92-08, Thermo-Lag 330-1 Fire Barriers, Including Confirmation of Use of Thermo-Lag Matl at Facility.Compensatory Measures,Consistent W/Ts, Established Per Recommendations in NRC Bulletin 92-001 + (ML20035G109)
- B14443, Informs That During Recent Shutdown of Facility,Util Performed Sr,In Accordance W/Ts 4.8.4.1,per 930330 Proposed Rev to TS Re one-time Extension to Various 18-month SRs + (ML20035G110)
- ML20035G111 + (ML20035G111)
- B14415, Updates NRC on Significant Progress Made in Area of Shutdown Risk Mgt.Shutdown Risk Mgt Program Implemented as Part of Performance Enhancement Program.Lower Tiered Procedure Generated Per Guidelines of NUMARC 91-06 + (ML20035G113)
- B14449, Requests Approval to Use Provisions of Code Case N-416 for Hydrostatic Testing of Repairs or Replacement of Class 2 copper-nickel Piping in CCE*E1A Hx,Per GL 90-05.Piping Will Be Modified During 1993 Refueling Outage + (ML20035G114)
- ML20035G115 + (ML20035G115)
- PLA-7838, Reply to Notice of Violation: EA-19-050 (PLA-7838) + (ML20035G116)
- ML20035G117 + (ML20035G117)
- 05000499/LER-1993-001-01, Forwards LER 93-001-01 Re Reactor Trip Due to Failure of Main Turbine electro-hydraulic Control Line.Rev Includes Results of Failure Analyses Performed on Failed Control Line & Linear Variable Differential Transformer + (ML20035G119)
- ML20035G121 + (ML20035G121)
- 05000499/LER-1993-001, :on 930123,unit Automatically Tripped from Full Power Due to Turbine Trip Above P-9 Setpoint as Result of Depressurization of electro-hydraulic Control Supply Header. Failed Line & Differential Transformer Replaced + (ML20035G122)
- ML20035G124 + (ML20035G124)
- 05000213/LER-1993-002, :on 930323,control Rods 31 & 32 Malfunctioned When Operators Attempted to Insert Control Bank B.Caused by Inadequate Procedural Verification on Maint of Control Rod Contactors.Mechanical Fasteners Tightened + (ML20035G125)
- ML20035G126 + (ML20035G126)
- ML20035G127 + (ML20035G127)
- ML20035G129 + (ML20035G129)
- ML20035G130 + (ML20035G130)
- ML20035G131 + (ML20035G131)
- LIC-93-0136, Forwards Public & Central Files Versions of Rev 8 to EPIP-TSC-8, Core Damage Assessment. Central Files Version Withheld + (ML20035G132)
- ML20035G133 + (ML20035G133)
- ML20035G135 + (ML20035G135)
- ML20035G137 + (ML20035G137)
- ML20035G138 + (ML20035G138)
- ML20035G139 + (ML20035G139)
- ML20035G140 + (ML20035G140)
- NRC-93-0049, Forwards Response to NRC Raising Concerns Re fitness-for-duty Program & Suppls 921120 Response to Notice of Violation (EA 91-100) Re Dept of Labor Case 86-ERA-32 + (ML20035G142)
- 05000354/LER-1993-002-02, :on 930323,discovered That Required post-maint Retest Activities Not Performed for Several Valves Repaired During Outage.Caused by Personnel Error.New Recurring Tasks Will Be Established When Frequency Changes + (ML20035G143)
- 05000245/LER-1993-002, Corrected Cover Sheet to LER 93-002,correcting Administrative Error.First Sentence of Cover Sheet Should Be Corrected to Read as Stated + (ML20035G144)
- LD-93-066, Confirms That full-size P&Ids of CESSAR-DC Figures Listed in Inservice Testing Program,Transmitted Via ,Sent to BNL to Support NRC Review of Program + (ML20035G146)
- ML20035G147 + (ML20035G147)
- ML20035G149 + (ML20035G149)
- ML20035G151 + (ML20035G151)
- ML20035G154 + (ML20035G154)
- 05000382/LER-1993-001, Forwards Corrected LER 93-001-00,superseding LER W/Same Number Dtd 930401.Reporting Requirement in Block 11 Marked Incorrectly in Original Rept + (ML20035G155)
- 05000382/LER-1993-001-03, :on 930304,reactor Trip Occurred as Result of Two Nearly Simultaneous Power Supply Failures.Caused by age- Related Degradation of Frequency Detection Card.Cards Replaced & Updated Power Supply Installed + (ML20035G157)
- ML20035G158 + (ML20035G158)
- ML20035G159 + (ML20035G159)