ML20035G138

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 70-1113/93-201 on 930322-26 & Notice of Violation.Rept Details & Notice of Violation Withheld,Per 10CFR2.790
ML20035G138
Person / Time
Site: 07001113
Issue date: 04/23/1993
From: Casey Smith
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Silverthorne D
GENERAL ELECTRIC CO.
Shared Package
ML19303F574 List:
References
NUDOCS 9304260210
Download: ML20035G138 (2)


Text

[g.p uc k UNITED STATES oq i

S NUCLEAR REGULATORY COMMISSION N

"f WASHINGTON. D.C. 20655-0001

\\,

/

April 23, 1993 FCOB:TNP Docket No. 70-1113 License No. SNM-1097 General Electric Company ATTN: Mr. Dallas L. Silverthorne, Manager Nuclear Feel and Components Manufacturing Department P. O. Box 780 Wilmington, NC 28402

Dear Mr. Silverthorne:

SUBJECT:

INSPECTION REPORT NO. 70-1113/93-201 The Nuclear Regulatory Comission conducted a routine inspection of your facility's material control and accounting safeguards program on March 22-26, 1993. The scope and results of the inspection are sumarized in Enclosure 1,

" Inspection Report Summary." Areas examined during the inspection are described in Enclosure 2, " Inspection Report Details."

The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress. At the conclusion of the inspection, the findings were discussed with members of your staff.

The inspection findings indicate that certain activities appear to violate NRC requirements. Although the failure to meet these requirements has not significantly decreased the effectiveness of the safeguards program, it does reflect some weaknesses. The violations (all of Severity Level V), references to pertinent requirements, and details to be addressed in your response are described in the Notice of Violations (Enclosure 3).

Under the provisions of Section 2.790(d), reports containing information related to a licensee's material control and accounting program are exempt from public disclosure. Accordingly, the Inspection Report Details (Enclosure

2) and the Notice of Violations (Enclosure 3) will not be placed in the Public Document Room.

E I

< ' [^ y r

, p e=3 pr ' r n" ~' m e <~

e m w u c. m e 260103 j

g fgy*~ /i///k (4f-hV'-

/

II 9304260210 930423

//#/.f' t

i PDR ADOCK 07001113 (fdk, j

jj)

C pon

. ~.

The responses directed by this letter and its enclosures are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, P. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely, 0@elSiped ByC.N.(Mike)Smsh C. N. (Mike) Smith, Chief i

Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS

Enclosures:

As stated cc:

w/o Enclosures 2 & 3 State of North Carolina i

bec: w/ Enclosures T. Preston Winslow, Manager Licensing and Nuclear Material Management General Electric Company DISTRIBUTION:

NRC File Center-CEmeigh, FCLB Doc. File 70-113 EFlack, FCLB i

PDR w/o Encl. 2 & 3 EMcAlpine' RII LPDR w/o Encl. 2 & 3 FCOB r/f HMSS r/f Case File RFP. >

t t

MMe.

,. LFDB w/o Encl.

JKiita, R11 estyc, FCSS f

n b

FCOB E

FCOB) h FCRB/,.f/ 6 OFC FOCB TPhamY RCassab')

JYardumfan Clk k d 'd NAME DATE OY/O/93 C973/93 h/d/93

[/[93 I

f

/ /93 C= COPY E = COVER & ENCLOSURE N = NO COPY 0FFICIAL RECORD COPY I

i I

n

.