Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000282/LER-1993-004, :on 930209,discovered That ASME Section XI ISI Exams Performed W/Incorrect Calibr Blocks.Caused by Personnel Error.Isi NDE Procedures & Plans Will Be Revised to Assure Acceptable Calibr Block Used + (ML20034H466)
- ML20034H467 + (ML20034H467)
- LD-93-037, Transmits Amend L to CESSAR-Design Certification. Amend L Includes Revs Submitted W/Responses to Issues in Sys 80+ Dser.W/One Oversize Drawing + (ML20034H468)
- ML20034H474 + (ML20034H474)
- ML20034H475 + (ML20034H475)
- ML20034H479 + (ML20034H479)
- 05000440/LER-1993-006, :on 930212,while Transferring AEGTS from B Train to a Train,B Train Automatically Restarted.Caused by Personnel Error.Event Will Be Reviewed W/Operators as Part of Routine Operator Requalification Training + (ML20034H482)
- ML20034H484 + (ML20034H484)
- ML20034H485 + (ML20034H485)
- ML20034H487 + (ML20034H487)
- ML20034H488 + (ML20034H488)
- 05000353/LER-1993-003-01, :on 930213,inadvertent Div 2 LOCA Signal Initiated During Surveillance Test.Caused by Personnel error.On-job Training Moduel Expected to Be Implemented by 930401 + (ML20034H489)
- ML20034H490 + (ML20034H490)
- ML20034H492 + (ML20034H492)
- ML20034H493 + (ML20034H493)
- ML20034H495 + (ML20034H495)
- ML20034H496 + (ML20034H496)
- ML20034H497 + (ML20034H497)
- ML20034H498 + (ML20034H498)
- ML20034H499 + (ML20034H499)
- ML20034H500 + (ML20034H500)
- ML20034H501 + (ML20034H501)
- ML20034H502 + (ML20034H502)
- ML20034H503 + (ML20034H503)
- ML20034H504 + (ML20034H504)
- ML20034H505 + (ML20034H505)
- ML20034H506 + (ML20034H506)
- RBG-38-223, Responds to NRC Bulletin 90-001,Suppl 1, Loss of Fill Oil in Transmitters Mfg by Rosemount. All Model 1153 & 1154 Transmitters in Plant Spare Parts Inventory Upgraded to Only Include New Style Sensing Modules + (ML20034H507)
- RBG-38-222, Forwards Copy of Authorization of Board of Directors of Gulf States Utilities Co for Je Booker,Manager - Safety Assessment & Quality Verification,To Sign Ltrs to NRC Transmitting Amends to OL or Response to Any NRC Insp Rept + (ML20034H508)
- ML20034H510 + (ML20034H510)
- 05000445/LER-1992-029, :on 921208,discovered Temporary Power Supply Lost to Panel 1PC1.Caused by Personnel Error.Engineering Will Hold Annual Training in self-verification for All Engineering Personnel + (ML20034H511)
- ML20034H512 + (ML20034H512)
- ML20034H513 + (ML20034H513)
- 05000245/LER-1991-028-01, :on 911107,determined That Postulated Seismic Event Could Result in Inoperability of EDG & Feedwater Coolant Injection Sys.Caused by Insufficient Number of Anchor Bolts Installed.Baseplates Inspected + (ML20034H515)
- ML20034H516 + (ML20034H516)
- ML20034H517 + (ML20034H517)
- ML20034H519 + (ML20034H519)
- ML20034H520 + (ML20034H520)
- 0CAN039301, Informs NRC That Licensee Has Made Administrative Title Change in Security Organization Contained in ANO Industrial Security Plan.Supervisor Security Compliance Has Been Changed to Coordinator,Security Compliance + (ML20034H521)
- ML20034H522 + (ML20034H522)
- ML20034H523 + (ML20034H523)
- ML20034H524 + (ML20034H524)
- ML20034H525 + (ML20034H525)
- 05000423/LER-1993-002-01, :on 930207,train a CR Pressurization Sys Failed 18 Month Pressurization Surveillance Test.Caused by Moisture in Air Banks.Cr Placed in Filtered Recirculation & Air Banks Refilled W/Dry Air + (ML20034H526)
- ML20034H527 + (ML20034H527)
- ML20034H529 + (ML20034H529)
- ML20034H530 + (ML20034H530)
- ML20034H531 + (ML20034H531)
- ML20034H532 + (ML20034H532)
- ML20034H533 + (ML20034H533)
- ML20034H534 + (ML20034H534)