ML20034H520

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Oct 1992 for Limerick Generating Station Unit 1
ML20034H520
Person / Time
Site: Limerick Constellation icon.png
Issue date: 10/31/1992
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20034H514 List:
References
NUDOCS 9303180237
Download: ML20034H520 (1)


Text

-

OPERATING DATA REPORT DOCKET NO. 50 - 352 DATE NOVEMBER 13 1992 39 31019 C)7()

COMPLETED BY P LAD LPH ELECTR C COMD kARL MECK i

REPORTS SUPERVISOR

. 3D13 BUSINESS UNIT LIMERICM GENERATING STATION TELEPHONE (C15) 327-1200 EXTENSION 3320 IJ

>=

. 3p gg OPERATING STATUS c) -

PJ 1.-UNIT NAME: LIMERICK UNIT 1 NOTES: THERE WAS ONE LOAD DROP LJ 3C'I

2. REPORTING PERIOD:

OCTOBER. 1992 GREATER THAN 20% DUE TO

) -

.3.

LICENSED THERMAL POWER (MWT):

3293 A REACTOR RECIRC PUMD

. gp

~~~~~~~~~~~~~~~~

'O O b3 -

4 NAMEPLATE RATING ~(GROSS MWE):

1138 RUNBACK SIGNAL.

. -D C) >=

U LJC3

.5.

DESIGN ELECTRICAL RATING (NET MwE):

1955'

>2 LR b

6.

MAXIMUM.0EPENDABLE CAPACITY (GROSS MWE): 1092 7.

MAXIMUM DEPENDABLE CAPACITY.(NET MWE):

1055 8.

IF. CHANGE 5 OCCUD IN CAPACITY RATINGS (ITEMS NUMBER'3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

9.

power LEVEL TO WHICH RESTRICTED. 1F ANY (NET'MWE):

10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH VR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 745 7.320 59.160
12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 4.776.4 46.005.2

.13. REACTOR RESERVE SHUTDOWN HOURS-0.0 0.0 0.0 14 HOUR 5' GENERATOR ON-LINE 745.0 4.652.3 45.094.2 15.-UNIT RESERVE SHUTDOWN HOURS 0.0 0.0'-

0.0

16. GROSS THERMAL ENERGY GENERATED ( MWH ) -

2.439.576 14.980.475 136.969.391 lghi '

'7.

GROS 5 ELECTRICAL ENERGY GENERATED (MWH) 80 0'

9

-18.

NET ELECTRICAL ENERGY GENERATED (MWH)-

'781.097 4.707.850 42.519.306-PAGE 1 0F 2 m..

-. ~..

.-