ML20034H490
| ML20034H490 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/31/1993 |
| From: | Julie Hughes TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | |
| Shared Package | |
| ML20034H486 | List: |
| References | |
| NUDOCS 9303180170 | |
| Download: ML20034H490 (2) | |
Text
- l n
' Attachm:nt 1 13 TXX-93130 l
- g. ' PageL.9 of 10 c
e COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT.
REV.1 DOCKETNO:
.50445-UNIT:
CPSES 1 -
DATE:
March 12,1993 i
COMPLETEDBY:
Janet Hughes TELEPHONE:
8174197 5331
.l 1
OPERATING STATUS 1.
Reporting Period: JANUARY 1993 Gross hours in reporting period:
2H j
' 2.
Currently authorized power level (MWI):
3 11. Max. depend. capacity (MWe-Net): 1150
- Design Electrical Rating (MWe-Net):
1152 3.
Power level to which restricted (if any) (MWe-Net):
NONE 4.
Reasons for restriction (if any):
-l THISMONTH YRTODATE CUMUt.ATIVE:
i 704.4 704.4 16,223 5.
Number of hours reactorwas critical 0
0 2.258 4 -
6.
Reactor reserve shutdown hours 8
6882 15,847.3 :
}
7.
Hours generator on line O
O O
' 8.
Unit reserve shutdown hours t
1,950,103 1,950,103 49.245,930.
'5 9.
Gross thermal energy generated (MWH) 667,267 667.267 16,302,432 10.
Gross electrical energy generated (MWH) 633,961 633,961
.15.476,337 -
-i
- 11.
Net electrical energy generated (MWH) 12.
Reactor Service factor 94.7 94.7 74.9 94.7 94.7 85.3 13.
Reactor availability factor
-14 Unit service factor 92.6 92.6..
73 2
-l 92.6 92.6 73 2 j
15.
Unit availability factor l
74.1 74.1 62.1 16.
Unit capacity factor (Using MDC) 74.1 74.1 62.1' 17.
Unit capacity factor (Using Design MWe).
74 74 79 18.
Unit forced outage rate j
19.
Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
2 f
20.
If shutdown at end of report period, estimated date of startup-21.
Units in test status (prior to comrnercial operation):
ACHIEVED
~i t
Commercial Operation 900813 JANUARY ~1993 REVISION-1 i
Estimated -
9303100170 930315 PDR. ADOCK 05000455 R
i
't f Attachment 1 to TXX 93130 1
' Page 10 of 10 I
l AVERAGE DAILY UNIT POWER LEVEL j
REV.1
' DOCKETNO:
50445; t
UNIT:
CPSES 1 :
~
DATE:
March 12.1993 -
j CCMPLETEDBY:
Janet Hughes
'[
TELEPHONE:
817-897 4331
- i MONTH
- JANUARY 1993 ~
.l DAY AVERAGEDAILYPOWERLEVEL DW AVERAGE DAILYPOWER LEVEL (MWe-Net).
(MWe-Net) i 1
532 37 110s
- l 2
561 18 521 3
600 19 39.
'F 4
2 20 383'
~
-i
-5 912 21 739 6
912 22 1092~
i
.7 942 23 1104 8.
1078 24 495-9 1081 25 1-l 10 1076 26-537 -
.}
-l 11 1109 27 12 1109-28 1098.
.i 13 1109-29 1097
-i 14 1108 30 1102-i 15 1102 31 1108 l
-i 16.
E i
' JANUARY 1993:
i
- REVISION l'
-