Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000482/1990006 + (ML20012C958)
- ML20012C959 + (ML20012C959)
- IR 05000285/1990012 + (ML20012C960)
- ML20012C961 + (ML20012C961)
- ML20012C965 + (ML20012C965)
- ML20012C966 + (ML20012C966)
- ML20012C967 + (ML20012C967)
- ML20012C969 + (ML20012C969)
- ML20012C970 + (ML20012C970)
- LIC-90-0193, Provides Interim Update of Util Position for Testing PORV Block Valves,Per 891215 Telcon W/A Bournia.Crane 2 1/2 Inch 797-U Replacement Valves Expected to Be Delivered within 1 Yr.Test Results Expected in Second Quarter 1991 + (ML20012C972)
- ML20012C973 + (ML20012C973)
- ML20012C974 + (ML20012C974)
- ML20012C975 + (ML20012C975)
- ML20012C976 + (ML20012C976)
- ML20012C977 + (ML20012C977)
- ML20012C978 + (ML20012C978)
- ML20012C979 + (ML20012C979)
- ML20012C980 + (ML20012C980)
- ML20012C981 + (ML20012C981)
- JPN-90-023, Forwards Application for Amend to License DPR-59,changing Tech Spec Section 4.9.F, LPCI Motor-Operated Valve Independent Power Supplies, on Page 222a.Changes Purely Editorial in Nature & Revises Surveillance Requirement + (ML20012C982)
- ML20012C983 + (ML20012C983)
- ML20012C984 + (ML20012C984)
- ML20012C985 + (ML20012C985)
- ML20012C987 + (ML20012C987)
- ML20012C988 + (ML20012C988)
- ML20012C989 + (ML20012C989)
- ML20012C990 + (ML20012C990)
- ML20012C991 + (ML20012C991)
- ML20012C992 + (ML20012C992)
- RBG-32507, Forwards Duke Engineering & Svcs,Inc to BC Fichtenkort Re Proposed Crankshaft Insp Variation & Recommends Variation Be Presented to Clearinghouse Members at 900111-12 Meeting + (ML20012C993)
- ML20012C994 + (ML20012C994)
- ML20012C995 + (ML20012C995)
- LIC-90-0205, Responds to Generic Ltr 89-19 Re USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Mod Request MR-FC-084 Initiated to Provide Automatic Steam Generator Overfill Protection + (ML20012C996)
- ML20012C998 + (ML20012C998)
- ML20012C999 + (ML20012C999)
- ML20012D000 + (ML20012D000)
- LIC-90-0203, Forwards Application for Amend to License DPR-40,making Corrections to Tech Specs Re Administrative Controls + (ML20012D002)
- ML20012D003 + (ML20012D003)
- ML20012D004 + (ML20012D004)
- ML20012D005 + (ML20012D005)
- ML20012D006 + (ML20012D006)
- ML20012D007 + (ML20012D007)
- ML20012D008 + (ML20012D008)
- ML20012D009 + (ML20012D009)
- 05000285/LER-1990-003, :on 900216,determined That Auxiliary Feedwater Piping Outside Normal Stress Limits of ASME Code & Design Basis Specified in Updated Sar.Caused by Design Deficiency.Valve Operators Will Be Inspected + (ML20012D010)
- ML20012D011 + (ML20012D011)
- 05000285/LER-1990-004, :on 900217,lift Pressures for 6 of 10 Main Steam Safety Valves Found Outside Acceptance Criteria. Caused by Overly Restrictive Operability Criteria.Valves Recalibr & License Amend Submitted to NRC + (ML20012D012)
- ML20012D013 + (ML20012D013)
- ML20012D014 + (ML20012D014)
- ML20012D015 + (ML20012D015)
- ML20012D016 + (ML20012D016)