Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20003B195 + (ML20003B195)
- PNO-III-81-016, on 810206,EPA Issued Show Cause Order Based on Rn-222 Emanation Levels from Residue Piles at Site & Thorium Contamination in Kress Creek in Excess of EPA Stds + (ML20003B196)
- 05000259/LER-1981-003, Forwards LER 81-003/01T-0 + (ML20003B197)
- ML20003B198 + (ML20003B198)
- 05000302/LER-1981-001-01, /01T-0:on 810107,during Performance of Quarterly Battery Check SP-511,determined That Battery Did Not Meet Tech Spec Requirements.Caused by Decrease in Specific Gravity of One Cell.Battery Placed on Equalize Charge + (ML20003B201)
- 05000259/LER-1981-003-01, /01T-0:on 810124,Div of Engineering Notified That 1-inch Vent Line on Unit 1 Scram Discharge Vol Not Seismically Qualified.Caused by Piping Configuration Not Conforming to Design Requirements + (ML20003B202)
- ML20003B203 + (ML20003B203)
- ML20003B204 + (ML20003B204)
- ML20003B206 + (ML20003B206)
- ML20003B207 + (ML20003B207)
- 05000321/LER-1981-004, Forwards LER 81-004/03L-0 + (ML20003B208)
- ML20003B209 + (ML20003B209)
- 05000260/LER-1981-003, Forwards LER 81-003/03L-0 + (ML20003B210)
- ML20003B211 + (ML20003B211)
- ML20003B212 + (ML20003B212)
- ML20003B213 + (ML20003B213)
- ML20003B214 + (ML20003B214)
- 05000321/LER-1981-004-03, /03L-0:on 810106,w/unit in Steady State Power Operation,Qa Audit Showed That Temporary Procedure Change HNP-818 Was Not Approved by Plant Manager within 14 Days of Implementation.Caused by Deletion of Requirement + (ML20003B215)
- ML20003B216 + (ML20003B216)
- 05000260/LER-1981-003-03, /03L-0:on 810112,core Spray Pump Discharge Pressure Switch 2-PS-75-16 Found Outside Tech Spec Limits. Caused by Setpoint Drift.Switch Recalibr & Replaced + (ML20003B218)
- ML20003B219 + (ML20003B219)
- ML20003B220 + (ML20003B220)
- ML20003B221 + (ML20003B221)
- ML20003B222 + (ML20003B222)
- ML20003B223 + (ML20003B223)
- 05000267/LER-1981-002, Forwards LER 81-002/03L-0 + (ML20003B224)
- ML20003B225 + (ML20003B225)
- ML20003B226 + (ML20003B226)
- 05000260/LER-1981-005, Forwards LER 81-005/03L-0 + (ML20003B228)
- ML20003B229 + (ML20003B229)
- ML20003B230 + (ML20003B230)
- ML20003B231 + (ML20003B231)
- ML20003B234 + (ML20003B234)
- ML20003B235 + (ML20003B235)
- 05000260/LER-1981-005-03, /03L-0:on 810119,core Max Fraction of Limiting Power Density Exceeded Limit for One Node in Core.Caused by Operation Close to Limit in Conjunction W/Minor (Normal) Perturbation in Monitored Parameters.Power Reduced Slightly + (ML20003B236)
- ML20003B237 + (ML20003B237)
- ML20003B238 + (ML20003B238)
- 05000327/LER-1981-005, Forwards LER 81-005/03L-0 + (ML20003B239)
- ML20003B240 + (ML20003B240)
- ML20003B241 + (ML20003B241)
- 05000267/LER-1981-005, Forwards LER 81-005/03L-0 + (ML20003B243)
- ML20003B244 + (ML20003B244)
- 05000327/LER-1981-005-03, /03L-0:on 810114,capacitor C1A in A10 Power Supply & Control Card RB-8 Failed While in Svc.Caused by Failure of Vital Inverter 2-II.Components Replaced & Inverter Returned to Svc on 810114 + (ML20003B245)
- 05000267/LER-1981-002-03, /03L-0:on 810107,during Normal Operation,Sampling Requirements of SR NR1.1 Found Not Met for Day shift,801225. Caused by Personnel Error.Sampling Resumed on Next Shift & Personnel Reinstructed Re Importance of Requirements + (ML20003B246)
- ML20003B247 + (ML20003B247)
- ML20003B248 + (ML20003B248)
- 05000327/LER-1981-007, Forwards LER 81-007/03L-0 + (ML20003B249)
- ML20003B250 + (ML20003B250)
- 05000293/LER-1981-002, Forwards LER 81-002/03L-0 + (ML20003B251)
- ML20003B252 + (ML20003B252)
- ML20003B253 + (ML20003B253)