Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000267/LER-1980-067, Forwards LER 80-067/01T-0 + (ML19345A964)
- ML19345A965 + (ML19345A965)
- 05000324/LER-1980-084-03, /03L-0:on 801024,containment Atmosphere Dilution Tank Flow Control Valves 2-CAC-FCV-2717 & 2720 Would Not Operate.Caused by Accumulation of Water in Electropneumatic Converter of Valve 2720.Water Removed + (ML19345A966)
- 05000219/LER-1980-048, Forwards LER 80-048/03L-0 + (ML19345A967)
- ML19345A968 + (ML19345A968)
- 05000267/LER-1980-067-01, /01T-0:on 801107,tritium Concentration Exceeded Limit Specified in LC04.8.24.8.2(a).Caused by Inadequate Deviation 80-445 to Surveillance Procedure SR 5.8.2bc-M. Procedure & Design Changes Under Investigation + (ML19345A969)
- ML19345A970 + (ML19345A970)
- ML19345A972 + (ML19345A972)
- 05000219/LER-1980-048-03, /03L-0:on 801029,during Functional Testing,Snubber 23-7 Failed to Lock Up in Tension Direction.Cause Unknown. Snubber Replaced + (ML19345A973)
- ML19345A974 + (ML19345A974)
- 05000334/LER-1980-077, Forwards LER 80-077/01T-0 + (ML19345A975)
- ML19345A976 + (ML19345A976)
- 05000334/LER-1980-077-01, /01T-0:on 801114,overstress Condition Determined to Exist on Main Steam Line Branch Line Support.Caused by Thermal Movement of Main Steam Line Affecting Branch Line Support.Pipe Support Rod Completed + (ML19345A977)
- ML19345A978 + (ML19345A978)
- ML19345A979 + (ML19345A979)
- 05000219/LER-1980-049, Forwards LER 80-049/01T-0 + (ML19345A980)
- ML19345A981 + (ML19345A981)
- 05000219/LER-1980-049-01, /01T-0:on 801105,when Isolation Condenser B Was Removed from Svc to Repair Steam Leak,Vent Isolation Valves V-14-1 & V-14-19 Apparently Failed to Close.Cause Undertermined.Stem Packing Replaced & Tested + (ML19345A982)
- PNO-I-80-167, on 800929,State of Nj Dept of Environ Protection Received Ltr from Citizen Complaining of Radioactive Contamination Along Route 17,Rochelle,Park,NJ. Th-232 & Ra-226 Confirmed in 801008 & 20 Soil Samples + (ML19345A983)
- ML19345A984 + (ML19345A984)
- 05000320/LER-1980-048, Forwards LER 80-048/03L-0 + (ML19345A985)
- PNO-I-80-168, on 801117,reactor Tripped Due to Low Steam Pressure Signal.Caused by Placing Wrong Channel in Trip When Intermittent Fault Became Evident on Another Instrument. Outage Expected to Last Two Days for Reboration & Repairs + (ML19345A987)
- ML19345A989 + (ML19345A989)
- 05000320/LER-1980-048-03, /03L-0:on 801017,after Sampling a Core Flood Tank, Inner Containment Isolation Valve CF-V115 Failed to Close. Apparently Caused by Motor & Control Circuits Grounding Out, Induced by Water Leakage.Valve Closed & Deactivated + (ML19345A990)
- 05000249/LER-1980-037-03, /03L-0:on 801020,during Normal Operation W/Dis 500-2 in Progress,Level Switch LIS 263-57B Was Found to Trip at Differential Pressure Less than Tech Specs.Caused by Instrument Drift.Instrument Readjusted + (ML19345A992)
- ML19345A993 + (ML19345A993)
- ML19345A994 + (ML19345A994)
- ML19345A995 + (ML19345A995)
- ML19345A996 + (ML19345A996)
- ML19345A997 + (ML19345A997)
- ML19345A998 + (ML19345A998)
- ML19345B002 + (ML19345B002)
- ML19345B003 + (ML19345B003)
- ML19345B005 + (ML19345B005)
- ML19345B006 + (ML19345B006)
- ML19345B007 + (ML19345B007)
- ML19345B009 + (ML19345B009)
- ML19345B011 + (ML19345B011)
- IR 05000317/1980014 + (ML19345B012)
- ML19345B013 + (ML19345B013)
- ML19345B014 + (ML19345B014)
- IR 05000309/1980011 + (ML19345B017)
- ML19345B018 + (ML19345B018)
- ML19345B019 + (ML19345B019)
- ML19345B020 + (ML19345B020)
- ML19345B022 + (ML19345B022)
- ML19345B023 + (ML19345B023)
- ML19345B024 + (ML19345B024)
- ML19345B025 + (ML19345B025)
- ML19345B026 + (ML19345B026)
- ML19345B027 + (ML19345B027)