Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000295/LER-1980-048-03, /03L-0:on 801016,during Normal Operation,Calibr of Rad Monitors 1 & 2 Was Not Completed within 6-month Calibr Interval.Caused by Delay in Delivery of Calibr Gas (Kr-85) by Vendor.Personnel Reinstructed on Procedures + (ML19345A854)
- 05000327/LER-1980-176-03, /03L-0:on 801020,lower Airlock Failed SI-159.1, Overall Leakage Test.Caused by Airlock Inner Door Ball Valve Leak.Valve Repaired + (ML19345A857)
- ML19345A858 + (ML19345A858)
- 05000348/LER-1980-063-03, /03L-0:on 801020,while Performing Emergency Core Cooling Valves Inservice Test,Valve 1-CVC-MOV-115D Would Not Open from Main Control Board.Caused by Contact Arm 4 Being Out of Adjustment.Contact Arm Was Readjusted + (ML19345A860)
- 05000295/LER-1980-006-01, During Normal Operation, Surveillance of Auxiliary Bldg Ventilation Sys Revealed Inoperable Charcoal Filters.Caused by Improper Installation of Dampers Controlling Fuel Bldg Ventilation Paths + (ML19345A861)
- ML19345A862 + (ML19345A862)
- 05000259/LER-1980-079, Forwards LER 80-079/03L-0 + (ML19345A863)
- ML19345A864 + (ML19345A864)
- 05000348/LER-1980-067-03, /03L-0:on 801020,svc Water a Train Battery Sys Was Declared Inoperable.Caused by Close Terminal Post Proximity & Poor Terminal Post Seal Design.Battery Was Cleaned & Placed on Charge + (ML19345A865)
- 05000265/LER-1980-025, Forwards LER 80-025/03L-0 + (ML19345A866)
- ML19345A867 + (ML19345A867)
- ML19345A868 + (ML19345A868)
- 05000259/LER-1980-079-03, /03L-0:on 801025,electrical Ground Occurred at HPCI Egr Actuator,Causing Failure of Egm Output Transistors Q9 & Q10.Caused by Corrosion Between Egr Actuator Connector & Connector Pins.Actuator & Box Replaced + (ML19345A869)
- ML19345A870 + (ML19345A870)
- 05000265/LER-1980-025-03, /03L-0:on 801007,while Performing Qos 1300-3, Reactor Core Isolation Cooling Motor Operated Valve Operability,Valve MO-2-1301-49 Could Not Be Fully Opened. Caused by Limit Switches Out of Position.Switches Adjusted + (ML19345A871)
- 05000254/LER-1980-029, Forwards LER 80-029/01T-0 + (ML19345A874)
- ML19345A875 + (ML19345A875)
- 05000333/LER-1980-081-03, /03L-0:on 801023,carbon Dioxide Sys Associated W/North Cable Run Room Would Not Actuate from Heat Detectors or Local Push Button.Caused by Wiring Changes Due to Mods Resulting in Wire Physically Preventing Proper Operation + (ML19345A876)
- 05000254/LER-1980-029-01, /01T-0:on 801103,during Suppression Chamber Mods to Make Weld fit-up,safety Relief Valve Line 1-3019E-8 Suffered 4-inch Crack at Pipe Penetration.Caused by Excessive Force.Pipe Will Be Repaired Before Startup + (ML19345A877)
- ML19345A878 + (ML19345A878)
- 05000318/LER-1980-048, Forwards LER 80-048/03L-0 + (ML19345A879)
- ML19345A880 + (ML19345A880)
- ML19345A883 + (ML19345A883)
- 05000318/LER-1980-048-03, /03L-0:on 801019,during Withdrawal of Control Element Assemblies to Control Axial Shape Index,Assemblies Dropped Into Core.Cause Unknown.Review of Control Element Assembly Drop Occurrences Is Underway + (ML19345A884)
- 05000265/LER-1980-029, Forwards LER 80-029/03L-0 + (ML19345A886)
- ML19345A887 + (ML19345A887)
- ML19345A888 + (ML19345A888)
- 05000265/LER-1980-029-03, /03L-0:on 801027,during Surveillance Procedure, Pressure Suppression Chamber & Reactor Bldg Vacuum Breaker Actuation Calibr & Functional Test Found to Actuate at 0.52 Psid.Caused by Instrument Setpoint Drift.Switch Recalibr + (ML19345A889)
- 05000324/LER-1980-090, Forwards LER 80-090/03L-0 + (ML19345A890)
- ML19345A891 + (ML19345A891)
- 05000304/LER-1980-025-01, /01T-0:on 801101,during Normal Operation,Leak Was Discovered on Lube Oil Piping of Diesel Generator 2A.Caused by Vibration Induced Fatigue.Pipe Was Replaced + (ML19345A892)
- 05000324/LER-1980-090-03, /03L-0:on 801026,during Control Rod Operability Check P.T.14.1,rod 34-23 Would Not Select.During Routine Surveillance Checks,Rod 18-23 Would Not Select.Caused by Failure of Rod Select Switches.Switches Replaced + (ML19345A893)
- 05000324/LER-1980-086, Fowards LER 80-086/03L-0 + (ML19345A895)
- ML19345A896 + (ML19345A896)
- 05000324/LER-1980-086-03, /03L-0:on 801024,during Routine Surveillance, Reactor Instrument Penetration Isolation Valve X51D Found W/O Position Indication.Caused by Valve Position Limit Switches Out of Adjustment.Switches Readjusted + (ML19345A897)
- 05000327/LER-1980-178, Forwards LER 80-178/01T-0 + (ML19345A898)
- ML19345A899 + (ML19345A899)
- 05000155/LER-1980-034-01, /01T-0:on 801101,during Routine Shutdown Operations,Main Steam Isolation Valve M07050 Failed to Close on Remote Manual Initiation.Caused by Hardened Packing Matl on Valve Stem.Other Packing Techniques Are Being Considered + (ML19345A902)
- 05000327/LER-1980-178-01, /01T-0:on 801031,containment Upper Compartment Temp Found Too Cool.Caused by Entering of Unit 1 Into Mode 1 W/Temp Too Cool.Upper Compartment Temp Increased Above Min Required Level + (ML19345A903)
- 05000327/LER-1980-171, Forwards LER 80-171/03L-0 + (ML19345A905)
- ML19345A906 + (ML19345A906)
- 05000277/LER-1980-026, Forwards LER 80-026/01T-0 + (ML19345A907)
- ML19345A908 + (ML19345A908)
- ML19345A911 + (ML19345A911)
- 05000327/LER-1980-171-03, /03L-0:on 801016,diesel Generator 1B-B Tripped During Performance of SI-7.1.Caused by Replacing of Red Indicating Light of 86GA Relay.Socket Repaired + (ML19345A912)
- 05000277/LER-1980-026-01, /01T-0:on 801105,HPCI Turbine Observed to Trip & Restart Several Times.Caused by Open Resistor in Power Supply to HPCI Turbine Electronic Governor Motor (Egm), Preventing Egm Controls from Receiving Correct Speed Signal + (ML19345A913)
- ML19345A914 + (ML19345A914)
- 05000296/LER-1980-043, Forwards LER 80-043/03L-0 + (ML19345A916)
- ML19345A917 + (ML19345A917)
- ML19345A918 + (ML19345A918)
- ML19345A919 + (ML19345A919)