Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000254/LER-1980-032, Forwards LER 80-032/01T-0 + (ML19340D800)
- ML19340D801 + (ML19340D801)
- 05000409/LER-1980-012-03, /03L-0:on 801124,soil Sample Under Feedwater Heater Area of Turbine Bldg Found Slightly Contaminated. Caused by Drilling Hole in Bldg Floor or When Floor Was Washed Prior to Grouting.Surveillance Program Established + (ML19340D802)
- 05000254/LER-1980-032-01, /01T-0:on 801211,during Installation of Hanger Per IE Bulletin 79-14,two 1/2-inch Anchor Bolt Holes Were Drilled Which Penetrated Primary Containment.Caused by Faulty Design.Plugs Welded in Holes + (ML19340D803)
- 05000317/LER-1980-065, Forwards LER 80-065/01T-1 + (ML19340D804)
- ML19340D805 + (ML19340D805)
- 05000317/LER-1980-065-01, /01T-1:on 801215,charging Pumps Discovered Running W/Shutdown Cooling Flow Secured.Caused by Operator Failure to Perform Surveillance Requirements of Tech Specs. Requirements Reviewed W/Personnel + (ML19340D806)
- ML19340D808 + (ML19340D808)
- 05000133/LER-1980-007, Forwards LER 80-007/03L-0 + (ML19340D809)
- ML19340D812 + (ML19340D812)
- 05000133/LER-1980-007-03, /03L-0:on 801130,sparks Observed Coming from Fire Pump 2 Diesel Engine Fan Area During Testing.Caused by Pulley Sheave Mounting Flange Breaking Away from Hub.New Part Mfg on Site + (ML19340D813)
- ML19340D815 + (ML19340D815)
- ML19340D816 + (ML19340D816)
- ML19340D818 + (ML19340D818)
- 05000320/LER-1980-058-01, /01P-0:on 801223,determined That Placing Radiation Monitor HRP-220 in Defeat on 801219 Constituted Reportable Condition.Caused by Instrument Malfunction.Repairs Completed + (ML19340D819)
- ML19340D820 + (ML19340D820)
- ML19340D821 + (ML19340D821)
- 05000271/LER-1980-040, Forwards LER 80-040/03L-0 + (ML19340D822)
- ML19340D823 + (ML19340D823)
- ML19340D824 + (ML19340D824)
- PM-80-123, Ro:On 801213,sprinkler Sys Providing Protection for Reactor Bldg Heating,Ventilation & Air Conditioning Had Been Inoperative for 14 Days.Caused by Implementation of Design Mods to Bring Sys Into NFPA Code Compliance + (ML19340D825)
- 05000266/LER-1980-014, Forwards LER 80-014/01T-0 + (ML19340D826)
- ML19340D827 + (ML19340D827)
- ML19340D828 + (ML19340D828)
- 05000368/LER-1980-091, Forwards LER 80-091/01T-0 + (ML19340D829)
- ML19340D830 + (ML19340D830)
- 05000271/LER-1980-040-03, /03L-0:on 801130,discovered Continuous Environ Air Samples at Sample Station AT2.2 Not Being Drawn.Caused by Main Fuse Blowing Out.Entire Station Replaced & Electrical Surge Suppressor Installed + (ML19340D831)
- ML19340D832 + (ML19340D832)
- ML19340D833 + (ML19340D833)
- 05000368/LER-1980-090, Forwards LER 80-090/03L-0 + (ML19340D835)
- ML19340D836 + (ML19340D836)
- ML19340D837 + (ML19340D837)
- 05000277/LER-1980-032-03, /03L-0:on 801202,low Pressure Switch Ps 2-2-134C Setpoint Found Lower than Tech Spec Limits.Caused by Setpoint Drift of Barksdale Model B2T-A12SS Pressure Switch. Switch Recalibr,Tested & Returned to Svc + (ML19340D838)
- ML19340D839 + (ML19340D839)
- A01327, Informs NRC That Util Has No Substantive Comments on NRC Draft Evaluation of SEP Topic VI-4, Electrical, Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation. Guidelines Are Not Applicable + (ML19340D840)
- 05000266/LER-1980-014-01, /01T-0:on 801211,results of Ongoing Refueling Outage Steam Generator Eddy Current Insp Indicated Defective Tubes.Eight Tubes W/Crevice Defects Taken Out of Svc.Caused by Corrosion.Defects Plugged + (ML19340D841)
- ML19340D842 + (ML19340D842)
- ML19340D843 + (ML19340D843)
- 05000368/LER-1980-089, Forwards LER 80-089/03L-0 + (ML19340D844)
- ML19340D845 + (ML19340D845)
- 05000366/LER-1980-163, Forwards LER 80-163/01T-1 + (ML19340D846)
- ML19340D847 + (ML19340D847)
- ML19340D848 + (ML19340D848)
- ML19340D849 + (ML19340D849)
- ML19340D850 + (ML19340D850)
- ML19340D851 + (ML19340D851)
- 05000366/LER-1980-163-01, /01T-1:on 801215,util Notified That Reactor Vessel Head Insulation Structure Did Not Conform to Seismic Class I Requirements.Caused by Failure to Incorporate Mods During Const.Insulation Structure Will Be Modified + (ML19340D852)
- ML19340D853 + (ML19340D853)
- ML19340D855 + (ML19340D855)
- ML19340D856 + (ML19340D856)
- ML19340D859 + (ML19340D859)