ML19340D847

From kanterella
Jump to navigation Jump to search
Forwards LER 80-163/01T-1
Date released: 12/20/2019 Download: ML19340D847


LER 80-163/01T-1:on 801215,util Notified That Reactor Vessel Head Insulation Structure Did Not Conform to Seismic Class I Requirements.Caused by Failure to Incorporate Mods During Const.Insulation Structure Will Be Modified
ML19340D852
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/23/1980
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19340D852 (2)
Forwards LER 80-163/01T-1
ML19340D846
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/23/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19340D846 (1)