Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19332D072 + (ML19332D072)
- ML19332D076 + (ML19332D076)
- ML19332D077 + (ML19332D077)
- ML19332D079 + (ML19332D079)
- ML19332D081 + (ML19332D081)
- ML19332D082 + (ML19332D082)
- ML19332D089 + (ML19332D089)
- ML19332D090 + (ML19332D090)
- ML19332D091 + (ML19332D091)
- ML19332D092 + (ML19332D092)
- W3P89-2127, Forwards Supplemental Info Re Util 890817 Response to Violations Noted in Insp Rept 50-382/89-17,per 891023 Request.Change to Operating Procedure OP-600-007 Approved to Address Actions Necessary to Be Taken by Operator + (ML19332D093)
- ML19332D094 + (ML19332D094)
- ML19332D095 + (ML19332D095)
- ML19332D096 + (ML19332D096)
- GO2-89-211, Forwards Rev 15 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (ML19332D097)
- ML19332D098 + (ML19332D098)
- SNRC-1659, Responds to Generic Ltr 89-21 Re Implementation Status of Usis.List of Usis,Included in Encl 1 to Generic Ltr,Encl + (ML19332D101)
- ML19332D102 + (ML19332D102)
- ML19332D104 + (ML19332D104)
- ML19332D105 + (ML19332D105)
- ML19332D106 + (ML19332D106)
- ML19332D107 + (ML19332D107)
- ML19332D108 + (ML19332D108)
- ML19332D112 + (ML19332D112)
- ML19332D113 + (ML19332D113)
- ML19332D115 + (ML19332D115)
- ML19332D116 + (ML19332D116)
- ML19332D118 + (ML19332D118)
- ML19332D120 + (ML19332D120)
- ML19332D122 + (ML19332D122)
- ML19332D126 + (ML19332D126)
- 05000423/LER-1989-026, :on 891023,turbine-driven Auxiliary Feedwater Pump Room Became Filled W/Steam During Monthly Surveillance Test.Caused by Personnel Inattention to Detail.Individual Counseled & Valves Closed + (ML19332D127)
- ML19332D128 + (ML19332D128)
- ML19332D129 + (ML19332D129)
- 3F1189-18, Forwards Response to Generic Ltr 89-21, Request for Info Re Status of Implementation of USI Requirements. Action on USI A-9 Re ATWS Will Be Completed During Refuel 7 Scheduled During Mar 1990 + (ML19332D130)
- ML19332D131 + (ML19332D131)
- ML19332D132 + (ML19332D132)
- ML19332D134 + (ML19332D134)
- ML19332D135 + (ML19332D135)
- ML19332D137 + (ML19332D137)
- ML19332D138 + (ML19332D138)
- 05000302/LER-1989-037, :on 891026,determined That Instrumentation Used to Balance HPI Flow Through Four Injection Lines During Small Break LOCA Inadequate.Caused by Inadequate Review of B&W Guidelines.Flow Instrument Installed + (ML19332D139)
- AECM-89-0191, Provides Further Clarification to 890815 Application for Amend to License NPF-29.Addl Info Approved by Plant Safety Review Committee + (ML19332D140)
- ML19332D141 + (ML19332D141)
- 05000293/LER-1989-031, :on 891024,closing Times for Two in-series Primary Containment Isolation Valves Exceeded Acceptance Criteria During Shutdown Testing.Cause Undetermined.Closing Time Retested W/Satisfactory Results + (ML19332D142)
- ML19332D143 + (ML19332D143)
- ML19332D144 + (ML19332D144)
- NL-89-693, Forwards Endorsement 3 to Nelia Certificate NW-117 & Endorsement 4 to Maelu Certificate MW-48 + (ML19332D145)
- ML19332D146 + (ML19332D146)
- ML19332D147 + (ML19332D147)
- ST-HL-AE-3295, Responds to NRC Re Violations Noted in Insp Rept 50-498/89-38.Corrective Actions:Operators Replaced Working Copy of Procedure OPOP08-FH-0009, Core Reflueling w/up-to- Date Copy & Articles Removed or Tied Down + (ML19332D148)