Text
n p
}'
9 y
h' TOLEDO
~
k.,
%s EDISON
~
p,,f
' Docket Number 50-346
- . M7 a c wor wrw om ~
[
c License Number NPF ;
DONALD C. SHELTON b
- w. pr.muo..e Serial Number 1717-e sweesam p
4
+
' November 22, 1989 yc 1
k
- United States Nuclear Regulatory Commission
' Document Control Desk =
Washington, D. C.
20555
Subject:
Cancellation of Davis-Besse Plant Control Center Project Gentlertn a -
3 The purpose of this' letter is to inform the Nuclear Regulatory Commission (NRC) that. Toledo Edison has no further plans for development of a Plant Control Center (PCC)'at the Davis-Besse Nuclear Power Station; 1
During 1985, Toledo Edison began examining the possibility of developing ~an additional. Emergency Response Facility within the Davis-Besse site protected area.- 'The' proposed PCC was to serve-several functions. One function would have been to enhance management's in-plant response:to-transients and
[,
. emergencies.. Normal functions would have been'to serve as a conference room Lfo,r senior plant management and' Systems Engineering, as well as an office for th'e Shift Managers; Additionall'y, it was being designed such that, if necessary, the PCC could have fulfilled some of'the Technical Support Center l
L 1 requirements of Supplement 1 to.NUREG 0737.
H
^
- Recently, Toledo Edison completed a further investigation into the need for a-facility'at1 Davis-Besse such as that described above. Based on current b
facility capabilities and other planned improvements, Toledo Edison has-l ~
Leoncluded.'that the PCC project is unnecessary. Davis-Besse vill-continue to I
meet the needs and requirements of Emergency Preparedness with existing site j
4
-facilities.
Should you have any questions or require additional information, please i
c contact Mr. R. V. Schrauder, Nuclear Licensing Manager, at (419) 249-2366.
30$
Very truly yours,
, 3M.on.
so M
AVA/ssg
'.oo :
~ oC3
/4 Loc-cci P.-Byron, DB-1 Senior Resident Inspector O
M A. B. Davis, Regional Administrator, NRC Region III 8
T. V. Vambach, DB-1 NRC Senior Project Manager 0
M
?.
(ca.b THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 f
~
.e
-2