Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19330B603 + (ML19330B603)
- ML19330B605 + (ML19330B605)
- ML19330B607 + (ML19330B607)
- ML19330B608 + (ML19330B608)
- 05000368/LER-1980-045, Forwards LER 80-045/04L-0 + (ML19330B609)
- ML19330B610 + (ML19330B610)
- ML19330B612 + (ML19330B612)
- ML19330B616 + (ML19330B616)
- ML19330B618 + (ML19330B618)
- ML19330B622 + (ML19330B622)
- ML19330B623 + (ML19330B623)
- ML19330B624 + (ML19330B624)
- 05000293/LER-1980-033, Forwards LER 80-033/03L-0 + (ML19330B627)
- ML19330B628 + (ML19330B628)
- ML19330B629 + (ML19330B629)
- ML19330B630 + (ML19330B630)
- PNO-I-80-105, on 800722,one-man Picket Was Set at Main Entrance to Protest Use of Nonunion Contractor.All Union Employees Expected to Honor Picket Line.Licensee Plans Operators Shift Schedule of 18 Supervisory Personnel + (ML19330B631)
- 05000293/LER-1980-033-03, /03L-0:on 800701,during Test,Nitrogen Purge Valve Did Not Close within Prescribed 10-s Limit.Cause Not Stated. Stroke Length Reduced,Valve Tested Satisfactorily & Returned to Svc + (ML19330B632)
- 05000312/LER-1980-032, Forwards LER 80-032/03L-0 + (ML19330B633)
- 05000293/LER-1980-031, Forwards LER 80-031/04T-0 + (ML19330B635)
- ML19330B636 + (ML19330B636)
- 05000312/LER-1980-032-03, /03L-0:on 800712,during Routine Surveillance Test on Auxiliary Feedwater pump,P-318,pump Failed to Start from Control Room.Cause Undetermined.After Successfully Starting for Five Days,Pump Returned to Svc + (ML19330B637)
- PNO-I-80-108, on 800723,painter Was Working W/Solvent Inside Downcomer & Solvent Detonated.Painter Was Taken to Hosp W/Burns on 25% of Body + (ML19330B638)
- 05000293/LER-1980-031-04, /04T-0:on 800721,mussel Sample Concentration of Co-60 Exceeded 10 Times Lower Limit of Detection.Caused by Pilgrim Station Operation.Annual Dose to Humans Is Not Significant Per Reg Guide 1.109 + (ML19330B639)
- ML19330B640 + (ML19330B640)
- ML19330B642 + (ML19330B642)
- ML19330B643 + (ML19330B643)
- ML19330B644 + (ML19330B644)
- ML19330B646 + (ML19330B646)
- 05000295/LER-1980-035, Forwards LER 80-035/01T-0 + (ML19330B647)
- ML19330B649 + (ML19330B649)
- AECM-80-169, Interim Deficiency Rept 2 Re Rodent Damage to Cable Insulation Involved W/Rhr Sys.Investigation Incomplete.Final Rept to Be Submitted by 801016 + (ML19330B650)
- 05000295/LER-1980-035-01, /01T-0:on 800720,wastewater Treatment Facility Effluent Ph Was Below Tech Spec Limit.Caused by Incorrect Setting on Aluminum Sulfate Chemical Feed Sys.Potentiometer Controlling Feed Rate Reset + (ML19330B651)
- ML19330B652 + (ML19330B652)
- 05000295/LER-1980-034, Forwards LER 80-034/01T-0 + (ML19330B653)
- A01137, Responds to IE Bulletin 80-17,Suppl 2, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. Mod Expending Three man-days Performed 800722 on North Side Scram Discharge Vol Vent + (ML19330B656)
- 05000295/LER-1980-034-01, /01T-0:on 800710,possibility Discovered of Insufficient Indication of Boron Dilution While on RHR with Shutdown Margin Below 5%.FSAR Did Not Use Flow/Mixing Model for Analysis.Potential Damage Assessment in Progress + (ML19330B657)
- ML19330B658 + (ML19330B658)
- ML19330B659 + (ML19330B659)
- ML19330B663 + (ML19330B663)
- ML19330B664 + (ML19330B664)
- 05000271/LER-1980-021, Forwards LER 80-021/03L-0 + (ML19330B666)
- ML19330B667 + (ML19330B667)
- ML19330B668 + (ML19330B668)
- ML19330B670 + (ML19330B670)
- 05000271/LER-1980-021-03, /03L-0:on 800630,during Weekly Environ Air Sample Collections,Incomplete Samples Collected at Three Stations. Caused by Failed Pumps Due to Damaged Bearings.New Pumps Installed.Pump & Ventilation Mods Being Evaluated + (ML19330B671)
- ML19330B674 + (ML19330B674)
- ML19330B675 + (ML19330B675)
- ML19330B676 + (ML19330B676)
- ML19330B677 + (ML19330B677)
- ML19330B678 + (ML19330B678)