ML19330B667

From kanterella
Jump to navigation Jump to search
Forwards LER 80-021/03L-0
Date released: 12/10/2019 Download: ML19330B667


LER 80-021/03L-0:on 800630,during Weekly Environ Air Sample Collections,Incomplete Samples Collected at Three Stations. Caused by Failed Pumps Due to Damaged Bearings.New Pumps Installed.Pump & Ventilation Mods Being Evaluated
ML19330B671
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/31/1980
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19330B671 (2)
Forwards LER 80-021/03L-0
ML19330B666
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/31/1980
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19330B666 (1)