Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19327B148 + (ML19327B148)
- PNO-I-89-087, on 891019,when Placing Feedwater Regulating Valve (FRV) in Svc,Frv a Failed Fully Open,Causing Main Turbine to Trip Automatically on High Reactor Vessel Water Level Which Caused Reactor to Scram.Bolt Found Under Seat + (ML19327B149)
- 05000333/LER-1989-016, :on 890918,scram Signal Automatically Initiated During Transfer of Power Supply for Reactor Protection Sys. Caused by Lack of Caution Statement in Procedure.Procedure Revised to Add Time Caution for Bus Transfers + (ML19327B150)
- 05000369/LER-1989-026-01, :on 890720,both Trains of Control Area Ventilation Sys Inoperable.Caused by Design Deficiency Because of Unanticipated Interaction of Components.Original Check Damper Reinstalled in Fan on Train B + (ML19327B151)
- 05000333/LER-1989-017, :on 890920,ESFAS Initiated Group II Primary Containment Isolation Signal Triggering RHR & LPCI Sys Isolations.Caused by Cognitive Human Error in Not Finding Isolation Signal.Fuse Replaced & Sys Restarted + (ML19327B152)
- ML19327B153 + (ML19327B153)
- ML19327B154 + (ML19327B154)
- ML19327B155 + (ML19327B155)
- ML19327B156 + (ML19327B156)
- ML19327B157 + (ML19327B157)
- ML19327B158 + (ML19327B158)
- ML19327B159 + (ML19327B159)
- ML19327B160 + (ML19327B160)
- ML19327B161 + (ML19327B161)
- RBG-31638, Responds to NRC Bulletin 88-010,Suppl 1.Traceability of Circuit Breakers Established Through Mfg Certificate of Conformance + (ML19327B162)
- ML19327B163 + (ML19327B163)
- NRC-89-0214, Submits Addl Info Re 890914 Request for Deferral of Human Engineering Discrepancy 1178 on MSIV Actuation Indication Lights,Providing Technical Justification for Acceptance of Request + (ML19327B164)
- ML19327B166 + (ML19327B166)
- B13358, Application for Amend to License NPF-49,changing Tech Specs to Require Both Input Relay Trains of Any Reactor Protection Sys or ESFs Channel to Be Included in Response Time Testing of Channel + (ML19327B167)
- ML19327B168 + (ML19327B168)
- ML19327B169 + (ML19327B169)
- ML19327B170 + (ML19327B170)
- ML19327B171 + (ML19327B171)
- ML19327B172 + (ML19327B172)
- ML19327B173 + (ML19327B173)
- ML19327B175 + (ML19327B175)
- ML19327B177 + (ML19327B177)
- IR 05000498/1989034 + (ML19327B178)
- ML19327B180 + (ML19327B180)
- ML19327B181 + (ML19327B181)
- ML19327B182 + (ML19327B182)
- ML19327B183 + (ML19327B183)
- 1CAN108908, Monthly Operating Rept for Sept 1989 for Arkansas Nuclear One Unit 1 + (ML19327B184)
- 05000334/LER-1989-011-01, :on 890920,engineering Determined That Rupture Restraint Gaps Were Opened to Greater than Original Design Analysis.Caused by Alignment Performed During Hot Functional Testing.Design Change Mod to Be Performed + (ML19327B185)
- ML19327B186 + (ML19327B186)
- ML19327B187 + (ML19327B187)
- ML19327B188 + (ML19327B188)
- ML19327B189 + (ML19327B189)
- ML19327B191 + (ML19327B191)
- IR 05000295/1989033 + (ML19327B192)
- ML19327B194 + (ML19327B194)
- ML19327B196 + (ML19327B196)
- ML19327B198 + (ML19327B198)
- ML19327B199 + (ML19327B199)
- ML19327B201 + (ML19327B201)
- ML19327B203 + (ML19327B203)
- ML19327B204 + (ML19327B204)
- ML19327B207 + (ML19327B207)
- 05000353/LER-1989-008-02, :on 890922,discovered That Normally Open Manual Emergency Svc Water Isolation Valve Found to Be in Closed Position.Exact Cause Not Determined.Valve Promptly Opened. Administrative Procedure A-8 Revised + (ML19327B208)
- ML19327B209 + (ML19327B209)
- ML19327B211 + (ML19327B211)