- ML19309E554 + (ML19309E554)
- 05000010/LER-1980-002, Forwards LER 80-002/01T-0 + (ML19309E555)
- ML19309E556 + (ML19309E556)
- 05000293/LER-1980-012-03, /03L-0:on 800312,while Performing Surveillance Test,Found That Pressure Switch 263-52A Setpoint Had Drifted.Cause Not Stated.Setpoint Drift Is Recurring Problem.Pressure Switch Recalibr + (ML19309E558)
- 05000366/LER-1980-033-03, /03L-0:on 800331,while in Cold Shutdown,Triaxial Peak Recording Accelerometers on Reactor Pedestal & Feedwater Inlet Line Were Not Calibr within Time Limit. Caused by Instrument Failure During Calibr + (ML19309E559)
- ML19309E560 + (ML19309E560)
- 05000338/LER-1980-037, Forwards LER 80-037/01T-0 + (ML19309E561)
- ML19309E562 + (ML19309E562)
- 05000366/LER-1980-037, Forwards LER 80-037/03L-0 + (ML19309E563)
- ML19309E564 + (ML19309E564)
- 05000338/LER-1980-037-01, /01T-0:on 800403,at Full Power Operation,Eccs Was Initiated Due to Full Closure of Main Steam Trip Valve During part-stroke Exercising of Valve.Caused by Test Being Performed at Full Steam Flow + (ML19309E565)
- ML19309E566 + (ML19309E566)
- 05000346/LER-1980-008, Forwards Revised LER 80-008/03L-1 + (ML19309E567)
- ML19309E568 + (ML19309E568)
- 05000366/LER-1980-037-03, /03L-0:on 800328,while in Cold Shutdown & Performing Reactor Water Chemistry,Noted Chloride Concentration Was 0.116 Ppm.Cause Attributed to Reactor Water Cleanup Sys Out for 26-days.Cleanup Sys Fixed + (ML19309E569)
- ML19309E570 + (ML19309E570)
- 05000295/LER-1980-013, Forwards LER 80-013/03L-0 + (ML19309E571)
- 05000366/LER-1980-034, Forwards LER 80-034/03L-0 + (ML19309E573)
- ML19309E574 + (ML19309E574)
- 05000366/LER-1980-040, Forwards LER 80-040/03L-0 + (ML19309E575)
- ML19309E576 + (ML19309E576)
- 05000346/LER-1980-008-03, Gap Discovered in Wall Where Five two-inch Conduits Go from Electrical Penetration Room 2 to Cable room.Six-inch Gap Around Ventilation Duct Also Found.Caused by Improper Initial Installation + (ML19309E577)
- 05000366/LER-1980-034-03, /03L-0:on 800320,while Performing Calibr on Main Steam Line,Temp Switches 2B21-N010A,N013A & N013D Found to Have Bad Repeatability.Caused by Instrument Drift.Calibr Procedure Revised + (ML19309E578)
- 05000295/LER-1980-013-03, /03L-0:on 800314,while Performing Periodic Radiation Surveillance of Auxiliary Bldg Area Monitor ORT-AR09,monitor Read Low by Factor Greater than Five.Caused by Instrument Drift by Normal Variation or Accidental Reset + (ML19309E579)
- 05000336/LER-1980-015, Forwards LER 80-015/03L-0 + (ML19309E580)
- ML19309E581 + (ML19309E581)
- 05000366/LER-1980-040-03, /03L-0:on 800331,during Review of Outage Surveillance Requirements,Cycle Surveillances Required by Amend 12 to Tech Specs Had Not Been Conducted.Caused by Operational Conflict.Tests Will Be Performed Before Startup + (ML19309E582)
- 05000321/LER-1980-031, Forwards LER 80-031/03L-0 + (ML19309E583)
- ML19309E586 + (ML19309E586)
- 05000325/LER-1980-019, Forwards LER 80-019/03L-0 + (ML19309E587)
- ML19309E588 + (ML19309E588)
- ML19309E589 + (ML19309E589)
- 05000336/LER-1980-015-03, /03L-0:on 800321,following Reactor Trip,Condensate Storage Tank Level Was Below Tech Spec Requirements.Caused by Gland Seal Header Relief Valve Being Stuck Open, Necessitating Use of Auxiliary Feedwater Sys + (ML19309E590)
- 05000010/LER-1980-002-01, /01T-0:on 800405,while in Shutdown Mode W/Fuel Removed,Contaminated Demineralized Water Was Being Heated & Added to Primary Sys.Tube Leaks in Heat Exchanger Were Found Leaking Water Into River.Caused by Unloader Tube Failure + (ML19309E591)
- 05000321/LER-1980-031-03, /03L-0:on 800330,while Operating at 99.8% of Rated Mwt,Main Stack Radiation Monitor Sample Pump Failed.Cause Attributed to Moisture Swelling Carbon Vanes in Pump,Locking Pump.Sampling Procedure Will Be Revised + (ML19309E592)
- ML19309E594 + (ML19309E594)
- 05000325/LER-1980-019-03, /03L-0:on 800318,while Performing High Steamline Radiation Channel Alignment & Functional Test,Drawer D12-RM-K603D,Model 238X660G3,was Found Out of Specs.Caused by Instrument Drift.Drawer Recalibr + (ML19309E595)
- 05000321/LER-1980-030, Forwards LER 80-030/03L-0 + (ML19309E596)
- ML19309E598 + (ML19309E598)
- 05000368/LER-1980-017, Forwards LER 80-017/03L-0 + (ML19309E599)
- ML19309E600 + (ML19309E600)
- 05000304/LER-1980-002, Forwards Updated LER 80-002/03X-1 + (ML19309E601)
- ML19309E603 + (ML19309E603)
- 05000327/LER-1980-020, Forwards LER 80-020/01T-0 + (ML19309E604)
- ML19309E606 + (ML19309E606)
- 05000259/LER-1980-001, Supplemental LER 80-001/01T-1:on 800107,during Performance of Ster 7902 Per IE Bulletin 79-23,diesel Generator 3A Lost Speed Control.Caused by Deteriorated Elastomer Spider Coupling.Spider Coupling Replaced + (ML19309E607)
- 05000304/LER-1980-002-03, During Steady State Operation,Pressure Transmitters 2PT-526 for Steam Generator 2B & 2PT-546 for Steam Generator 2C Failed High.Caused by Cold Drafts Freezing Instrument Root Lines + (ML19309E608)
- 05000368/LER-1980-017-03, /03L-0:on 800316,during Mode 3 Operation,A Steam Generator Pressure Indicator 2 PI-1041-4N on Channel D Failed High.Caused by Electronic Output of Pressure Transmitter Plant Protection Sys Failing High + (ML19309E609)
- 05000366/LER-1980-043, Forwards LER 80-043/03L-0 + (ML19309E610)
- ML19309E611 + (ML19309E611)
- 05000327/LER-1980-020-01, /01T-0:on 800404,investigation Revealed That Several vendor-designed Pipe Supports Were Designed Utilizing Manufacturer Std 0.25-inch U-bolt Which Overstressed During Seismic Event.Caused by Design Error + (ML19309E614)