Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19305A850 + (ML19305A850)
- ML19305A851 + (ML19305A851)
- ML19305A852 + (ML19305A852)
- 05000346/LER-1980-016, Forwards LER 80-016/03L-0 + (ML19305A853)
- ML19305A854 + (ML19305A854)
- 05000325/LER-1980-014, Forwards LER 80-014/03L-0 + (ML19305A857)
- ML19305A858 + (ML19305A858)
- 05000346/LER-1980-016-03, /03L-0:on 800213,while Reviewing Station Log,Shift Foreman Discovered That Containment Airlock Seal Leakage Test Had Not Been Performed After Last Entry Into Containment During Startup.Caused by Procedural Inadequacy + (ML19305A859)
- TXX-3106, Advises That Motorized Svc Water Strainers Have Been Deleted from Facility Design + (ML19305A860)
- 05000325/LER-1980-014-03, /03L-0:on 800214,while Performing Suppression Pool High Water Channel Functional Test,Manual Isolation Valve on Low Side of 1E41-LSH-N015A Was Found Closed.Cause Not Known.Valve Reopened + (ML19305A861)
- ML19305A863 + (ML19305A863)
- ML19305A864 + (ML19305A864)
- ML19305A865 + (ML19305A865)
- ML19305A866 + (ML19305A866)
- ML19305A867 + (ML19305A867)
- ML19305A870 + (ML19305A870)
- ML19305A871 + (ML19305A871)
- ML19305A873 + (ML19305A873)
- ML19305A875 + (ML19305A875)
- 05000260/LER-1980-009, Forwards LER 80-009/03L-0 + (ML19305A876)
- ML19305A877 + (ML19305A877)
- ML19305A878 + (ML19305A878)
- 05000260/LER-1980-010, Forwards LER 80-010/03L-0 + (ML19305A880)
- ML19305A881 + (ML19305A881)
- ML19305A882 + (ML19305A882)
- ML19305A883 + (ML19305A883)
- 05000259/LER-1980-018, Forwards LER 80-018/03L-0 + (ML19305A884)
- ML19305A885 + (ML19305A885)
- ML19305A886 + (ML19305A886)
- 05000260/LER-1980-010-03, /03L-0:on 800216,during Hot Shutdown,Crack Was Found in HPCI Turbine Coupling Bearing Support Pedestal. Probably Caused by Water Hammer While Warming HPCI from out- of-svc Condition.New Pedestal Installed + (ML19305A887)
- 05000260/LER-1980-009-03, /03L-0:on 800213,during Normal Operation,Steam Line B Radiation Monitor 2-RM-90-138 Failed Downscale Resulting in Half Scram & Half Isolation.Caused by Loss of Power Output from Power Drawer.Power Drawer Replaced + (ML19305A888)
- TMI-19-097, License Amendment Request - License Condition Revision for Removal of Cyber Security Plan Requirements + (ML19305A889)
- ML19305A890 + (ML19305A890)
- ML19305A891 + (ML19305A891)
- 05000259/LER-1980-018-03, /03L-0:on 800217,during Refueling Operations 4 Kv Shutdown Board B Alternate Feeder Failed to Close During Board Transfer Test.Cause Unknown.Failure Appears Random + (ML19305A892)
- ML19305A893 + (ML19305A893)
- ML19305A894 + (ML19305A894)
- 05000271/LER-1980-011, Forwards LER 80-011/01P-0 + (ML19305A895)
- ML19305A896 + (ML19305A896)
- ML19305A897 + (ML19305A897)
- 05000133/LER-1980-001, Forwards LER 80-001/03L-0 + (ML19305A898)
- 05000278/LER-1980-004, Forwards LER 80-004/03L-0 + (ML19305A900)
- ML19305A901 + (ML19305A901)
- ML19305A902 + (ML19305A902)
- 05000271/LER-1980-011-01, /01P-0:on 800312,investigation of Onsite Power Distribution Sys Revealed Voltage for Continuous Operation of Some 480 Volt Sys Loads Below Min Required Voltage.Caused by Incomplete Analysis of Sys When Transformers Replaced + (ML19305A903)
- ML19305A904 + (ML19305A904)
- ML19305A905 + (ML19305A905)
- 05000133/LER-1980-001-03, /03L-0:on 800210,during Routine Testing,Fire Water Sys Header Low Pressure Switch Started Fire Pumps at 44 Psig.Caused by Setpoint Drifting Due to Loosening of Setpoint Retainer.Setpoint Was Adjusted + (ML19305A906)
- 05000278/LER-1980-004-03, /03L-0:on 800205 During Plant Startup,Reactor Water Conductivity Increased & Exceeded Tech Spec Limits. Caused by Resin Injection.Reactor Was Shut Down & Primary Coolant Chemistry Brought within Tech Spec Limits + (ML19305A907)
- ML19305A908 + (ML19305A908)
- ML19305A909 + (ML19305A909)