- ML18040A901 + (ML18040A901)
- PLA-3043, Provides Revised Response to NRC Re Violations Noted in Insp Repts 50-387/87-19 & 50-388/87-19.Corrective Actions:Incumbent Will Be Removed from Emergency Plan Position of Radiation Protection Coordinator + (ML18040A902)
- PLA-3063, Forwards Approved Version of Topical Rept PL-NF-87-001-A, Qualification of Steady State Core Physics Methods for BWR Design & Analysis, Per + (ML18040A903)
- PLA-3065, Forwards Rev 39 to Updated FSAR for Susquehanna Steam Electric Station Units 1 & 2 Per 10CFR50.71 + (ML18040A904)
- PLA-3062, Forwards GE Rept, Susquehanna Unit 1 CRD Housing Cap Screw Corrosion. Rept Completes Action on Item + (ML18040A906)
- ML18040A908 + (ML18040A908)
- PLA-3075, Forwards Application for Amend to License NPF-14,extending Operation During Cycle 4 W/One Circulation Loop Out of Svc. Fee Paid + (ML18040A910)
- PLA-3046, Informs That Mods Re Fire Barrier Upgrades,Hvac Fan Switches,Ct Secondaries & Raceway Wrapping Completed Except as Listed + (ML18040A911)
- 05000387/LER-1988-018-05, :on 880824,discovered That RWCU Pump Room Ambient Temp Sensor Not Installed Per Design.Caused by Lack of Installation Detail on Design Documents for Steam Leak Detection Sys.Tech Spec Change Submitted + (ML18040A912)
- ML18040A913 + (ML18040A913)
- 0CAN021801, Notification of Confirmatory Action Letter Focus Area Inspection Readiness + (ML18040A918)
- ML18040A920 + (ML18040A920)
- ML18040A921 + (ML18040A921)
- ML18040A922 + (ML18040A922)
- PLA-3141, Forwards Application for Amend to License NPF-14,consisting of Proposed Amend 119,changing Tech Specs in Support of Ensuing Cycle 5 Reload + (ML18040A923)
- ML18040A925 + (ML18040A925)
- PLA-3162, Discusses Util Position Re Completion & Implementation of NRC Requested Actions Specified in Suppl 1 to NRC Bulletin 88-007, Power Oscillations in Bwrs + (ML18040A926)
- PLA-3165, Forwards Rev 6 to ISI-T-100.0 for Unit 1 & Rev 3 to ISI-T-200.0 for Unit 2 Pump & Valve Inservice Insp Testing Program + (ML18040A927)
- ML18040A929 + (ML18040A929)
- PLA-3192, Responds to 890322 Request for Addl Info Re Plant Fire Protection Review Rept.Analysis of Circuits Having Potential for Being Impacted by Fire Resulting in Multiple High Impedence Faults Will Be Completed by Last Quarter 1989 + (ML18040A930)
- ML18040A931 + (ML18040A931)
- ML18040A935 + (ML18040A935)
- ML18040A937 + (ML18040A937)
- ML18040A939 + (ML18040A939)
- PLA-3247, Requests Concurrence W/Scheduling of 1990 Annual NRC Observed Emergency Preparedness Exercise at Plant on 900502. Concurrence Requested by 890930 + (ML18040A942)
- ML18040A944 + (ML18040A944)
- ML18040A946 + (ML18040A946)
- ML18040A949 + (ML18040A949)
- ML18040A955 + (ML18040A955)
- PLA-3341, Forwards Schedules That Provide Details of Tasks Required to Complete Activities Re Diesel Generators & Advises of Plan to Have Spare Parts on Site in Timely Manner to Support Each Diesel Insp + (ML18040A960)
- PLA-5018, Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits + (ML18040A965)
- ML18040A966 + (ML18040A966)
- PLA-5025, Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr .Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr + (ML18040A967)
- PLA-5022, Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 + (ML18040A968)
- PLA-5040, Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits + (ML18040A969)
- ML18040A970 + (ML18040A970)
- ML18040A972 + (ML18040A972)
- PLA-5067, Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant + (ML18040A973)
- PLA-5082, Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant + (ML18040A974)
- PLA-1621, Forwards Response to Generic Ltr 82-33,Suppl 1 to NUREG-0737, Requirements for Emergency Response Capability. W/One Oversize Encl.Aperture Card Is Available in PDR + (ML18040B007)
- PLA-1698, Forwards Supplemental Response to SER Open Item 3.10.1(3). Fatigue Cycling Effects on NSSS Equipment Due to Safety Relief Loads (License Condition 23(a)) Discussed + (ML18040B008)
- ML18040B016 + (ML18040B016)
- ML18040B017 + (ML18040B017)
- PLA-1785, Forwards Rev to FSAR Chapter 18 Reflecting Responses to TMI Items.Chapter Will Be Included in Next FSAR Amend + (ML18040B018)
- ML18040B020 + (ML18040B020)
- PLA-1823, Forwards Rev 4 to Equipment Qualification Rept in Response to Items 1.9 & 3.11.1(1)a of Suppl 5 to SER & 10CFR50.49(i). Rev Represents Dynamic & Environ Qualification Program Status as of 830901 + (ML18040B021)
- ML18040B022 + (ML18040B022)
- ML18040B023 + (ML18040B023)
- PLA-1870, Forwards Rev to Section 14.2 of FSAR Re Proposed Startup Test Program for Unit 2 & Clarification of Unit 1 Startup Test Program.Revs Will Be Incorporated Into Next FSAR Amend + (ML18040B025)
- PLA-1795, Forwards Revised FSAR Sections 14.2.12.4 & 14.2.12.5 Covering Preoperational Test Program.Revs Will Be Incorporated in Next FSAR Amend + (ML18040B026)
- ML18040B027 + (ML18040B027)