Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18022A928 + (ML18022A928)
- ML18022A930 + (ML18022A930)
- IR 05000400/1994012 + (ML18022A931)
- HNP-94-065, Forwards ISI Summary 1st Interval,2nd Period,5th Refueling Outage 1-2-05 Completed 940803, in Accordance W/Asme Boiler & PV Code,Section Xi,Article IWA-6220(b) + (ML18022A933)
- HNP-94-071, Transmits Rev 23 to Emergency Plan PLP-201 & Rev 4 to EPIP- PEP-001,rev 8 to EPIP PEP-101,rev 12 Change 4 to EPIP PEP-102,rev 10 to EPIP PEP-103, Rev 6 to EPIP PEP-104,rev 6 to EPIP PEP-201 & Rev 5 to EPIP PEP-202 + (ML18022A936)
- ML18022A941 + (ML18022A941)
- ML18022A945 + (ML18022A945)
- HNP-95-019, Forwards Request for Enforcement Discretion from TS 3.3.1, Table 3.3-1, RTS Instrumentation & 3.3.2,Table 3.3-3, ESFAS Instrumentation, Permitting Continued Operation W/ Ssps Inoperable for Longer than Allowed by TS 3.3.2 + (ML18022A946)
- ML18022A947 + (ML18022A947)
- ML18022A948 + (ML18022A948)
- HNP-95-016, Proposed Tech Specs 3.1.1.2 Re Relocating Shutdown Margin Vs Boron Concentration Curve to COLR + (ML18022A949)
- ML18022A950 + (ML18022A950)
- IR 05000207/2002017 + (ML18022A951)
- HNP-95-097, Forwards Vols 1 & 2 of Special Rept - SG Tube ISI Results RFO 5. Rept Provides Results of SG Tube ISIs Performed in Apr 1994 + (ML18022A952)
- ML18022A954 + (ML18022A954)
- ML18022A957 + (ML18022A957)
- ML18022A958 + (ML18022A958)
- ML18022A960 + (ML18022A960)
- ML18022A962 + (ML18022A962)
- 05000400/LER-1995-005-02, :on 950731,TS Violation Occurred Due to Missed Compensatory Vent Stack Flow Rate Estimate.Counseled Individual Involved & Training for Appropriate Operations Personnel Will Be Performed + (ML18022A963)
- HNP-95-075, Provides Update on Review Process & Approach to Resolving Concerns W/Mechanical Properties of Thermo-Lag Fire Barriers,In Response to GL 92-08 + (ML18022A964)
- HNP-95-084, Forwards Rev 25 to Vol 1 to Shearon Harris Nuclear Power Plant Emergency Plan, Replacing Pages of Previous Rev W/ Exception of Emergency Action Level Flow Paths,Remaining Same as Previous Rev.W/One Oversize Drawing + (ML18022A965)
- 05000400/LER-1995-007-01, :on 950901,inadvertent Start of Turbine Driven AFW Pump/Unplanned ESF Actuation Occurred Due to Inadequate Test Procedures.Revised Appropriate Procedures + (ML18022A968)
- 05000400/LER-1995-008-01, :on 950902,charging/SI Pump B (Csip) Returned to Svc Prior to Required Acceptance Testing.Caused by Personnel Error.Csip a Placed in Svc on 950902 & Csip B Declared Inoperable + (ML18022A969)
- HNP-95-087, Part 21 Rept Re Failure of Charging SI Pump Miniflow Check Valves.Caused by Cocking of Piston Towards Valve Outlet Port Due to Large Hydraulic Surge.Valves That Experienced Failures Replaced + (ML18022A970)
- ML18022A971 + (ML18022A971)
- IR 05000400/1995013 + (ML18022A973)
- ML18022A974 + (ML18022A974)
- HNP-95-086, Special Rept,Identifying Number of SG Tubes Plugged as Result of Recent SG Tube ISI Conducted During Refueling Outage 6 + (ML18022A975)
- HNP-95-091, Forwards Application for Renewal of NPDES Permit NC0039586, Submitted to Nc Div of Environ Mgt on 951003 + (ML18022A976)
- 05000400/LER-1996-012, :on 960724,SIII Inverter Was Taken OOS for Repair.Caused by Faulty ferro-resonant Transformer within Inverters Internal Circuitry.Repairs & Load Testing for Siii Were Completed + (ML18022A986)
- HNP-96-138, Forwards One Copy of Rev 28 to Shnpp Emergency Plan (PLP- 201) Which Replaces All Pages of Previous Revs + (ML18022A987)
- ML18022A990 + (ML18022A990)
- HNP-96-141, Forwards Special Rept Which Provides Results of SG Tube ISI Performed in Sept 1995 During Plant Refueling Outage 6 + (ML18022A993)
- ML18022A994 + (ML18022A994)
- ML18022A995 + (ML18022A995)
- HNP-97-027, Supplements Utils Re Violations Noted in Insp Rept 50-400/96-10.Corrective Actions: a ESW Pump Will Be Replaced During Refueling Outage 7 & Procedure AP-107, TS Interpretations, Has Been Revised to Clarify Purpose + (ML18022A999)
- HNP-97-043, Application for Amend to License NPF-63,amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded ST Tubes.Trs encl.CEN-630-P,rev 1 Withheld + (ML18022B001)
- HNP-97-059, Application for Amend to License NPF-63,increasing AOT for Refueling Water Storage Tank to Twelve Hs While Performing TS Surveillance 4.4.6.2.2 + (ML18022B002)
- ML18022B003 + (ML18022B003)
- ML18022B004 + (ML18022B004)
- HNP-97-036, Application for Amend to License NPF-63,revising TS 3.5.1 to Provide Optional Method of Meeting Surveillance Requirement & to Add New Action Statement Re Boron Concentration + (ML18022B005)
- ML18022B006 + (ML18022B006)
- ML18022B007 + (ML18022B007)
- HNP-97-065, Transmits Rev 30 to Shearon Harris Nuclear Power Plant Emergency Plan (PLP-201).Changes Include Evacuation Time Estimate Update,Positions of Responsibility,Changes to General Info & Correction of Clerical Errors + (ML18022B008)
- NL-17-2015, Response to NRC RAIs Regarding Decommissioning Funding Status Reports + (ML18022B011)
- HNP-97-084, Annual Radioactive Effluent Release Rept 960101-1231 + (ML18022B014)
- 05000400/LER-1997-006, :on 970318,breach Was Identified in Thermo-Lag Fire Barrier Wall Due to Inadequate Initial Design,Poor Construction Methods & Incomplete as-built Design.Visual Insp of Thermo-Lag Barrier Walls Performed + (ML18022B015)
- HNP-97-091, Submits Completion of Spent Fuel Survey Commitments.Changes Will Be Incorporated in FSAR Amend 48 Scheduled for Issuance No Later than Six Months Following RFO7 Completion + (ML18022B016)
- HNP-97-092, Requests That Approval of Proposed Changes Be Issued Prior to 970430 to Support Installation & Testing of Proposed Mod Prior to Restart from Upcoming Refueling Outage Re EDG Protection During Testing Re 961114 Discovery of Deficiency + (ML18022B017)
- 05000400/LER-1997-014, :on 970514,SI Occurred During Ssps Surveillance Testing.Caused by Inattention to Detail During Recent Rev to Surveillance Test Procedure Being Used.Revised Deficient Surveillance Procedures + (ML18022B018)