Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-95-187, Comments on Proposed Rule Re, Review of NRC Insp Rept Content,Format & Style + (ML17353A247)
- ML17353A248 + (ML17353A248)
- IR 05000250/1995010 + (ML17353A250)
- L-95-202, Transmits Turkey Point Nuclear Plant Service Water Operational Performance Insp,Self Assessment,Final Rept + (ML17353A254)
- ML17353A255 + (ML17353A255)
- ML17353A256 + (ML17353A256)
- ML17353A257 + (ML17353A257)
- ML17353A259 + (ML17353A259)
- IR 05000250/1995012 + (ML17353A261)
- L-95-200, Forwards Info in Addition to Plant Previous Responses Re GL 92-08, Thermo-Lag 330-1 Fire Barriers + (ML17353A262)
- ML17353A263 + (ML17353A263)
- ML17353A264 + (ML17353A264)
- L-95-098, Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Table 4.3-1 Re Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels + (ML17353A265)
- ML17353A266 + (ML17353A266)
- ML17353A267 + (ML17353A267)
- L-95-160, Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.1.3.1, Movable Control Assemblies - Group Height & 3/4.1.3.2, Position Indication Sys - Operating & Asociated Bases + (ML17353A268)
- ML17353A269 + (ML17353A269)
- ML17353A270 + (ML17353A270)
- L-95-192, Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos + (ML17353A271)
- ML17353A272 + (ML17353A272)
- ML17353A273 + (ML17353A273)
- L-95-193, Application for Amends to Licenses DPR-31 & DPR-41,adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT + (ML17353A274)
- ML17353A275 + (ML17353A275)
- ML17353A276 + (ML17353A276)
- L-95-181, Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 + (ML17353A277)
- ML17353A278 + (ML17353A278)
- ML17353A280 + (ML17353A280)
- L-95-169, Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Per Selected Line Items from NRC GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation + (ML17353A281)
- ML17353A282 + (ML17353A282)
- ML17353A283 + (ML17353A283)
- L-95-205, Monthly Operating Repts for June 1995 for Turkey Point Units 3 & 4.W/950713 + (ML17353A284)
- ML17353A285 + (ML17353A285)
- ML17353A288 + (ML17353A288)
- L-95-219, Forwards fitness-for-duty Program Performance Data for Six Month Period Ending 950630,per 10CFR26.71(d) + (ML17353A292)
- L-95-201, Design Defect in Safeguards Bus Sequencer Logic Timing Places Both Units Outside Design Basis + (ML17353A293)
- ML17353A294 + (ML17353A294)
- 05000250/LER-1994-005, :on 941103,both Units Outside Design Basis Due to Design Defect in Safeguards Bus Sequencer Test Logic. Resumed Monthly Manual Testing of Sequencer + (ML17353A295)
- ML17353A296 + (ML17353A296)
- ML17353A297 + (ML17353A297)
- L-95-212, Updates Response Re Westinghouse SG Mechanical Tube Plugs Fabricated from Thermally Treated Alloy 600 Material + (ML17353A298)
- PNO-II-95-046D, on 950801,both Units to Plant Had Been Placed in Mode 3 in Anticipation of Hurricane Erin.All Hurricane Warnings Have Been Discontinued.Region II Continues to Monitor Conditions at Plant + (ML17353A300)
- PNO-II-95-046E, on 950802,Region II Exited Monitoring Mode for Hurricane Erin Which Was Downgraded to Tropical Storm. Region Continued to Track Progress of Storm & Resident Inspectors Onsite Monitored Licensee Activities + (ML17353A301)
- PNO-II-95-046A, on 950731,plants Made Preparations for Anticipation of Hurricane Erin W/Shutting Down of St Lucie Unit 2.Region II Personnel Sent to Turkey Point Site to Augment Staff & All Four Emergency Diesels Tested + (ML17353A302)
- PNO-II-95-046C, on 950801,both Units to Plant Had Been Shutdown in Anticipation of Hurricane Erin.Open Communication Line Will Be Established Upon Arrival of Hurricane Winds + (ML17353A303)
- PNO-II-95-046, on 950731,util Declared Notification of Unusual Event Upon Declaration of Hurricane Warning for Southeastern Florida.Reviewed Procedures & Plant Status to Prepare for Hurricane.Dispatched Er Vehicle & Staff to Site + (ML17353A304)
- PNO-II-95-046B, on 950801,both Units to Plant Will Be Shutdown in Anticipation of Hurriance Erin.Region II Personnel Closely Tracking Hurricane Progress Throughout Incident Response Ctr + (ML17353A305)
- ML17353A306 + (ML17353A306)
- IR 05000250/1995011 + (ML17353A309)
- ML17353A312 + (ML17353A312)
- L-95-224, Responds to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity + (ML17353A314)
- L-95-206, Submits Request for Schedular Exemption from Requirements of 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors + (ML17353A315)