Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000250/1991028 + (ML17348B083)
- ML17348B084 + (ML17348B084)
- ML17348B086 + (ML17348B086)
- IR 05000250/1991022 + (ML17348B088)
- ML17348B089 + (ML17348B089)
- ML17348B090 + (ML17348B090)
- IR 05000250/1991024 + (ML17348B092)
- L-91-214, Rept on Changes,Tests & Experiments Made W/O Prior Commission Approval for Period 900701-910630 + (ML17348B093)
- ML17348B094 + (ML17348B094)
- IR 05000250/1991027 + (ML17348B096)
- PLA-7644, Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644) + (ML17348B097)
- ML17348B099 + (ML17348B099)
- L-91-244, Forwards Util Objectives for 1991 Facility Annual Emergency Preparedness Exercise + (ML17348B100)
- L-91-239, Forwards Emergency Plan Implementing Procedure 20101, Duties of Emergency Coordinator & Rev 22 to Turkey Point Radiological Emergency Plan + (ML17348B101)
- ML17348B105 + (ML17348B105)
- ML17348B106 + (ML17348B106)
- ML17348B108 + (ML17348B108)
- 05000251/LER-1991-005-01, :on 910809,containment & Control Room Ventilation Sys Isolated W/Both Units Defueled.Caused by Personnel Error.Const Personnel Working in Control Room Immediately Removed from Jobs for Training + (ML17348B109)
- L-91-251, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/91-26 & 50-251/91-26.Corrective Actions:Increased Supervisory Attention to Radioactive Matl Controls Using Supervisor Tour Concept + (ML17348B110)
- L-91-245, Monthly Operating Repts for Aug 1991 for Turkey Point Units 3 & 4 + (ML17348B111)
- ML17348B112 + (ML17348B112)
- L-91-252, Forwards Unsatisfactory Performance Testing Incident Repts, Per 10CFR26.Test Specimens Submitted to Roche Biomedical Labs for Evaluation + (ML17348B113)
- 05000250/LER-1991-004-03, :on 910822,inadvertent Start of 3A Diesel Generator Occurred.Caused by Inadequate Communication Between Startup Personnel & Licensed Operators.Procedures Revised & Personnel Trained + (ML17348B114)
- ML17348B115 + (ML17348B115)
- ML17348B116 + (ML17348B116)
- ML17348B117 + (ML17348B117)
- L-91-259, Forwards Aug 1991 6-month Integrated Schedule Regulatory Rept Reflecting Info Updated Since Feb 1991 Rept + (ML17348B118)
- ML17348B120 + (ML17348B120)
- ML17348B121 + (ML17348B121)
- ML17348B123 + (ML17348B123)
- ML17348B124 + (ML17348B124)
- ML17348B126 + (ML17348B126)
- ML17348B127 + (ML17348B127)
- ML17348B128 + (ML17348B128)
- ML17348B130 + (ML17348B130)
- IR 05000250/1991030 + (ML17348B132)
- ML17348B133 + (ML17348B133)
- IR 05000250/1991031 + (ML17348B135)
- IR 05000250/1991026 + (ML17348B136)
- 05000250/LER-1990-020, :on 901013,surveillance Interval of Tech Spec 4.8.2.1 Exceeded Due to Personnel Error.Personnel Involved Counseled & Procedure 4-OSP-201.3 Revised + (ML17348B137)
- 05000250/LER-1991-005-02, :on 910830,3A Component Cooling Water (CCW) Pump Started Automatically on Low Pressure Due to Personnel Error.Training Brief Will Be Written & Distributed to Appropriate Personnel to Discuss Subj LER + (ML17348B138)
- L-91-246, Responds to NRC Concerns Noted in Insp Repts 50-250/91-35 & 50-251/91-35 on 910826-30.Corrective Actions:Environ Documentation Packages Will Be Updated to Reflect Installed Configuration of All Known Periodic Update Items by 911231 + (ML17348B139)
- NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B + (ML17348B140)
- ML17348B142 + (ML17348B142)
- ML17348B145 + (ML17348B145)
- ML17348B148 + (ML17348B148)
- 05000251/LER-1991-002-03, :on 910107 & 0729,permanent Magnet Generator Failed During Performance of Emergency Diesel Generator 4A Tests.Caused by Misalignment of Drive Shaft & Ground in Voltage Regulator.New Drive Shaft Installed + (ML17348B149)
- 05000250/LER-1991-006, :on 910921,RWST Had Less than 320,000 Gallons of Borated Water Required by TS 3/4.5.4 & Safety Injection Pumps Not Aligned to Operable Flow Path.Caused by Procedural Inadequacy.Pumps Realigned + (ML17348B150)
- ML17348B153 + (ML17348B153)
- ML17348B154 + (ML17348B154)
- L-91-266, Forwards Proposed Operator Licensing,Requalification & Generic Fundamental Exam Schedules,Reflecting Anticipated Number of Candidates to Be Examined,Per Generic Ltr 91-12, Operator Licensing Natl Exam Schedule + (ML17348B157)