Forwards Safety Evaluation Re Inservice Testing Program & Requests for Relief.Program Changes Involving Additions or Deletions or Components from Inservice Testing Program Should Be Provided to NRC
ML17348B121
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/20/1991
From: Berkow H
Office of Nuclear Reactor Regulation
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17348B122 List:
References
TAC-74798, TAC-74799, NUDOCS 9110030122
Download: ML17348B121 (5)


Text

7!

~p,R RE'gy

~C ~

Wp0

. pW~

++**+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 September 20, 1991 Docket Nos.

50-250 and 50-251 Mr. J.

H. Goldberg President

- Nuclear Division Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420

Dear Mr. Goldberg:

SUBJECT:

SAFETY EVALUATION OF THE INSERVICE TESTING (IST)

PROGRAM FOR PUMPS AND VALVES - TURKEY POINT PLANT, UNITS 3 AND 4 (TAC NOS.

74798 AND 74799)

Your letter of October 3, 1989, submitted the revised Pump and Valve Inservice Testing (IST) Program for the Turkey Point Plant, Units 3 and 4.

The IST Program addressed in the submittal covers the second 10-year interval, from February 1984 to February 1994 for Unit 3, and April 1984 to April 1994 for Unit 4.

The submittal also requested relief for the Turkey Point Plant from certain requirements in Section XI of the ASME Boiler and Pressure Vessel Code.

Ne have completed our review of your IST Program requests for relief with the technical assistance of our contractor, EGSG Idaho.

The enclosed Safety Evaluation (SE) and Technical Evaluation Report (TER) provide the details of our review, and Table 1 to the SE provides a

summary tabulation of our conclusions concerning each relief request.

The staff has determined that one relief request was not.required since the conditions are addressed in the plant Technical Specifications.

One relief request was partially denied, two relief requests were granted with certain conditions, and nine relief requests were granted on an interim basis.

Me have determined that the IST Program relief requests are acceptable for implementation provided the items identified in Appendix A of the TER are addressed within the time frame specified in the SE.

This SE includes the interim relief requests granted by the NRC on August 20, 1990.

p g

/p essed within the time ImC BE CEg~ lt;OPy lie have determined, pursuant to 10 CFR 50.55a(a)(3)(i),

10 CFR 50.55a(a)

(3)(ii), or 10 CFR 50.55a(g)(6)(i), for the items for which relief is requested, that (1) the proposed alternatives would provide an acceptable level of quality and safety, (2) compliance with the specified requirements would result in hardship without a compensatinq increase in the level of quality and safety, or (3) code requirements are impractical and that the granting of the relief is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.

Accordingly, relief from certain requirements of Section XI of the ASME Code is hereby granted, as described in the enclosed Safety Evaluation, provided the ro ram rocedural changes identified in Appendix A of the TEP, are addr frame specified in the SE.

P g OQ I 3 I

~ii0030>m 9iomo PDR ADOCN 05000250 P

PDR

~

1 L~.

Cftk lt f'g

~

a

-.y C

Mr. J.

H. Goldberg September 20, 1991 IST program changes, such as additional relief requests or changes to relief

requests, should be submitted for staff review but should not be implemented prior to review and approval by the NRC.

New or revised relief requests meeting the positions in Generic Letter 89-04, Enclosure 1, should be submitted to the NRC staff but can be implemented provided the guidance in Generic Letter 89-04, Section D, is followed.

Program changes that involve additions or deletions or components from the IST program should be provided to the NRC.

Should you have any questions concerning the above, please do not hesitate to contact us.

Sincerely, (Original Signed By Rajender Auluck for)

Enclosure:

As stated Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc w/enclosure:

See next page Distribution NRC 8 Local PDRs PDII-2 RF T. Murley/F. Miraglia J. Partlow C. Rossi S.

Varga G. Lainas D. Miller R. Auluck H. Berkow OGC E. Jordan, MNBB 3701 G. Hill (8)

ACRS (10)

GPA OC/LFMB J. Wechselberger, 17-G-21 M. Sinkule, RII J. Norberg NAME D

e FC:LA:

D I-

~ P

~

I-2 1

c

kdj

~

~

E

J or erg
D:PDII-
HB r

~

y C

DATE

/

/91

4 /[o/91

/()/91

f/~/91 Document Name:

TP 354 MEMO TO GOLDBERG

rt A

~

I a

II l

'. ll N

I

~

4

~

I n

~

(I

Mr. J.

H. Goldberg Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center
Miami, F 1ori da 33131-2398 Mr. Thomas F. Plunkett, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station-U.S. Nuclear Regulatory Commission Post Office Box 1448 Homestead, Florida 33090 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning

& Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Mr. R. E. Grazio Director, Nuclear Licensing Florida Power and Light Company P.O.

Box 14000 Juno Beach, Florida 33408-0420