Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-85-364, Forwards Addl Response to Generic Ltr 83-28,Item 1.2 Re post-trip Review,Data & Info Capability,Per 850815 Telcon & NRC 850719 Draft Technical Evaluation Rept.Reliability of Digital Data Processing Sys Also Discussed + (ML17342A212)
- ML17342A218 + (ML17342A218)
- L-85-381, Advises That Response to Generic Ltr 85-12 Re Implementation of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps & Safety Evaluation Will Be Provided by 851220 + (ML17342A227)
- L-85-393, Advises of Need to Evaluate NRC SER Impact Re Westinghouse Owners Group ATWS Mitigating Sys Actuation Circuitry Generic Design Program to Determine Best Logic.Implementation Schedule Will Be Submitted 90 Days After SER Issuance + (ML17342A228)
- L-85-346, Withdraws Part of 840402 Application for Amends to Licenses DPR-31 & DPR-41,dealing W/Operability/Surveillance Requirements Referencing Inservice Test Programs.Revised Pages Encl + (ML17342A232)
- L-85-389, Forwards 1985 Inservice Insp Summary Rept for Turkey Point Nuclear Power Plant Unit 3, Per ASME Code.Owner Data Rept of Repairs or Replacement & Data Rept for Eddy Current Exam Results Included + (ML17342A234)
- ML17342A235 + (ML17342A235)
- ML17342A236 + (ML17342A236)
- ML17342A237 + (ML17342A237)
- IR 05000250/1985029 + (ML17342A239)
- L-85-398, Forwards Addl Info Re Category C-2 Steam Generator Tube Insps,Completing Response to Generic Ltr 85-02.Addl Tubes Will Be Inspected on case-by-case Basis + (ML17342A243)
- L-85-382, Responds to Violations Noted in Insp Repts 50-250/85-26 & 50-251/85-26.Corrective Actions:Revs to Administrative Procedure 0190.19 Will Be Discussed W/Foremen & Supervisors to Ensure Awareness of Work Order Guidelines + (ML17342A252)
- ML17342A254 + (ML17342A254)
- ML17342A256 + (ML17342A256)
- ML17342A257 + (ML17342A257)
- IR 05000250/1985028 + (ML17342A259)
- ML17342A262 + (ML17342A262)
- ML17342A263 + (ML17342A263)
- L-85-350, Forwards Revised Pages to Inservice Test Program for Pumps & Valves,In Response to NRC 850520 Request for Rev.Revs Reflect Test Requirements for MOV-750 & MOV-751 + (ML17342A264)
- ML17342A265 + (ML17342A265)
- L-85-418, Reaffirms Commitment to Submit Appropriate Tech Specs Re Availability & Performance Monitoring of Standby Steam Generator Feedwater Pumps & Provides General Info Concerning Status of Sys.Two Pumps Installed + (ML17342A266)
- L-85-390, Forwards IAEA, Design Info Questionnaire, in Response to NRC Re Safeguards Program.Questionnaire Withheld + (ML17342A267)
- ML17342A271 + (ML17342A271)
- IR 05000250/1985031 + (ML17342A273)
- ML17342A274 + (ML17342A274)
- L-85-425, Forwards Application Fee for NRC Review of Re Implementation of Alternate Safe Shutdown Capability + (ML17342A275)
- L-85-409, Withdraws 850201 Request for NRC Review of Reanalysis of Spent Fuel Rack Modules W/Only Overhanging Rows Loaded W/ Fuel,Based on DG Mcdonald + (ML17342A276)
- ML17342A278 + (ML17342A278)
- IR 05000820/2010015 + (ML17342A280)
- ML17342A281 + (ML17342A281)
- ML17342A283 + (ML17342A283)
- ML17342A285 + (ML17342A285)
- L-85-407, Application for Amends to Licenses DPR-31 & DPR-41,revising Tech Specs Re Testing Requirements for safety-related Snubbers to Define Snubber Type & Deleting Test Acceptance Criteria Re 50% Drag Force Increase.Fee Paid + (ML17342A286)
- ML17342A287 + (ML17342A287)
- ML17342A288 + (ML17342A288)
- ML17342A290 + (ML17342A290)
- IR 05000250/1985033 + (ML17342A292)
- ML17342A293 + (ML17342A293)
- L-85-441, Requests Future Correspondence Re Fee Invoicing for Insp & Enforcement & Routine & Reactive Review Costs Be Sent to J Williams at Listed Address + (ML17342A297)
- ML17342A299 + (ML17342A299)
- ML17342A301 + (ML17342A301)
- ML17342A303 + (ML17342A303)
- L-85-444, Suppls 850821 Response to Violations Noted in Insp Repts 50-250/85-09 & 50-251/85-09 to Update Description of Existing Fasteners Thread Engagement Insp Plan + (ML17342A304)
- ML17342A306 + (ML17342A306)
- ML17342A308 + (ML17342A308)
- ML17342A309 + (ML17342A309)
- ML17342A311 + (ML17342A311)
- ML17342A312 + (ML17342A312)
- L-85-451, Forwards Relief Requests 13 & 14 from ASME Code Requirements for Inservice Insp for Review.Unit 4 Refueling Outage Scheduled for Jan 1986 + (ML17342A313)
- ML17342A314 + (ML17342A314)
- L-85-452, Forwards Revised Response to Insp Repts 50-250/85-05 & 50-251/85-05.Evaluation Underway to Determine fail-safe Testing Requirements & Acceptance Criteria for MSIVs Per ASME Boiler & Pressure Vessel Code + (ML17342A315)