ML17342A303

From kanterella
Jump to navigation Jump to search
Comments on Draft Gao Rept, Improved Regulatory Oversight Needed for QA at Operating Nuclear Power Plants. Description of Activities Re SALP Process Encl for Inclusion in Rept
ML17342A303
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/19/1985
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Peach J
GENERAL ACCOUNTING OFFICE
References
NUDOCS 8512050255
Download: ML17342A303 (10)


Text

I Mr. J. Dexter Peach, Dire r

Resources, Community, and Economic Development Division U.S. General Accounting Office 441 G. Street, N.W.

Washington, D.C.

20548

Dear Mr. Peach:

November 19, 1985 We appreciate the opportunity to comment on the draft GAO report, "Improved Regulatory Oversight Needed for Quality~A'ssurance at Operating Nuclear Power Plants."

The report makes several points which are useful to the Nuclear Regulatory Commission and highlights several areas.in which we agree that further work by NRC may be desirable.

As.*we move beyond a philosophy based on compliance with minimum regulations, we have begun to carry out inspections in the areas of management, maintenance and training.

A report of such a recent inspection at Turkey Point is attached as Enclosure 1.

We hope that this redirection of emphasis will lead to a further improvement in safety at nuclear plants.

With regard to the use of operational data in the SALP process, a number of activities have been underway for sometime but are not currently reflected in the draft report.

Enclosure 2 is a description of several of these activities.

The inclusion of these activities in the draft GAO report would serve to update and provide perspective to the report.

We have no other specific comments on the content of this draft GAO report.

Sincerely,

Enclosure:

As Stated Distribution DCS EDO R/F OPRB R/F DI R/F NRC PDR

RWCooper, IE SDRichardson,
PFMcKee, IE RLSpessard,IE JGPartlow, IE RHVollmer, IE JMTaylor, IE
BKGrimes, IE
WJDircks, EDO
TRehm, EDO IE
  • See Previous Concurrence 0.~ZQ+d y', ~

ROQ illiam J. Dircks Executive Director for Operations

JRoe, EDO OIA
VStello, DEDROGR
HRDenton, NRR RScroggins, RM JHeltemes, AEOD GCunningham, ELD TMur ley, RI
JGrace, RII JKeppler, RIII RMartin, RIV
JMartin, RV MBridgers (EDO 1141)

SECY IE/D*

D/QAVT/0*

JTaylor BKGrimes 11/13/85 11/12/85

- REVISED PER IE/AEOD 11/14/85 eL FC: IE/DI RPB* 'IE/DI/ RPB*

NAME :RWCooper;jj

SRichardson

. DATE :11/12/85

11/12/85
IE/DI ORPB*: IE DI DD*
PMcKee
RSpessard
11/12/85
11 12/85
IE/DI D+
JPar tlow

.:11/12/85

IE/DD*
EDO
RVollmer
WJDircks
11/12 85
11 85

I Uf iJ 4

V II f I

H Wv f II W

A

  • UWl W

I

"\\

~(

"'W t

WVW, W

W' r

'I I

WI

Mr. J. Dexter Peach, Director Resources, Community, and Economic Development Division U.S. General Accounting Office 441 G. Street, N.W.

Washington, D.C.

20548

Dear Mr. Peach:

We appreciate the opportunity to comment on the draft GAO report, "Impro d

Regulatory Oversight Needed for Quality Assurance at Operating Nuclear ower Plants."

The'eport makes several points which are useful to the Nuc ear Regulatory Commission and highlights several areas in which we agre that further work by NRC may be desirable.

With regard to the use of operational data in the SALP process a number of activities have been underway for sometime but are not curre ly reflected

.in.the draft report.

Enclosed is a description of several f these activities.

The inclusion of thes activities in the draft GAO report ould serve to update and provide per ective to the report.

We have n

other specific comments on the content f this draft GAO report.

Sincerely,

Enclosure:

As Stated William J.

rcks xecutive irector for Operations Distribution DCS EDO R/F OPRB R/F DI R/F NRC PDR

RWCooper, IE SDRichardson,
PFMcKee, IE

-RLSpessard,IE JGPartlow, IE

.RHVollmer, IE JMTaylor, IE

BKGrimes, IE

.WJDircks, EDO

TRehm, EDO
  • See Previous IE
JRo, E

VS ello, DEDROGR H

enton, NRR Scroggin RM JHeltemes, AEOD GCunningham ELD TMurley, RI
JGrace, RII
JKeppler, RI I RMartin, RIV
JMartin, RV MBridgers (EDO 1141)

IE/D*

D/QAV D*

JTaylor BKGrim s 11/13/85 11/12/

5 Concurrence

- REVISED PER IE/AEOD ll/14/85 0

F: IE DI RPB NAME :RWCooper;jj DATE :11/12/85

IE DI RPB: IE DI RPB: IE D DD:IE DI D:IE DD
SRichardson
PMcKee
RSpessard
JPartlow
RVollmer
11/12/85
11/12/85
11/12/85
11/12 85
11/12 85 OFFICIAL RECORD COPY

~

D

WJDircks
11/

/85

'h PW r

hlw ~ht 11 h"

ht hl I

1 II il W

I l4 lh W'1'I II Wt

'r,l

~

(

~

'h'w

Mr. J. Dexter Peach Director, Resources, Community, and Economic Development Division U.S. General Accounting Office 441 G Street, N.W.

Washington, D.C.

20548

Dear Mr. Peach:

We appreciate the opportunity to comment on the draft GAO report, "Improved Regulatory Oversight Needed for Quality Assurance At Operati,ng Nuclear Power Plants."

The report makes several points which are usefulyto the Nuclear Regulatory Commission and highlights several areas in which we agree that further work by NRC may be desirable.

We have no specific comments on the content of t 'raft GAO report.

Sincerely, Wi iliam J. Dircks E ecutive Director for Operations Distribution:

QDCS+

ORPB reading DI reading NRC PDR R.

W. Cooper, IE S.

D. Richardson, IE P.

F. McKee, IE R. L. Spessard, IE J.

G. Partlow, IE R.

H. Vollmer, IE J.

M. Taylor, IE B.

K. Grimes, IE W. J. Dircks, EDO T.

Rehm, EDO J.
Roe, EDO V. Stello H.

R. Denton R. Scroggins C. Heltemes G. Cunningham T. Murley, Region I

  • For previous concurrence see attached ORC J.

N. Grec Region II J.

G. (Eppl r, Region III R.

D. Martin, egion IV J.

B

Martin, qgion V

M.

ridgers (EDO 001141)85-508 IE:DI:ORPB

  • RWCooper:jj 11/12/

5 IE:

RHVo er 11/

/85 IE: DI:ORPB

  • SDRichard on 11/12/8 IE:D JMTa lor 11/

85 IE:DI:ORPB

  • PFMcKee 11/12/85 D/QAVT:D
  • BKGrimes 11/12/85 IE;DI:DD
  • RLSpessard 11/12/85 EDO WJDircks 11/

/85 IE:DI:D

  • JGPartlow 11/12/85

W l

~

~

I WW WW

~ ""

~

t Iht

~ t

~

h h

Mr. J. Dexter Peach Director, Resources, Community, and Economic Development Division U.S. General Accounting Office 441 G Street, N.W.

Washington, D.C.

20548

Dear Mr. Peach:

We appreciate the opportunity to comment on the draft G

report, "Improved Regulatory Oversight Needed for equality Assurance At crating Nuclear Power Plants."

The report makes several points which are seful to the Nuclear Regulatory Commission and highlights several areas n which we agree that further work by NRC may be desirable.

We have n

comments on the accuracy of the report.

Sincer ly, William J. Dircks Executive Director for Operations Distribution:

DCS ORPB reading DI reading NRC PDR R.

W. Cooper, IE S.

D. Richardson, IE P.

F. McKee, IE R. L. Spessard, IE J.

G. Partlow, IE R.

H. Vollmer, I J.

M. Taylor, I B. K. Grimes, E

W. J. Dircks EDO T.

Rehm, ED V. Stello H. R.

Den on R. Sero ins C.

Hel mes G.

Cu ingham T.

M rley, Region I pg, POO

  • For previous concurrence see attached ORC J.
Grace, Region II J..
Keppler, Region III D. Martin, Region IY B. Martin, Region Y

M. Bridgers (EDO-001141)

IE: DI:ORPB

  • RWCooper:jj 11/12/85 E.DD

'>R lmer 1

5 IE: 0I:ORPB IE: DI:ORPB

  • SDRichardson
  • PFMcKee 11/12/85 11/12/85 IE:D AVT:D JMTaylor

~~ BKGrimes 11/

/85 ~ 11/(Q/85 IE:D:

RLSp ard 11/(g/85 EDO WJDircks 11/

/85 IE:

JG rt ow 11/ g/85

P P

~

P I

Well l

ltf "

t

(,

f

~ yy

  • FIN<

II

. "j.l F

II M

II f

I 4

I I

f If 4l P

~

~

P P

b Il

'tf P, FV I

MI MP

'4 I

I*

1/

I'flll f ~

I I,P,

~

M 4

I 4

~

b F'

Mr. J. Dexter Peach,-B-i~&or Di<e&ov; R o

maonit, and Fcong~mic eveiopment

>vision U.S. General Accounting Office 441 G Street, N.W.

Washington, D.C.

20548

Dear Mr. Peach:

We appreciate the opportunity to comment on the draft 0 report,">Improved Regulatory Oversight Needed for guality Assurance A

perating Nuclear Power Plants."

The report makes several points which ar useful to the Nuclear Regulatory Commission and highlights several ar s in which we agree that further work by NRC may be desirable.

We hav no comments on the accuracy of the report.

Si cerely, William J. Dircks Executive Director for Operations Distribution:

DCS ORPB reading DI reading R.

W. Cooper, IE S.

D. Richardson, E

P.

F. McKee, IE R. L. Spessar IE J.

G. Partlo

, IE R.

H. Volley r, IE J.

M. Tay 6r, IE B. K. Gr es, IE W. J.

rcks, EDO POP ehve

. S&tlo

'Qp~0&

p. 5croQQ<~~

H~(+e.me&

yy~ i~g, <~

lV G <~~~)

P e.@pl~~)

Q ~&si+

)

~VS IE DI:ORPB

~

~

~

~

Cooper: jj 11/IP /85 IE:DD:

RHVollmer 11/

/85

~

~

~

I:ORPB Richardson ll/q+/85 IE:0 JMTaylor 11/

/85 I:

Nip&

c ee 1/ I%85 D/gAVT:D BKGrimes 11/

/85 IE:DI:DD RLSpessard 11/

/85 EDO WJDircks 11/

/85 IE:DI:D JGPartlow 11/

/85

q II

~

Il I

'lf ff I

I I