Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17291A448 + (ML17291A448)
- ML17291A449 + (ML17291A449)
- GO2-94-241, Forwards Completed NRC Form 536,providing Info on Estimate Number of Operator Candidates to Be Tested in FY95-98,in Response to Administrative Ltr 94-12 + (ML17291A450)
- ML17291A453 + (ML17291A453)
- ML17291A455 + (ML17291A455)
- ML17291A456 + (ML17291A456)
- GO2-94-244, Primary Reactor Containment 1994 Integrated Leakage Rate Test Final Rept + (ML17291A457)
- ML17291A458 + (ML17291A458)
- ML17291A459 + (ML17291A459)
- PNO-IV-94-050, on 940923,four Employees Attending Training Class Hid Behind Simulator Control Panels to Pull Prank on Incoming Class of Managers.Individual Saw Employees But Could Not Identify Them.Security Force Notified + (ML17291A461)
- GO2-94-243, Requests NRC Approval of Rev to Operational QA Program Description for Supply Sys WNP-2 + (ML17291A462)
- GO2-94-245, Advises That DA Swank Appointed Licensing Manager,Effective Immediately + (ML17291A463)
- GO2-94-238, Submits Inservice Insp Summary Rept for Refueling Outage RF94A,Spring 1994 + (ML17291A464)
- ML17291A465 + (ML17291A465)
- ML17291A466 + (ML17291A466)
- ML17291A468 + (ML17291A468)
- ML17291A469 + (ML17291A469)
- ML17291A470 + (ML17291A470)
- ML17291A472 + (ML17291A472)
- GO2-94-246, Provides Clarification of Commitments Re Implementation of Improvements to Computerized Work Management Sys + (ML17291A473)
- GO2-94-248, Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys + (ML17291A474)
- FOIA/PA-2017-0689 + (ML17291A475)
- ML17291A477 + (ML17291A477)
- ML17291A478 + (ML17291A478)
- GO2-94-247, Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements + (ML17291A479)
- ML17291A480 + (ML17291A480)
- ML17291A481 + (ML17291A481)
- FOIA/PA-2018-0021 + (ML17291A483)
- GO2-94-251, Monthly Operating Rept for Oct 1994 for WPPSS 2 + (ML17291A489)
- ML17291A492 + (ML17291A492)
- ML17291A494 + (ML17291A494)
- ML17291A495 + (ML17291A495)
- ML17291A505 + (ML17291A505)
- RS-17-140, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors + (ML17291A508)
- GO2-94-257, Forwards Info Involving Change to Met Tower Stability Class Data Point of Data Point Library for ERDS + (ML17291A509)
- ML17291A511 + (ML17291A511)
- 05000397/LER-1994-017, :on 941020,TS Limit Exceeded Due to Improper Calibr of Suppression Pool Narrow Range Level Transmitters. Suppression Pool Level Was Returned to Appropriate TS Operating Level at 1558 Hr + (ML17291A512)
- GO2-94-258, Responds to Re Violation Noted in Insp Rept 50-397/94-27.Corrective Actions:Operability Assessment of CAC B Unit Performed for as-found Condition Upon Identification of Problem & QC Inspector No Longer Employed + (ML17291A513)
- IR 05000397/1994030 + (ML17291A514)
- GO2-94-254, Forwards Response to NRC follow-up RAI Re GL 92-08, Thermo- Lag 330-1 Fire Barriers, as Detailed in NRC + (ML17291A515)
- GO2-94-261, Submits Schedule for Implementing Improved Tech Spec Program + (ML17291A516)
- GO2-94-268, Files Annual Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each Licensed Reactor + (ML17291A518)
- ML17291A519 + (ML17291A519)
- ML17291A521 + (ML17291A521)
- ML17291A523 + (ML17291A523)
- GO2-94-266, Informs NRC of Intent to Extend First 10-yr ISI & Test Interval for No Longer than Six Months + (ML17291A530)
- GO2-94-267, Forwards Response to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow, Effect on Cycle 11 Operation + (ML17291A531)
- ML17291A533 + (ML17291A533)
- IR 05000397/1994027 + (ML17291A534)
- ML17291A535 + (ML17291A535)
- ML17291A537 + (ML17291A537)