GO2-94-251, Monthly Operating Rept for Oct 1994 for WPPSS 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1994 for WPPSS 2
ML17291A489
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1994
From: Embree D, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-94-251, NUDOCS 9411150391
Download: ML17291A489 (8)


Text

PA.I@DR.I EY ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9411150391 DOC.DATE: 94/10/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1994 for WPPSS 2.W/941104 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL ! SIZE:

TITLE: Monthly Operating Report (per Tech Specks NOTES:

RECIPIENT COPIES

'ECIPIENT ID CODE/NAME LTTR ENCL ID CODE/NAME PD4-2 PD 1

1 CLIFFORD,J COPIES LTTR ENCL 1

1 INTERN

.~KORE 10 10 FI'L'E CENTER 0

1 1

R~RPMAS/-IRCB-E,

),(.1@...1 EXTERNAL. LITCO BRYCE,J H

),Igg

( A~

< I>i'1"IL',f:E~'J'I>>

,f.on P~."bli,f

<<'t'Oli'I Pl8') l,i<.

,f IlT,AV3!'IJ>>

AEOD/SPD/RRAB NRR/DORS/OEAB RGN4 kbbl NOAC 1

1 1

1 1

1 1

1

~ Ilia l."f. PL fL I

ii "> ~

C.jt:2T,>:8 }'~,'. ";., I l.

J 4l..:f>Ill L I, I >(.'.>>,

I

(.'<lk'II;"S Q'Z4'R EI~>>

')0

$ 0 3.

3,

.I 4

NOTE TO ALL"RlDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVKSTE!COYTACTTHE DOC!:MEYTCONTROL DESK, ROOhf P !-37 (EXT. 504.0083 ) TO ELI if lb'ATE YOUR i'AifL'l<OXI DISTRIBUTIONLISTS I'OR DOC!.'h,fEX I'S YOI.'ON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Bm968 ~ 3000 George Wasbtngton Way ~ Richland, 1Wasbtngton 99352-0968

~ (509) 372-5000 November 4, 1994 G02-94-251 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Dear Sirs;

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT OCTOBER 1994 Transmitted herewith is the Monthly Operating Report for the month of October, 1994 as required by our Technical Specifications 6.9.1.6.

Sincerely, G. O. Smith Operations Division Manager (MD 9270)

GOS:DGE CC:

NRC, MN BB-7602, Washington, DC NRC, Administrator, Region IV NRC, Resident Inspector (927N)

INPO ANILibrary UtilityData Institute BPA (399) 91 941031 05000397 PDR ADOCK R

A

~

C 4

4 OPERATING STATUS REPORT for WNP-2 Date:

November 1, 1994 2.

3.

4.

5.

6.

7.

8.

3323 1200.9 1120 1132 1086 N/A Docket:

50-397 Reporting Period:

OCTOBER 1994 Outage + On-Line Hours:

745.0 UtilityContact:

David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity (Gross MW,):

Maximum Dependable Capacity (Net MW, ):

Ifchanges occur above since last report, give re" sons:

10.

Power to which restricted, ifany (Net MW,):

11.

Reasons for restrictions, ifany:

None 12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy (MWH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Forced Outage Hours MONTH 745.0 745.0 0.0 745.0 0.0 2,467,013 854,270 821,938 100.0%

100.0%

101.6%

98.5%

0.0%

0.0 YEAR 7,296.0 5,126.4 0.0 5,036.6 0.0 15,656,417 5,356,210 5,115,945 69.0%

69.0%

64.6%

62.6%

1.7%

85,8 CUMULATIVE 86,624.2 61,236.6 340.4 59,103.6 381.7 174,417,723 58,668,420 56,201,330 68.2%

68.7%

59.4%

58.8%

11.9%

7,971.1 26.

Shutdowns scheduled over the next 6 months (type, date, duration):

Annual refueling (R-10), April 15, 1995, 42 days.

27.

Ifcurrently shutdown, estimated startup date:

N/A Note:

Cumulative Unit Capacity Factors (MDC &DER) are calculated with weighted averages.

C 1

ei AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 November 1, 1994 D. G. Embree (509) 377-8448 REPORT PERIOD:

OCTOBER 1994 DAY AVERAGE DAILYPOWER LEVEL (Net MWe)

AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 1095 1106 1108 1107 1105 1104 1106 1108 1106 1103 1109 1112 1110 1106 1112 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1108 1104 1108 1105 1095 1099 1028 1110 1093 1101 1098 1117 1114 1104 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line); In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

k

~a IL" 1

UiiIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

OCTOBER 1994 DOCKET NO.:

50-397 UNIT NAME:

WNP-2 DATE:

November 1, 1994 COMPLETED BY:

D.G. Embree TELEPHONE:

(509) 3774448 No.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None SD'IMARY:

The plant operated at full power during most all of the month, except for short downpower evolutions for periodic testing and minor maintenance.

TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other METHOD I - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG4161 Exhibits F &H