Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-83-764, Confirms 830812 Telcon W/R Auluck Re Change in Current Projected Fuel Load of Early Nov 1983.Meeting W/Nrc Mgt to Discuss Fuel Load & Other Issues Requested + (ML17277A769)
- GO2-83-756, Advises That Jet Pump Holddown Beams Retensioned,Per 801204 Commitment & Section 3.9.5 of SER (NUREG-0892).Daily Jet Pump Operability Surveillance Testing & Periodic Insps Provide Addl Assurance of Proper Operation + (ML17277A770)
- GO2-83-765, Advises That as of 830708,applicable Personnel Have Attended & Completed Mitigating Core Damage Training Classes or Equivalent,Per TMI Action Item II.B.4 & SER Confirmatory Item 21 Responses + (ML17277A772)
- GO2-83-732, Forwards Info Describing Actions Taken to Resolve Const Issues Identified in IE Insp Rept 50-397/83-29,per 830715 Submittal.Schedules for Completion & Status of Programs Addressing Broad Issues Also Encl + (ML17277A773)
- ML17277A776 + (ML17277A776)
- ML17277A777 + (ML17277A777)
- ML17277A778 + (ML17277A778)
- ML17277A779 + (ML17277A779)
- ML17277A780 + (ML17277A780)
- GO2-83-727, Forwards Draft Test Procedure & FSAR Section Re Verification of UHS Performance.One Test Objective Is to Suppl & Extend Wind Speed Range of Previous Drift Loss Testing.Test to Be Conducted When Plant & Environ Conditions Optimum + (ML17277A782)
- ML17277A784 + (ML17277A784)
- ML17277A785 + (ML17277A785)
- GO2-83-785, Provides Addl Response to Generic Ltr 83-24 Re TMI Action Plan Item I.G.1.Response Provides Justification for Elimination of Station Blackout Test & Restatement of WPPSS, Unit 2 Approach to Compliance w/I.G.1 + (ML17277A787)
- ML17277A789 + (ML17277A789)
- ML17277A795 + (ML17277A795)
- ML17277A796 + (ML17277A796)
- ML17277A797 + (ML17277A797)
- GO2-83-828, Restates Util Commitment to Install Diesel Starting Air Dryers at First Refueling Outage,Not by Fuel Load. Installation Unnecessary at Fuel Load to Complete Safe Reliable Station + (ML17277A798)
- GO2-83-842, Forwards Environ Qualification Rept for safety-related Equipment.Justification for Interim Operation Included in Rev to Rept + (ML17277A799)
- ML17277A800 + (ML17277A800)
- GO2-83-831, Forwards Response to SER (NUREG-0892),Confirmatory Issue 7, Question 110.42 Re Component Supports.Data Quantifies Difference Between Support Design Load W/ & W/O Inclusion of Thermal Loads + (ML17277A804)
- GO2-83-832, Advises of Util Decision to Add Auxiliary Steam Isolation Devices to Reduce Potential Reactor Bldg Accident Environ Conditions.Facility Can Be Operated Safely Until Mod Completed for Listed Reasons + (ML17277A805)
- GO2-83-833, Updates Response to Rev 1 to NUREG-0313 Re Intergranular Stress Corrosion Cracking in Bwrs.Summary of Selection Process Used to Determine Welds Receiving Induction Heating Stress Improvement Treatment Listed + (ML17277A806)
- GO2-83-840, Clarifies Use of Quality Verification Instruction QVI-09 by Facility Project Visual Exam Acceptance Criteria for Reverification Insp of Welded Structures.Revised Page 3.8-190 to Be Incorporated Into Amend to FSAR + (ML17277A807)
- ML17277A808 + (ML17277A808)
- ML17277A811 + (ML17277A811)
- ML17277A817 + (ML17277A817)
- GO2-83-844, Forwards Response to Specific Issues Raised in Sser 3 (NUREG-0892) Addressing Seismic Qualification of safety- Related Electrical & Mechanical Equipment + (ML17277A818)
- GO2-83-814, Forwards WPPSS Unit 2 Single-Loop Operation Analysis. Rept Will Be Incorporated in Amend 32 to FSAR + (ML17277A820)
- ML17277A821 + (ML17277A821)
- ML17277A822 + (ML17277A822)
- GO2-83-085, Forwards Quality Verification Program,Vol 1:Overview Rept, Jul-Sept 1983 + (ML17277A852)
- ML17277A853 + (ML17277A853)
- ML17277A854 + (ML17277A854)
- BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 + (ML17277A855)
- GO2-83-855, Forwards Response to FSAR Question 110.44 in NRC .W/One Oversize Drawing.Aperture Card Is Available in Pdr.Response W/O Encl + (ML17277A857)
- ML17277A858 + (ML17277A858)
- ML17277A859 + (ML17277A859)
- ML17277A861 + (ML17277A861)
- GO2-83-865, Forwards Response to 830907 Request for Addl Info Re Setpoint Methodology.Resolution of Issue Generically w/NRC- Recognized Util Group Presently Addressing Issue Requested + (ML17277A862)
- GO2-83-861, Discusses Agreement W/Nrc Affecting Surveillance Requirements in NUREG-0892,SER Suppl 2 Re TMI Action Item II.K.3.28 on Automatic Depressurization Sys.Bottle Pressure Verification Changed to 31 Days + (ML17277A864)
- GO2-83-863, Forwards Addl Info Re Containment Out-of Roundness Per NRC 830722 Meeting + (ML17277A865)
- ML17277A868 + (ML17277A868)
- ML17277A869 + (ML17277A869)
- ML17277A870 + (ML17277A870)
- GO2-83-872, Forwards Four Oversize Drawings,Closing Out NUREG-0892,SER Outstanding Issue 29 Re Vacuum Breaker Valves.Valve Response Meets Containment Design Bases for Response Time & Flow Capacity.Aperture Cards Are Available in PDR + (ML17277A871)
- ML17277A872 + (ML17277A872)
- ML17277A873 + (ML17277A873)
- ML17277A874 + (ML17277A874)
- ML17277A875 + (ML17277A875)
- ML17277A877 + (ML17277A877)