Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16312A064 + (ML16312A064)
- ML16312A065 + (ML16312A065)
- ML16312A066 + (ML16312A066)
- ML16312A067 + (ML16312A067)
- IR 05000387/2016003 + (ML16312A068)
- ML16312A084 + (ML16312A084)
- IR 05000338/2016003 + (ML16312A095)
- ML16312A140 + (ML16312A140)
- ML16312A142 + (ML16312A142)
- ML16312A143 + (ML16312A143)
- ML16312A155 + (ML16312A155)
- ML16312A156 + (ML16312A156)
- PNO-II-79-011, on 791016,while Returning Low Pressure Injection B Train to Svc,About 2000 Gallons of Reactor Coolant Spilled Through Partially Opened Vent Valve Into West Penetration Room.Facility Shut Down for Insp & Repair + (ML16312A158)
- ML16312A174 + (ML16312A174)
- RC-16-0147, VC Summer Nuclear Station, Unit 1, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Pursuant to Title 10 9f the Code of Federal Regulations 05.54(f) + (ML16312A177)
- ML16312A177 + (ML16312A177)
- ML16312A178 + (ML16312A178)
- ML16312A188 + (ML16312A188)
- IR 05000400/1980022 + (ML16312A189)
- ML16312A192 + (ML16312A192)
- ML16312A195 + (ML16312A195)
- ML16312A224 + (ML16312A224)
- ML16312A244 + (ML16312A244)
- ML16312A270 + (ML16312A270)
- ML16312A311 + (ML16312A311)
- IR 05000244/2016003 + (ML16312A323)
- HNP-16-106, Development of Evacuation Time Estimates + (ML16312A330)
- FOIA/PA-2017-0100 + (ML16312A336)
- ML16312A345 + (ML16312A345)
- ML16312A354 + (ML16312A354)
- L-16-298, Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 + (ML16312A359)
- ML16312A388 + (ML16312A388)
- 05000416/LER-2016-007, Regarding Technical Specification Shutdown Due to Loss of Residual Heat Removal Pump + (ML16312A394)
- ML16312A407 + (ML16312A407)
- ML16312A427 + (ML16312A427)
- ML16312A431 + (ML16312A431)
- ML16312A432 + (ML16312A432)
- ML16312A434 + (ML16312A434)
- ML16312A436 + (ML16312A436)
- ML16312A437 + (ML16312A437)
- IR 05000461/2016405 + (ML16312A466)
- ML16312A507 + (ML16312A507)
- L-PI-16-088, Core Operating Limits Report for Cycle 30, Revision 0 + (ML16312A523)
- JAFP-16-0168, Commitments for March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, Flooding and Seismic + (ML16312A540)
- ML16313A009 + (ML16313A009)
- ML16313A012 + (ML16313A012)
- ML16313A016 + (ML16313A016)
- ML16313A042 + (ML16313A042)
- ML16313A062 + (ML16313A062)
- ET 16-0026, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (ML16313A063)
- ML16313A064 + (ML16313A064)