Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000247/LER-2015-004, Regarding Safety System Functional Failure Due to an Inoperable Containment Caused by a Flawed Elbow on the 21 Fan Cooler Unit Service Water Motor Cooling Return Pipe + (ML16057A178)
- ML16057A179 + (ML16057A179)
- CP-201600117, Submittal of Fifteenth Refueling Outage (2RF15), Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda, Third Interval Start Date: August 3, 2014, Third Interval End Date: August 2, 2023) + (ML16057A180)
- NOC-AE-16003339, Evidence of Financial Protection + (ML16057A181)
- ML16057A181 + (ML16057A181)
- LIC-16-0017, Submittal of Emergency Planning Implementing Procedure and Index. Includes Emergency Plan Implementing Procedure Change EPIP-TSC-2, Rev 18 + (ML16057A195)
- ML16057A196 + (ML16057A196)
- ML16057A198 + (ML16057A198)
- RS-16-020, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML16057A208)
- RS-16-021, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML16057A209)
- RS-16-022, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML16057A210)
- RS-16-023, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML16057A217)
- RS-16-027, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) + (ML16057A218)
- L-PI-16-014, ISFSI - Annual Effluent Report, January Through December 2015 + (ML16057A238)
- BVY 16-006, ISFSI - Annual Radioactive Effluent Release Report for 2015 + (ML16057A240)
- ML16057A257 + (ML16057A257)
- ML16057A258 + (ML16057A258)
- ML16057A259 + (ML16057A259)
- ML16057A260 + (ML16057A260)
- ML16057A261 + (ML16057A261)
- ML16057A262 + (ML16057A262)
- ML16057A263 + (ML16057A263)
- ML16057A264 + (ML16057A264)
- ML16057A265 + (ML16057A265)
- ML16057A266 + (ML16057A266)
- ML16057A267 + (ML16057A267)
- ML16057A268 + (ML16057A268)
- ML16057A269 + (ML16057A269)
- ML16057A270 + (ML16057A270)
- ML16057A271 + (ML16057A271)
- ML16057A272 + (ML16057A272)
- ML16057A273 + (ML16057A273)
- ML16057A274 + (ML16057A274)
- ML16057A275 + (ML16057A275)
- ML16057A276 + (ML16057A276)
- ML16057A278 + (ML16057A278)
- ML16057A279 + (ML16057A279)
- ML16057A280 + (ML16057A280)
- ML16057A281 + (ML16057A281)
- ML16057A282 + (ML16057A282)
- ML16057A283 + (ML16057A283)
- ML16057A309 + (ML16057A309)
- ML16057A310 + (ML16057A310)
- CP-201600097, Westinghouse LTR-PAFM-16-2-NP, Technical Justification to Support Extended Volumetric Examination Interval for Comanche Peak Unit 1 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds + (ML16057A311)
- LR-N16-0025, In-Service Inspection Activities - 90-Day Report + (ML16057A316)
- LR-N16-0026, Annual Report of Specific Activity Analysis - TS 6.9.1.5c + (ML16057A317)
- ML16057A339 + (ML16057A339)
- ML16057A343 + (ML16057A343)
- LR-N16-0040, Salem and Hope Creek - Transmittal of 2015 Annual Report of Fitness for Duty Performance Data + (ML16057A343)
- ML16057A344 + (ML16057A344)
- LR-N16-0040, Salem and Hope Creek, 10 CFR Part 26, Subpart I - Managing Fatigue, for Period Ending 2015 + (ML16057A344)