Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14057A592 + (ML14057A592)
- ML14057A593 + (ML14057A593)
- ML14057A594 + (ML14057A594)
- ML14057A595 + (ML14057A595)
- ML14057A596 + (ML14057A596)
- ML14057A597 + (ML14057A597)
- ML14057A598 + (ML14057A598)
- ML14057A599 + (ML14057A599)
- ML14057A600 + (ML14057A600)
- ML14057A601 + (ML14057A601)
- ML14057A602 + (ML14057A602)
- ML14057A603 + (ML14057A603)
- ML14057A604 + (ML14057A604)
- ML14057A605 + (ML14057A605)
- ML14057A606 + (ML14057A606)
- ML14057A607 + (ML14057A607)
- ML14057A609 + (ML14057A609)
- ML14057A620 + (ML14057A620)
- ML14057A622 + (ML14057A622)
- ML14057A628 + (ML14057A628)
- CY-14-004, Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage + (ML14057A629)
- ML14057A631 + (ML14057A631)
- CY-14-005, Connecticut Yankee Atomic Power Company - Haddam Neck Plant Independent Spent Fuel Storage Installation Property Insurance Coverage + (ML14057A632)
- ML14057A633 + (ML14057A633)
- ML14057A634 + (ML14057A634)
- ML14057A639 + (ML14057A639)
- L-PI-14-017, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14057A647)
- ML14057A650 + (ML14057A650)
- GNRO-2014/00020, Request for Verbal Relief of ASME Boiler and Pressure Vessel Code Section XI, Examination B13.10, and Alternative Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines + (ML14057A685)
- ML14057A699 + (ML14057A699)
- ML14057A712 + (ML14057A712)
- ML14057A713 + (ML14057A713)
- ML14057A714 + (ML14057A714)
- ML14057A716 + (ML14057A716)
- ML14057A720 + (ML14057A720)
- ML14057A726 + (ML14057A726)
- ML14057A756 + (ML14057A756)
- PNP 2014-019, Relief Request Number RR 4-19 Proposed Alternative to the Requirements of ASME Code Case N-638-4 + (ML14057A766)
- ULNRC-06087, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML14057A770)
- L-PI-14-018, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) + (ML14057A771)
- ULNRC-06088, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML14057A773)
- NL-14-0180, Units 1 and 2 Second Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) + (ML14057A776)
- NL-14-0185, Units 1 and 2, Second Six-Month Status Report of the Implementation of Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) + (ML14057A777)
- NL-14-0184, Units 1 and 2, Six-Month Status Report of the Implementation of Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) + (ML14057A778)
- NL-14-0183, Units 1 and 2, Second Six-Month Status Report of the Implementation of Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) + (ML14057A779)
- NL-14-0250, Unit 2 Request for Relaxation of Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (ML14057A780)
- ML14057A794 + (ML14057A794)
- L-2014-022, Update to Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding - Review of Available Physical Margin (APM) Assessments + (ML14057A795)
- ML14057A796 + (ML14057A796)
- CP-201400140, Correction to Figures Provided in Response to Request for Additional Information for LAR 12-007 Regarding Two, 14-Day, One-Time, Completion Times for Offsite Circuits + (ML14057A804)
- ML14057A806 + (ML14057A806)