Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML072540033 + (ML072540033)
- ML072540034 + (ML072540034)
- ML072540090 + (ML072540090)
- ML072540110 + (ML072540110)
- Press Release-07-117, NRC Staff Approves Transfer of Comanche Peak Operating License + (ML072540116)
- RS-07-127, Additional Information Supporting Request for Safety Evaluation Revision Regarding Backup Stability Protection Methodology + (ML072540147)
- NL-07-102, Entergys Request to Delay the NRC 95001 Inspection at Indian Point Nuclear Generating Unit 3 + (ML072540159)
- IR 05000445/2007405 + (ML072540181)
- ML072540226 + (ML072540226)
- ML072540242 + (ML072540242)
- ML072540254 + (ML072540254)
- ML072540398 + (ML072540398)
- IR 05000341/2007003 + (ML072540412)
- NL-07-1608, Request Relief, RR-55, Temporary Non-Code Repair of Service Water Piping + (ML072540429)
- ML072540429 + (ML072540429)
- Press Release-IV-07-034, - Elmo Collins Named Administrator of NRCs Region IV Office + (ML072540432)
- ML072540439 + (ML072540439)
- L-88-017, Change in Method of Reactor Coolant System Level Detection + (ML072540441)
- ML072540455 + (ML072540455)
- Press Release-II-07-042, NRC Schedules Two Meetings to Discuss NFS Nuclear Fuel Plant Performance + (ML072540461)
- Press Release-II-07-043, - NRC Sends Augmented Inspection Team to Review Electrical Breakers Issue at Alabama Nuclear Plant + (ML072540468)
- IR 05000397/2007402 + (ML072540478)
- ML072540482 + (ML072540482)
- Press Release-I-07-045, - NRC, Firm to Discuss Proposed Change to Decommissioning Plan for Former Nuclear Materials Site in Windsor, Conn + (ML072540527)
- LIC-07-0082, License Amendment Request (LAR) Permanent Use of Sodium Tetraborate as the Containment Building Sump Buffering Agent + (ML072540536)
- ML072540537 + (ML072540537)
- ML072540550 + (ML072540550)
- ML072540561 + (ML072540561)
- ML072540573 + (ML072540573)
- IR 05000413/2007011 + (ML072540589)
- ML072540593 + (ML072540593)
- IR 05000219/2007403 + (ML072540594)
- ML072540597 + (ML072540597)
- JAFP-07-0107, Response to Request for Additional Information Regarding Proposed Relief Request PRR-01 for the Fourth Interval In-Service Testing Program + (ML072540621)
- 05000483/LER-2007-003, Regarding 1 OTDT Channel Inoperable for Greater than TS Allowable Time + (ML072540623)
- LR-N07-0221, Response to RAI 1 and RAI 2 on LCR S06-10, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System + (ML072540626)
- Press Release-II-07-044, - NRC Sends Special Inspection Team to McGuire Nuclear Plant to Assess Incorrect Installation of Equipment + (ML072540627)
- PLA-6267, Semi-Annual Part 26 Performance Data Report for January 1, 2007 to June 30, 2007 + (ML072540638)
- ML072540641 + (ML072540641)
- PLA-6261, Request for Additional Information (RAI) for the Review of the License Renewal Application (LRA) Section 2.5 PLA-6261 + (ML072540680)
- ML072540683 + (ML072540683)
- ML072540684 + (ML072540684)
- L-2007-137, Technical Specification Special Report, Inoperable Containment Sump Wide Range Level Channel B + (ML072540685)
- ML072540769 + (ML072540769)
- IR 05000285/2007007 + (ML072540771)
- ML072540784 + (ML072540784)
- ML072540789 + (ML072540789)
- ML072540790 + (ML072540790)
- Press Release-I-07-046, - NRC to Solicit Public Comments on Sept. 19 as Part of Indian Point License Renewal Application Review + (ML072540791)
- ML072540792 + (ML072540792)
- ML072540793 + (ML072540793)