Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- CNRO-2005-00048, Relaxation Request 5 to NRC First Revised Order EA-03-009 for the Control Element Drive Mechanism Nozzles + (ML052560109)
- RA-05-0093, Independent Spent Fuel Storage Installation, NUHOMS - 24PTH System - Thermal Performance Measurements + (ML052560117)
- ML052560118 + (ML052560118)
- ML052560131 + (ML052560131)
- ML052560138 + (ML052560138)
- ML052560140 + (ML052560140)
- IR 05000409/2005002 + (ML052560143)
- PNO-III-05-013, ; Braidwood Forced Outage Due to Reactor Coolant Pump Leak-Off in Excess of Vendor Recommendations + (ML052560170)
- ML052560211 + (ML052560211)
- LR-N05-0392, Request for Change to Technical Specifications Accident Monitoring Instrumentation + (ML052560221)
- PLA-5952, NRC Notification of NPDES Permit Authorization Permit PA-0047325, PLA-5952 + (ML052560227)
- 0CAN080501, Units 1 and 2, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (ML052560230)
- ML052560232 + (ML052560232)
- L-PI-05-083, Request for Relief No. 2-RR-4-6, for the Unit 2 4th 10-Year Interval Inservice Inspection Program + (ML052560242)
- BVY 05-085, Revised Core Operating Limits Report for Cycle 24 + (ML052560243)
- ML052560252 + (ML052560252)
- ML052560258 + (ML052560258)
- IR 05000266/2005015 + (ML052560264)
- ML052560267 + (ML052560267)
- ML052560269 + (ML052560269)
- ML052560273 + (ML052560273)
- L-PI-05-082, Request for Relief No. 21, for the Plant 3rd 10-Year Interval Inservice Inspection Program + (ML052560277)
- ML052560278 + (ML052560278)
- ML052560309 + (ML052560309)
- ML052560326 + (ML052560326)
- RS-05-120, Revision of License Amendment Request for Activation of the Trip Outputs of the Oscillation Power Range Monitor System + (ML052560332)
- ML052560343 + (ML052560343)
- L-PI-04-135, Inservice Inspection Summary Report, Interval 3, Period 3, Interval 4, Period 1 Refueling Outage Dates: April 16, 2005 - June 10, 2005, Fuel Cycle 22: October 11, 2003 - June 10, 2005 + (ML052560345)
- ML052560364 + (ML052560364)
- ML052560368 + (ML052560368)
- ML052560393 + (ML052560393)
- ML052560405 + (ML052560405)
- ML052560407 + (ML052560407)
- ML052560408 + (ML052560408)
- ML052560429 + (ML052560429)
- ML052560433 + (ML052560433)
- ML052560439 + (ML052560439)
- ML052560442 + (ML052560442)
- ML052560443 + (ML052560443)
- ML052560447 + (ML052560447)
- ML052560454 + (ML052560454)
- ML052560476 + (ML052560476)
- ML052560481 + (ML052560481)
- ML052560531 + (ML052560531)
- ML052560544 + (ML052560544)
- ML052560549 + (ML052560549)
- ML052560561 + (ML052560561)
- ML052560628 + (ML052560628)
- ML052560636 + (ML052560636)
- ML052560651 + (ML052560651)
- ML052570005 + (ML052570005)