Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- E910-05-045, Experimental Corporation (SNEC) FSS Report for - Ssgs Structural Surfaces - Cv Steam Tunnel + (ML052140110)
- ML052140113 + (ML052140113)
- ML052140116 + (ML052140116)
- ML052140117 + (ML052140117)
- ML052140118 + (ML052140118)
- E900-04-013, Rev 0 to Calculation E900-04-013, Cv Yard Survey Design - North East Side of Cv, Appendices a - D to Final Status Survey Report for Saxton Nuclear Experimental Corp Containment Vessel Yard Excavation - Soil and Structural Remnants + (ML052140119)
- E900-04-004, To Calculation E900-04-004, Cv Tunnel Unistrut Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Cv Steam Tunnel SS22 + (ML052140120)
- E900-04-006, Rev 0 to Calculation E900-04-006, Cv Yard Boulder and Soil Lift Survey Designs, Appendices D - N to Final Status Survey Report for Saxton Nuclear Experimental Corp Containment Vessel Yard Excavation - Soil and Structural Remnants + (ML052140121)
- E900-05-029, To Calculation E900-05-029, Assessment of Cv Tunnel Unistrut, Appendix C to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Cv Steam Tunnel SS22 + (ML052140123)
- ML052140128 + (ML052140128)
- 05000425/LER-2005-001, Regarding High Flux at Shutdown Alarm Inoperable - Operation in a Condition Prohibited by the Technical Specifications + (ML052140129)
- E910-05-047, Experimental Corp (SNEC) FSS Report for Ssgs Seal Chamber Roofs + (ML052140132)
- E910-05-049, Experimental Corporation, FSS Report for Open Land Area OL2 + (ML052140133)
- ML052140134 + (ML052140134)
- E900-03-032, Rev 0 to Calculation E900-03-032, Top of Seal Chamber 3 - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces - Seal Chamber Roofs SS17 (1&2) & + (ML052140136)
- ML052140142 + (ML052140142)
- E900-04-012, Rev 0 to Calculation E900-04-012, Cv Tunnel & Top of Seal Chambers 1 & 2 Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces - Seal Chamber Roof + (ML052140144)
- E900-05-009, To Calculation E900-05-009, Westinghouse and Adjacent Areas Open Land - OL2 - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL2 + (ML052140149)
- ML052140150 + (ML052140150)
- E900-05-011, To Calculation E900-05-011, Westinghouse and Adjacent Areas MA8-5 Concrete Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL2 + (ML052140153)
- ML052140156 + (ML052140156)
- E910-05-043, Submittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Intake Tunnel + (ML052140158)
- ML052140163 + (ML052140163)
- E900-03-016, Rev 0 to Calculation E900-03-016, Shinka Discharge & Intake Tunnels FSS Survey Design, Appendices a - C to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Intak + (ML052140167)
- ML052140172 + (ML052140172)
- ML052140175 + (ML052140175)
- ML052140176 + (ML052140176)
- E910-05-054, Rev. 0 to Calculation E900-03-014, Shonka Line Shack & Warehouse/Garage Pads FSS Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Structural Surfaces - Small Penelec Garage GA1-1 + (ML052140178)
- ML052140180 + (ML052140180)
- ML052140181 + (ML052140181)
- ML052140185 + (ML052140185)
- E910-05-055, Rev. 0 to Calculation 6900-02-025, Multiple Source Term Bounding Calculation, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corporation Embedded / Buried Piping + (ML052140186)
- ML052140187 + (ML052140187)
- ML052140189 + (ML052140189)
- ML052140191 + (ML052140191)
- ML052140195 + (ML052140195)
- E910-05-046, Rev 0 to E900-04-017, Upper Spray Pump Area and Discharge Tunnel Entrance Survey Design, Appendix B & Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfa + (ML052140198)
- ML052140218 + (ML052140218)
- ML052140229 + (ML052140229)
- ML052140235 + (ML052140235)
- ML052140239 + (ML052140239)
- E910-05-051, Transmittal of Saxton Nuclear Experimental Corporation (Snec), FSS Report for Residual Macadam in OL1 + (ML052140240)
- ML052140241 + (ML052140241)
- E910-05-052, Rev. 0 to Calculation E900-04-027, Cv Yard Survey Design - Temporary Water Supply Trench in Cv Yard, Appendix A-1 to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survey Unit OL1-6 + (ML052140245)
- E910-05-056, Rev. 0 to Calculation E900-05-024, Open Land FSS Design-OL3, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL3 + (ML052140247)
- ML052140253 + (ML052140253)
- ML052140255 + (ML052140255)
- ML052140256 + (ML052140256)
- NLS2005064, Change to Emergency Plan Implementing Procedure + (ML052140258)
- ML052140259 + (ML052140259)
- RS-05-096, Response to Ral Regarding NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (ML052140271)