ML052140187
| ML052140187 | |
| Person / Time | |
|---|---|
| Site: | Saxton File:GPU Nuclear icon.png |
| Issue date: | 07/27/2005 |
| From: | Kuehn G GPU Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| E910-05-046 | |
| Download: ML052140187 (1) | |
Text
PU NUCLEAR GPU Nuclear, Inc.
Three Mile Island Nuclear Station Route 441 South Post Office Box 480 Middletown, PA 17057.0480 Tel 717-948-8461 July 27, 2005 E910-05-046 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen, Subject Saxton Nuclear Experimental Corporation (SNEC)
Operating License No., DPR-4 Docket No. 50-146 FSS Report for SSGS Spray Pump Area The purpose of this letter is to submit for your review the attached FSS Report for SSGS Spray Pump Area. One CD-ROM is included in this submission. The CD-ROM labeled: *FSS Report - SSGS Spray Pump Area -
Publicly Available" contains the following 5 files:
Document Title File Name File Size (Mbytes)
Main Report 001 Final Report - SSGS Spray 0.720 Pump Area.pdf I__
Appendix A (pages 1 -10) 002 - Appendix A (1-10).pdf 11.5 Appendix A (attachments 1-1 to 9-10) 003 - Appendix A (attachments 49.4
_1-1 to 9-10).pdfI Appendix B (pages 1-9) 004 -Appendix B (1-9).pdf 10.9 Appendix B (attachments 1-1 to 9-8) 005 -Appendix B (attachments 35.8 1 -1 to 9-8). pdf If you have any questions on this information, please contact Mr. Art Paynter at (717) 948-8425.
Sincrely_
G. A. Kuehn Program Director, SNEC cc:
NRC Project Manager NRC Project Scientist, Region I Mr. Tim Bauer, ORISE Project Leader