ML052140176
| ML052140176 | |
| Person / Time | |
|---|---|
| Site: | Saxton File:GPU Nuclear icon.png |
| Issue date: | 07/27/2005 |
| From: | Kuehn G GPU Nuclear Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| E910-05-055 | |
| Download: ML052140176 (1) | |
Text
NUCLEAR GPU Nuclear, Inc.
Three Mile Island Nuclear Station Route 441 South Post Office Box 480 Middletown, PA 17057-0480 Tel 717-948-8461 July 27, 2005 E910-05-055 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen, Subject Saxton Nuclear Experimental Corporation (SNEC)
Operating License No., DPR-4 Docket No. 50-146 FSS Report for Embedded / Buried Piping The purpose of this letter is to submit for your review the attached FSS Report for Embedded / Buried Piping.
One CD-ROM is included in this submission. The CD-ROM labeled: WFSS Report - Embedded and Buried Pipe -
Publicly Available* contains the following 3 files:
Document Title File Name File Size (Mbytes)
Main Report 001 Final Report-Embedded 12.5 and Buried Pipe.pdf Appendix A 002 - Appendix A.pdf 15.6 1 ~
Appendix B 1
003 - Appendix B.pdf 129.6 If you have any questions on this information, please contact Mr. Art Paynter at (717) 948-8425.
Sincerely
,.2, G. A1(
ehn Program Director, SNEC cc:
NRC Project Manager NRC Project Scientist, Region 1 Mr. Tim Bauer, ORISE Project Leader 40ab