Search results
Jump to navigation
Jump to search
Did you mean: video regarding
- use of video recording to verify the as-left condition meets test acceptance criteria. During this inspection, the inspectors requested the video recording27 KB (3,749 words) - 02:13, 27 November 2024
- detection system alarm the security video assessment system provided video Image recording with real time display of video Images to provide post-alarm activity11 KB (1,649 words) - 19:36, 27 November 2024
- presentation is available at ADAMS Accession No. ML21256A231, and a video recording of the workshop is available here. This workshop summary does not include4 KB (452 words) - 21:35, 27 November 2024
- production weld. A review of the video recording made during the demonstration showed that the camera system was capable of recording the image of the test wire8 KB (1,254 words) - 02:19, 8 December 2024
- detection system alarm the security video assessment system provides video image recording with real-time display of video images to provide post-alarm activity10 KB (1,647 words) - 10:41, 4 January 2025
- the presentation when you go back through the slides. There was an video recording of the presentation; however, I am not quite sure how to share this4 KB (514 words) - 17:42, 27 November 2024
- videotape or some other video medium, before an official transcript is prepared under paragraph (b) of this section, that video recording will be considered2 KB (363 words) - 10:17, 9 December 2016
- renewal. CONTACT: Brian Harris 301415-2277 The video recording of this public meeting can be found at https://video.nrc.gov/. Sincerely, /RA/ Brian K, Harris7 KB (948 words) - 04:14, 27 November 2024
- the presentation when you go back through the slides. There was an video recording of the presentation; however, I am not quite sure how to share this3 KB (324 words) - 17:46, 27 November 2024
- RF07 (1994) is a black and white recording and not a color recording. The RF07 video is the earliest video recording of this area. -4 In response to the13 KB (2,070 words) - 10:22, 11 January 2025
- 2006, 2000, and 1994). The 1994 video is the earliest video recording of this area and is a black-and-white recording. Because structural interferences19 KB (2,939 words) - 06:20, 10 January 2025
- contents. The video recording indicated some corrosion had occurred on the drums. The extent of damage to the drums was not clear in the recording. Based on35 KB (5,804 words) - 12:36, 9 January 2025
- Notification, AmerGen also stated that it had "reviewed the 'as left' video recording of the external surface of Bay 11 during the 2006" refueling outage13 KB (2,118 words) - 12:10, 14 January 2025
- this, you presented a video recording of a simulator session conducted following discovery of the failure. A copy of the video recording is available in ADAMS24 KB (3,640 words) - 23:16, 10 January 2025
- ML11348A013 (category Video Recording)The submitter of this video, did not provided the NRC with a transcribed version. In order to respond to the Davis-Besse scoping comments it was transcribed13 KB (2,409 words) - 21:36, 12 January 2025
- its investigation of these findings, AmerGen reviewed the "as left" video recording of the external surface of Bay 11 during the 2006 1 R21 outage, which6 KB (936 words) - 12:10, 14 January 2025
- and the visible effects of the tests, was created, together with a video recording of the impact phases for each drop. Following each drop, uranium contamination16 KB (2,728 words) - 15:34, 27 November 2024
- a pool and in a hot cell. Tom Palmisano of SCE related in a YouTube video recording of the March 22 Community Engagement Panel that there would be a need5 KB (848 words) - 03:31, 6 January 2025
- and the visible effects of the tests, was created, together with a video recording of the impact phases for each drop. Following each drop, uranium contamination16 KB (2,728 words) - 15:39, 27 November 2024
- Notification, AmerGen also stated that it had "reviewed the 'as left' video recording of the external surface of Bay 11 during the 2006" refueling outage13 KB (2,115 words) - 12:10, 14 January 2025