List of redirects

Jump to navigation Jump to search

Showing below up to 50 results in range #1 to #50.

View (previous 50 | ) (20 | 50 | 100 | 250 | 500)

  1. "JAFP-17-0030" →‎ JAFP-17-0030, Submittal of 2017 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes
  2. "remote shutdown" →‎ Remote shutdown
  3. (. Boyce →‎ (Res) Tom Boyce
  4. (. Holzman →‎ (Schwartzman) Jennifer Holzman
  5. (. Savoy →‎ (Adm) Steven Savoy
  6. ( Boyce →‎ (Res) Tom Boyce
  7. ( Holzman →‎ (Schwartzman) Jennifer Holzman
  8. ( Savoy →‎ (Adm) Steven Savoy
  9. 05000000/LER-1950-237 →‎ 05000000/LER-1950-237, Updated LER 50-237/01L:on 760406,unacceptable Ultrasonic Indication Found on Isolation Condenser safe-end.Caused by Cracks in safe-ends.Cracked safe-end Removed & Sent to Bmcl for Metallographic Analysis
  10. 05000000/LER-1950-266-75 →‎ 05000000/LER-1950-266-75, /75-18:on 751217,during Cycle 3-4 Refueling, Discovered Section of Fuel Rod Missing.Caused by Water Impingement Through Baffle Plate While Failed Assembly in Cycle 2 Position H-1.Investigation in Progress
  11. 05000000/LER-1950-266-76 →‎ 05000000/LER-1950-266-76, /76-12:on 761222,wall Cladding Defects Noted in One Rod of Fuel Assembly G07.Caused by Rod Vibrating Against Rod Retaining Grid Springs.Peening of Core Baffle Plate Joints,Completed in Nov 1976,should Prevent Recurrence
  12. 05000000/LER-1975-004 →‎ 05000000/LER-1975-004, :on 750112 & 13,analysis of Reactor Bldg Vent Process Radiation Monitoring Sys Revealed Release of Radioactive Effluents Exceeding Tech Spec Limit by 55%. Caused by High Iodine Activity in Reactor Coolant
  13. 05000000/LER-1975-004, :on 750112 & 13,analysis of Reactor Bldg Vent Process Radiation Monitoring Sys Revealed Release of Radioactive Effluents Exceeding Tech Spec Limit by 55%. Caused by High Iodine Activity in Reactor Coolant
  14. 05000000/LER-1975-004, Forwards LER 75-004-00.Conclusions of Investigation Will Be Submitted in 10-day Rept →‎ 05000000/LER-1975-004
  15. 05000000/LER-1975-005 →‎ 05000000/LER-1975-005, :on 750127,analysis of Reactor Bldg Vent & Main Stack Charcoal & Particulate Filters Revealed Release Rates of Halogens & Particulates w/half-lives Greater than 8 Days, Exceeding Tech Spec Limits by 24%
  16. 05000000/LER-1975-014 →‎ 05000000/LER-1975-014, :on 750519,analysis of Reactor Bldg Vent & Main Stack Charcoal & Particulate Filters for Wk of 750513-20 Revealed Release Rates of Halogens & Particulates Exceeding Tech Spec Limits by 23%
  17. 05000000/LER-1976-010-03 →‎ 05000000/LER-1976-010-03, /03L:on 760723,during Start Testing of Emergency Diesel Generator 1,water Detected in Cylinder 7.Caused by Crack in Cylinder Head.Engine Repaired by Replacing Cylinder Head & Head Gasket
  18. 05000000/LER-1976-014 →‎ 05000000/LER-1976-014, Circulator 1B Tripped on Loss of Bearing Water Due to Apparent Decrease of Bearing Water Cavity Differential Pressure.Cause Unidentified
  19. 05000000/LER-1976-014-03 →‎ 05000000/LER-1976-014-03, /3L:on 760907,high Vibration at Tube Tension Assembly Detected on 13 of 16 Svc Water Pumps.Caused by Loose Bolts & Galvanic Corrosion at Column Pipe Flanges. Pumps Replaced
  20. 05000000/LER-1976-018-03 →‎ 05000000/LER-1976-018-03, /03L-0:on 760522,snubber 4439 RHR Sys to Fuel Pool Sys Cross Tie Line Found to Have Empty Oil Reservoir Due to Leaking Reservoir Shaft Seal.Caused by Equipment Failure.Snubber Internals replaced.W/760621 Forwarding Ltr
  21. 05000000/LER-1977-005 →‎ 05000000/LER-1977-005, Updated LER 77-005/1T:on 770114,failure of High Pressure Svc Water/Emergency Svc Water & Emergency Cooling Water Pumps to Meet FSAR Seismic Requirements Noted.Caused by Change in Calculation Techniques
  22. 05000000/LER-1977-005-01 →‎ 05000000/LER-1977-005-01, /1P:on 770114,failure of High Pressure Svc Water/Emergency Svc Water & Emergency Cooling Water Pumps to Meet FSAR Seismic Requirements Noted.Caused by Change in Calculational Techniques.Bolts/Restraints to Be Added
  23. 05000000/LER-1977-012 →‎ 05000000/LER-1977-012, :on 770620,during Investigation of Cycle 5 Max Critical Power Ratio Limits,Ge Found That Pump Trip Delay Time Assumed in Original Cycle 5 Transient Analysis Not Appropriate.Amend Request Will Be Submitted
  24. 05000000/LER-1977-020-03 →‎ 05000000/LER-1977-020-03, /03L:on 770404,RCS Leakage Determined to Be Greater than 10 Gpm.Caused by Packing Leakage Past Stems on RTD Bypass Throttle Valves 13RC20 & 14RC20.Valves Placed on Backseat & Stem Leakage Decreased
  25. 05000000/LER-1977-038-03 →‎ 05000000/LER-1977-038-03, /03L:on 770519,RCS Leakage Determined to Be Greater than 10 Gpm from Stem Leakoff on Manual Isolation Valves 1PS24 & 1PS28 for Pressurizer Spray Valves.Caused by Packing Leakage.Valves Will Be Repacked at Next Outage
  26. 05000000/LER-1977-040 →‎ 05000000/LER-1977-040, Forwards LER 77-040/01T
  27. 05000000/LER-1977-040-01 →‎ 05000000/LER-1977-040-01, /01T:on 771213,two Hydrogen Detonations Occurred in Offgas Sys & Stack Base,Resulting in Momentary Radioactive Release & Injury to One Employee.Initial Detonation Caused by Arc Strike on Instrument Tubing
  28. 05000000/LER-1977-043 →‎ 05000000/LER-1977-043, Forwards LER 77-043/03L-0.Detailed Event Analysis Encl
  29. 05000000/LER-1977-043-03 →‎ 05000000/LER-1977-043-03, /03L-0:on 771219,stack Gas Monitor Sample Probes & Mounting Beam Discovered Damaged.Caused by 771213 Stack Base Hydrogen Detonation.Monitor Probes & Support Beam Replaced & Sys Operation Restored on 771223
  30. 05000000/LER-1982-023-03 →‎ 05000000/LER-1982-023-03, /03L-0:on 821121,containment Pressure Sensing Line Found Capped.Caused by Personnel Error.Units Will Be Labeled
  31. 05000000/LER-1982-026-03 →‎ 05000000/LER-1982-026-03, /03L-0:on 821115,turbine Driven Auxiliary Feedwater Pump 11 Failed to Deliver Full Flow of 200 Gpm to Steam Generators.Caused by Unscrewed Governor Valve.Valve Seat Reinstalled & Staked in Position
  32. 05000000/LER-1982-094-03 →‎ 05000000/LER-1982-094-03, /03L-0:on 820815,reactor Coolant Hot Leg Sample Trip Valves TV-SS-106A & B Failed to Close After Chemists Completed Taking RCS Sample.Cause Not Determined.Manual Isolation Valve 1-SS-116 Closed
  33. 05000000/LER-1982-152-03 →‎ 05000000/LER-1982-152-03, /03L-0:on 821121,condenser Evacuation Sys Radiation Monitor Declared Inoperable Due to Loss of Process Flow.Caused by Faulty Velocity Probe Associated W/Monitor.Probe Replaced & Monitor Returned to Svc
  34. 05000000/LER-1983-001-01 →‎ 05000000/LER-1983-001-01, /01T-0:on 830204,Exxon ECCS Analysis Error Discovered.Caused by Input Error Into Codes
  35. 05000000/LER-1983-002-01 →‎ 05000000/LER-1983-002-01, /01T-0:on 830405,spent Fuel Assembly X-13 Dropped Back Into Rack from Fully Lifted Position.Caused by Cable Stress Due to Limit Switch Failure.Insp for Cladding Damage Will Be Conducted
  36. 05000000/LER-1983-002-03 →‎ 05000000/LER-1983-002-03, /03L-0:on 830307,safety-related Shock Suppressor Safety Injection Sys 134 Removed to Accommodate Maint on Control Element Drive Mechanism & Not Replaced within 72 H After Core Reloading Begun.Snubber Replaced
  37. 05000000/LER-1983-007-03 →‎ 05000000/LER-1983-007-03, /03L-0:on 830330,steam Line Radiation Monitors Discovered Inoperable.Monitors Repaired & Surveillance Procedure Revised to Include Daily Check
  38. 05000000/LER-1983-008-03 →‎ 05000000/LER-1983-008-03, /03L-0:on 830410,right Hand Stop Valve Failed. Caused by Separation of Valve Disc from Clapper Arm Disc. Valve Repaired & Will Be Replaced at Next Refueling Outage. Left Hand Stop Valve Also Inspected
  39. 05000000/LER-1983-011-03 →‎ 05000000/LER-1983-011-03, /03L-0:on 830510,diesel Generator D2 Tripped. Caused by Drift in Dryer Pressure Switch Model 1822.1. Switch Recalibr
  40. 05000000/LER-1983-034-03 →‎ 05000000/LER-1983-034-03, /03L-0:on 830419,Fire Door S71-18,between Emergency Diesel Room 2H & Turbine Bldg,Would Not Latch. Caused by Latch Sticking.Latch Lubricated
  41. 05000000/LER-1984-002 →‎ 05000000/LER-1984-002, :Since 840107,several Instances of Reactor Protection Sys Bus Breaker Trips Resulted in Loss of Shutdown Cooling.Trip on 840119 Caused by Failure of Circuit Board
  42. 05000000/LER-1984-010 →‎ 05000000/LER-1984-010, :on 840210,reactor Protection Sys Motor Generator Set Output Breaker B Tripped While Transferring Power from Alternate Supply.Caused by Voltage Transient. Design Change Being Considered
  43. 05000000/LER-1985-035 →‎ 05000000/LER-1985-035, Forwards LER 85-035-00 Re Physical Security Event
  44. 05000000/LER-1985-035, Forwards LER 85-035-00 Re Physical Security Event
  45. 05000000/LER-1985-035, Partially Withheld LER 85-035-00:on 850531,moderate Loss of Physical Security Effectiveness Discovered.No Unauthorized or Undetected Access to Protected Area Occurred.Contractor Security Guard Dismissed & Training Session Plann →‎ 05000000/LER-1985-035
  46. 05000000/LER-1985-078 →‎ 05000000/LER-1985-078-01, Partially Withheld LER 85-078-01:on 851104,determined That Uncompensated Moderate Loss of Physical Security Effectiveness Could Have Occurred.Security Task Force Established
  47. 05000000/LER-1985-078, Forwards Revised LER 85-078-01 Re Physical Security Event →‎ 05000000/LER-1985-078-01, Partially Withheld LER 85-078-01:on 851104,determined That Uncompensated Moderate Loss of Physical Security Effectiveness Could Have Occurred.Security Task Force Established
  48. 05000000/LER-1985-078-01 →‎ 05000000/LER-1985-078-01, Forwards Revised LER 85-078-01 Re Physical Security Event
  49. 05000000/LER-1985-078-01, Forwards Revised LER 85-078-01 Re Physical Security Event
  50. 05000000/LER-1985-078-01, Partially Withheld LER 85-078-01:on 851104,determined That Uncompensated Moderate Loss of Physical Security Effectiveness Could Have Occurred.Security Task Force Established →‎ 05000000/LER-1985-078-01

View (previous 50 | ) (20 | 50 | 100 | 250 | 500)