TXX-6175, Interim Deficiency Rept CP-86-18 Re Difficulties in Starting & Operating Safety Chilled Water Chiller Units.Initially Reported on 860521.Detailed Review of Vendor Specs & Updating of Components List Continuing.Next Rept by 870309 +, TXX-6153, Interim Deficiency Rept CP-85-42 Re Adverse Effect of Rectangular Oversized Preformed Thermolag on Conduit Installations.Initially Reported on 861026.Conduits Evaluated & Corrective Action Initiated.Next Rept by 870428 +, TXX-6174, Forwards Rev 0 to 09-0210-060, Generic Technical Issue Rept - Evaluation & Resolution of Tera Equipment Qualification Repts.... Rept Prepared to Resolve Seismic & Environ Qualification Concerns Identified by Tera +, TXX-6201, Interim Deficiency Rept CP-86-82 Re Cable Tray Hanger (Cth) Splice Welds.Initially Reported on 861208.CHTs W/O Thermolag Examined & Locations Noted on as-built Drawings.Next Rept Anticipated by 870403 +, TXX-6132, Final Deficiency Rept CP-86-26 Re Steam Generator Upper Lateral Restraint Embedment Design.Initially Reported on 850719.Issue Not Reportable Under 10CFR50.55(e) +, TXX-6140, Final Deficiency Rept CP-86-80 Re Recommended Torque Values for Jc White Tubing Restraints.Initially Reported on 861107. Specs & Procedures Will Be Revised to Implement Mfg Requirements.Issue Not Reportable Under 10CFR50.55(e) +, TXX-6146, Interim Deficiency Rept CP-86-53 Re Seismic Design of Conduit.Initially Reported on 861021.Testing Program Schedule Delayed.Next Rept Expected by 870220 +, TXX-6102, Forwards Comanche Peak Response Team (Cprt) Responses to Case 850814 Comments on Welding,As Requested in NRC 850930 Evaluation of Cprt Program Plan.Emphasizes That Reinsp Efforts by Third Party Are Not Insps of Record +, TXX-6177, Interim Deficiency Rept CP86-62 Re Misinterpretation of Polar Crane Load Cases.Initially Reported on 861003.Analysis of Rail & Clips for Reduced Loads Will Be Completed by 870105.Next Rept Anticipated by 870126 +, TXX-6212, Forwards Addl Info in Response to Violations Noted in Insp Rept 50-446/85-11,per NRC 861230 Request.Corrective Action: Training Program for S&W Pipe Support Organization Verified & Engineering Supervisor No Longer Active in Organization +, TXX-6220, Final Deficiency Rept CP-86-70 Re Elevated Temp Effects on Instrument Supports & Tubing.Initially Reported on 861002. Installations & Mods Will Be Implemented as Required to Alleviate Unacceptable Conditions +, TXX-6230, Final Deficiency Rept CP-86-16 Re Detrimental Effects of Low Melting Point Metals on Stainless Steel Instrument Tubing During Fire.Initially Reported on 860321.Mods Will Be Implemented as Required +, TXX-6134, Responds to NRC 861117 Request for Addl Info on Violation & Deviation Noted in Insp Repts 50-445/85-18 & 50-446/85-15. Corrective actions:CP-QP-2.1 Revised to Eliminate Need for Min OJT & OJT Waivers & Verification Package Reinspected +, TXX-6180, Final Deficiency Rept CP-86-17 Re Min Concrete Coverage of Reinforced Steel in Walls & Floors Required to Maintain 3 H Fire Rating.Initially Reported on 860321.Facility Design Complies W/Bldg Code.Item Not Reportable Per 10CFR50.55(e) +, TXX-6185, Forwards Test Repts 48422-1, Cable Separation Test Program & 48037-02, Electrical Raceway Separation Verification Testing. FSAR Changes Scheduled for Future FSAR Amend Also Encl +, TXX-6168, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.QC Verification of Const Activities Scheduled for Completion by 870130.Next Rept Will Be Submitted by 870220 +, TXX-6162, Advises That Text Revs Contained in FSAR Amend 61 Unchanged Except for Listed Changes on Pages 3.9B-4 & 17.1-32 Re Small Steam Line & Large High Energy Line +, TXX-6138, Interim Deficiency Rept CP-85-31 Re Indeterminate Structural Integrity of Electrical Raceway Support Sys.Initially Reported on 850827.Addl Supports Added & Conduit Supports Modified.Next Rept Will Be Submitted by 870310 +, TXX-6213, Suppls 861009 & 31 Responses to Violations Noted in Insp Repts 50-445/86-06 & 50-445/86-04.Corrective Actions:Insp Instruction QI-QP-11.3-26 & Const Procedure EEI-7 Revised to Address Specific Electrical Erection Spec Requirements +, TXX-6143, Forwards Documents Requested by Cygna During 861113-14 Meeting W/Cygna & S&W in Cherry Hill,Nj +, TXX-6228, Final Deficiency Rept CP-86-77 Re Spec of Min Wall Thickness in Instrument Tubing.Initially Reported on 861021.Mods Will Be Implemented as Required to Alleviate All Unacceptable Conditions +, TXX-6200, Advises That Completion Date for Corrective Action for Procedure STA-606, Work Orders/Work Requests, Changed from 861231 to 870228,per Violation 446/8509-V-02 +, TXX-6206, Interim Deficiency Rept CP-86-36 Re Large Bore Piping & Supports.Initially Reported on 860609.Continuing Engineering Evaluation Has Not Identified Addl Reportable Instances.Next Rept Will Be Issued by 870220 +, TXX-6207, Followup Interim Deficiency Rept CP-86-72 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program. Initially Reported on 860609.List of Mods Issued to Date Encl.Next Rept Will Be Submitted on 870220 +, TXX-6148, Forwards Revs 0 to Evaluation & Resolution of Generic Technical Issues for HVAC Sys..., SAG.CP23, Seismic Design Criteria... & SAG.CP24 as Part of Facility Response Team Cable Tray & Conduit Support Program +, TXX-6159, Forwards S&W Small Bore Piping & Pipe Supports Generic Issues Rept. Rept Part of Comanche Peak Response Team Piping & Pipe Supports Requalification Effort +, TXX-6182, Forwards Comanche Peak Steam Electric Station Design Basis Consolidation Program Plan & Rev 0 to Civil/Structural Generic Issues Rept, Prepared by S&W +, TXX-6157, Forwards Response to Request for Supplemental Info Re Coating Performance Program (Sser 9,NUREG-0797).Program Implemented on 850617 for in-process Coating Work Assures Integrity of Containment Coatings Throughout Life of Plant +, TXX-6191, Forwards 861217 Rev 0 to S&W 7175-1634503-B2, Electrical Generic Issues Rept. Resolution of Items Discussed in Rept Will Be Performed as Part of Design Basis Consolidation Program Discussed in Author to Recipient +, TXX-6147 +...
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
ML20211A096 +, ML20211A096 +, ML20211A096 +, ML20211A096 +, ML20211A096 +, ML20211A096 +, ML20211A096 +, ML20211A096 +, ML20211A096 +, ML20211A096 + and ML20211A096 +
February 10, 1987 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
05:41:05, 6 December 2024 +
36 +
Processing error"Processing error" is a predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> and represents errors that appeared in connection with improper value annotations or input processing.
Request +
February 10, 1987 +
TXX-6175, Interim Deficiency Rept CP-86-18 Re Difficulties in Starting & Operating Safety Chilled Water Chiller Units.Initially Reported on 860521.Detailed Review of Vendor Specs & Updating of Components List Continuing.Next Rept by 870309 +, TXX-6153, Interim Deficiency Rept CP-85-42 Re Adverse Effect of Rectangular Oversized Preformed Thermolag on Conduit Installations.Initially Reported on 861026.Conduits Evaluated & Corrective Action Initiated.Next Rept by 870428 +, TXX-6174, Forwards Rev 0 to 09-0210-060, Generic Technical Issue Rept - Evaluation & Resolution of Tera Equipment Qualification Repts.... Rept Prepared to Resolve Seismic & Environ Qualification Concerns Identified by Tera +, TXX-6201, Interim Deficiency Rept CP-86-82 Re Cable Tray Hanger (Cth) Splice Welds.Initially Reported on 861208.CHTs W/O Thermolag Examined & Locations Noted on as-built Drawings.Next Rept Anticipated by 870403 +, TXX-6132, Final Deficiency Rept CP-86-26 Re Steam Generator Upper Lateral Restraint Embedment Design.Initially Reported on 850719.Issue Not Reportable Under 10CFR50.55(e) +, TXX-6140, Final Deficiency Rept CP-86-80 Re Recommended Torque Values for Jc White Tubing Restraints.Initially Reported on 861107. Specs & Procedures Will Be Revised to Implement Mfg Requirements.Issue Not Reportable Under 10CFR50.55(e) +, TXX-6146, Interim Deficiency Rept CP-86-53 Re Seismic Design of Conduit.Initially Reported on 861021.Testing Program Schedule Delayed.Next Rept Expected by 870220 +, TXX-6102, Forwards Comanche Peak Response Team (Cprt) Responses to Case 850814 Comments on Welding,As Requested in NRC 850930 Evaluation of Cprt Program Plan.Emphasizes That Reinsp Efforts by Third Party Are Not Insps of Record +, TXX-6177, Interim Deficiency Rept CP86-62 Re Misinterpretation of Polar Crane Load Cases.Initially Reported on 861003.Analysis of Rail & Clips for Reduced Loads Will Be Completed by 870105.Next Rept Anticipated by 870126 +, TXX-6212, Forwards Addl Info in Response to Violations Noted in Insp Rept 50-446/85-11,per NRC 861230 Request.Corrective Action: Training Program for S&W Pipe Support Organization Verified & Engineering Supervisor No Longer Active in Organization +, TXX-6220, Final Deficiency Rept CP-86-70 Re Elevated Temp Effects on Instrument Supports & Tubing.Initially Reported on 861002. Installations & Mods Will Be Implemented as Required to Alleviate Unacceptable Conditions +, TXX-6230, Final Deficiency Rept CP-86-16 Re Detrimental Effects of Low Melting Point Metals on Stainless Steel Instrument Tubing During Fire.Initially Reported on 860321.Mods Will Be Implemented as Required +, TXX-6134, Responds to NRC 861117 Request for Addl Info on Violation & Deviation Noted in Insp Repts 50-445/85-18 & 50-446/85-15. Corrective actions:CP-QP-2.1 Revised to Eliminate Need for Min OJT & OJT Waivers & Verification Package Reinspected +, TXX-6180, Final Deficiency Rept CP-86-17 Re Min Concrete Coverage of Reinforced Steel in Walls & Floors Required to Maintain 3 H Fire Rating.Initially Reported on 860321.Facility Design Complies W/Bldg Code.Item Not Reportable Per 10CFR50.55(e) +, TXX-6185, Forwards Test Repts 48422-1, Cable Separation Test Program & 48037-02, Electrical Raceway Separation Verification Testing. FSAR Changes Scheduled for Future FSAR Amend Also Encl +, TXX-6168, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.QC Verification of Const Activities Scheduled for Completion by 870130.Next Rept Will Be Submitted by 870220 +, TXX-6162, Advises That Text Revs Contained in FSAR Amend 61 Unchanged Except for Listed Changes on Pages 3.9B-4 & 17.1-32 Re Small Steam Line & Large High Energy Line +, TXX-6138, Interim Deficiency Rept CP-85-31 Re Indeterminate Structural Integrity of Electrical Raceway Support Sys.Initially Reported on 850827.Addl Supports Added & Conduit Supports Modified.Next Rept Will Be Submitted by 870310 +, TXX-6213, Suppls 861009 & 31 Responses to Violations Noted in Insp Repts 50-445/86-06 & 50-445/86-04.Corrective Actions:Insp Instruction QI-QP-11.3-26 & Const Procedure EEI-7 Revised to Address Specific Electrical Erection Spec Requirements +, TXX-6143, Forwards Documents Requested by Cygna During 861113-14 Meeting W/Cygna & S&W in Cherry Hill,Nj +, TXX-6228, Final Deficiency Rept CP-86-77 Re Spec of Min Wall Thickness in Instrument Tubing.Initially Reported on 861021.Mods Will Be Implemented as Required to Alleviate All Unacceptable Conditions +, TXX-6200, Advises That Completion Date for Corrective Action for Procedure STA-606, Work Orders/Work Requests, Changed from 861231 to 870228,per Violation 446/8509-V-02 +, TXX-6206, Interim Deficiency Rept CP-86-36 Re Large Bore Piping & Supports.Initially Reported on 860609.Continuing Engineering Evaluation Has Not Identified Addl Reportable Instances.Next Rept Will Be Issued by 870220 +, TXX-6207, Followup Interim Deficiency Rept CP-86-72 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program. Initially Reported on 860609.List of Mods Issued to Date Encl.Next Rept Will Be Submitted on 870220 +, TXX-6148, Forwards Revs 0 to Evaluation & Resolution of Generic Technical Issues for HVAC Sys..., SAG.CP23, Seismic Design Criteria... & SAG.CP24 as Part of Facility Response Team Cable Tray & Conduit Support Program +, TXX-6159, Forwards S&W Small Bore Piping & Pipe Supports Generic Issues Rept. Rept Part of Comanche Peak Response Team Piping & Pipe Supports Requalification Effort +, TXX-6182, Forwards Comanche Peak Steam Electric Station Design Basis Consolidation Program Plan & Rev 0 to Civil/Structural Generic Issues Rept, Prepared by S&W +, TXX-6157, Forwards Response to Request for Supplemental Info Re Coating Performance Program (Sser 9,NUREG-0797).Program Implemented on 850617 for in-process Coating Work Assures Integrity of Containment Coatings Throughout Life of Plant +, TXX-6191, Forwards 861217 Rev 0 to S&W 7175-1634503-B2, Electrical Generic Issues Rept. Resolution of Items Discussed in Rept Will Be Performed as Part of Design Basis Consolidation Program Discussed in Author to Recipient +, TXX-6147 +...
Applicant Fourth Progress Rept.* Senior Review Team Approved & Issued 28 Results Repts (Representing 27 Action Plans). Notice to Case of Availability of Working Files for Action Plans Also Issued +