Browse wiki

Jump to navigation Jump to search
ML20204B756  +
TXX-6319, Interim Deficiency Rept CP-85-31 Re Electrical Raceway Support Sys.Initially Reported on 861205.Design Mods Resulting from Evaluation of Affected Conduit Installations Listed.Next Rept Expected by 870626 +, TXX-6296, Interim Deficiency Rept CP-86-36 Re Large Bore Piping & Supports.Initially Reported on 860609.Continued Engineering Evaluation Has Not Identified Addl Reportable Instances.Next Rept Will Be Submitted by 870410 +, TXX-6297, Interim Deficiency Rept CP-86-72 Re Reverification of Small Bore Piping & Supports.Initially Reported on 860609. Continuing Engineering Evaluation Found No Addl Reportable Instances.Next Rept Will Be Submitted by 870410 +, TXX-6316 +, TXX-6341, Final Deficiency Rept CP-86-14 Re 6.9 Kv Switchgear Breaker Jack Shaft Weld Failure.Initially Reported on 860311.All Jack Shafts in 6.9 Kv Switchgear Scheduled to Be Replaced by 871121 +, TXX-6175, Interim Deficiency Rept CP-86-18 Re Difficulties in Starting & Operating Safety Chilled Water Chiller Units.Initially Reported on 860521.Detailed Review of Vendor Specs & Updating of Components List Continuing.Next Rept by 870309 +, TXX-6072, Interim Deficiency Rept CP-86-67 Re Design Calculations & Tests Used to Qualify Preoperational Piping Vibration Program.Initially Reported on 860926.All Test Results Evaluated to Verify Validity.Next Rept Expected by 861219 +, TXX-6047, Interim Deficiency Rept CP-85-34 Re Adequacy of Conduit Supports to Perform Intended Design Functions.Initially Reported on 850906.Field Verification Data Being Analyzed. Next Rept Expected by 870227 +, TXX-6017, Interim Deficiency Rept CP-86-40 Re Procurement & Use of Nonqualified Agastat Relays in Several Class 1E Applications.Initially Reported on 860528.Nonqualified Relays Will Be Replaced by 861231 +, TXX-6007, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 860917.Const of New Ceiling Scheduled for Completion by 861101.Next Rept Anticipated by 861114 +, TXX-6136, Interim Deficiency Rept CP-86-66 Re Vertical Rebar Exposed During Insp of Core Bores in Auxiliary Bldg That Did Not Satisfy Criteria of Code Defined Lap Splice.Initially Reported on 860926.Next Rept Will Be Submitted by 870218 +, TXX-6125, Interim Deficiency Rept CP-86-71 Re Electrical Cable Pulling Tension.Initially Reported on 861002.Assessment of Effects of Deficiency on Plant Operations Should Be Completed by 870202.Next Rept Anticipated by 870225 +, TXX-6122, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Ultrasonic Testing Will Be Completed by 870227.Next Rept Anticipated by 870320 +, TXX-6326, Interim Deficiency Rept CP-86-78 Re Structural Steel Bolting Connections W/Threads in Shear Plane in Cable Spreading Room.Initially Reported on 861107.Calculations Completed Verifying Design Adequacy.Next Rept Submitted by 870604 +, TXX-6107, Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary & Containment Bldgs.Initially Reported on 860814.Present Air Gap Width Acceptable.Review & Evaluation Continuing.Next Rept to Be Submitted by 870313 +, TXX-6097, Interim Deficiency Rept CP-86-75 Re American Switch Co Solenoid Valves in Piston Air Actuators of Papco Dampers. Initially Reported on 860904.Evaluation Continuing. Next Rept Expected by 870219 +, TXX-6227, Interim Deficiency Rept CP-86-40 Re Procurement & Use of Nonqualified Agastat Relays in Class 1E Applications. Initially Reported on 861010.Corrective Actions Will Be Taken Upon Review Completion.Next Rept by 870306 +, TXX-6323, Interim Deficiency Rept CP-86-18 Re Difficulties in Starting & Operating Safety Chilled Water Chiller Units.Initially Reported on 860521.Vendors Contacted Re Revised Component Cooling Water Inlet Temp.Next Rept Submitted by 871218 +, TXX-6208, Interim Deficiency Rept CP-86-65 Re Unconsolidated Concrete in Exterior Wall of Reactor Containment Bldg.Initially Reported on 860915.Review Continuing.Final Rept Expected by 870313 +, TXX-6313, Interim Deficiency Rept CP-86-40 Re Procurement & Use of Nonqualified Agastat Relays in Several Class 1E Applications.Initially Reported on 861010.Identification of Nonqualified Relays Under Review.Next Rept by 870425 +, TXX-6288, Interim Deficiency Rept CP-86-71 Re Electrical Cable Pulling Tension.Initially Reported on 861002.Engineering Rept for Evaluation of Issue Should Be Completed by 870228.Summary of Plans Listed.Next Rept Anticipated by 870619 +, TXX-6168, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.QC Verification of Const Activities Scheduled for Completion by 870130.Next Rept Will Be Submitted by 870220 +, TXX-6187, Potential Interim Deficiency Rept CP-86-67 Re Design Calculations & Tests Used to Qualify Preoperational Piping Vibration Program.Initially Reported on 860926.Next Rept Will Be Submitted by 870219 +, TXX-6305, Interim Deficiency Rept CP-85-34 Re Adequacy of Conduit Supports.Initially Reported on 861021.Affected Unistrut Supports Will Be Replaced or Demonstrated as Not Needed. Next Rept Expected by 880201 +, TXX-6292, Final Deficiency Rept CP-86-50 Re Nut Alignment & Torque Requirements for Unistrut Spring Nuts on Instrument Mounts. Initially Reported on 861010.Plans Re Installations & Status of Mods Will Be Reported Via Deficiency Rept CP-86-19 +, TXX-6139, Interim Deficiency Rept CP-86-78 Re Deviations in Structural Steel Bolting in Cable Spreading Room.Initially Reported on 861107.Pertinent Std Design Criteria Will Be Reviewed.Next Rept Will Be Submitted by 870311 +, TXX-6138, Interim Deficiency Rept CP-85-31 Re Indeterminate Structural Integrity of Electrical Raceway Support Sys.Initially Reported on 850827.Addl Supports Added & Conduit Supports Modified.Next Rept Will Be Submitted by 870310 +, TXX-6286, Interim Deficiency Rept CP-86-53 Re Seismic Design of Conduits.Initially Reported on 861021.Testing Program Underway to Evaluate Ability of Adhesives or Clamps Applied to Couplings.Next Rept Expected by 870331 +, TXX-6287, Final Deficiency Rept CP-86-75 Re Asco Solenoid Valves in Piston Air Actuators of Papco Dampers.Initially Reported on 860904.Ethylene Propylene Diaphragms,Seals & O-rings of Valves Replaced.Issue Not Reportable Per 10CFR50.55(e) +, TXX-6290, Interim Deficiency Rept CP-86-67 Re Preoperational Vibrational Test Criteria.Initially Reported on 860926. Evaluation Continuing.Next Rept Expected by 870319 +...
05000445  +, 05000446  +, 00445  +, 00446  +  and 00443  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
March 20, 1987  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:35:39, 8 December 2024  +
37  +
Request  +
March 20, 1987  +
TXX-6319, Interim Deficiency Rept CP-85-31 Re Electrical Raceway Support Sys.Initially Reported on 861205.Design Mods Resulting from Evaluation of Affected Conduit Installations Listed.Next Rept Expected by 870626 +, TXX-6296, Interim Deficiency Rept CP-86-36 Re Large Bore Piping & Supports.Initially Reported on 860609.Continued Engineering Evaluation Has Not Identified Addl Reportable Instances.Next Rept Will Be Submitted by 870410 +, TXX-6297, Interim Deficiency Rept CP-86-72 Re Reverification of Small Bore Piping & Supports.Initially Reported on 860609. Continuing Engineering Evaluation Found No Addl Reportable Instances.Next Rept Will Be Submitted by 870410 +, TXX-6316 +, TXX-6341, Final Deficiency Rept CP-86-14 Re 6.9 Kv Switchgear Breaker Jack Shaft Weld Failure.Initially Reported on 860311.All Jack Shafts in 6.9 Kv Switchgear Scheduled to Be Replaced by 871121 +, TXX-6175, Interim Deficiency Rept CP-86-18 Re Difficulties in Starting & Operating Safety Chilled Water Chiller Units.Initially Reported on 860521.Detailed Review of Vendor Specs & Updating of Components List Continuing.Next Rept by 870309 +, TXX-6072, Interim Deficiency Rept CP-86-67 Re Design Calculations & Tests Used to Qualify Preoperational Piping Vibration Program.Initially Reported on 860926.All Test Results Evaluated to Verify Validity.Next Rept Expected by 861219 +, TXX-6047, Interim Deficiency Rept CP-85-34 Re Adequacy of Conduit Supports to Perform Intended Design Functions.Initially Reported on 850906.Field Verification Data Being Analyzed. Next Rept Expected by 870227 +, TXX-6017, Interim Deficiency Rept CP-86-40 Re Procurement & Use of Nonqualified Agastat Relays in Several Class 1E Applications.Initially Reported on 860528.Nonqualified Relays Will Be Replaced by 861231 +, TXX-6007, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 860917.Const of New Ceiling Scheduled for Completion by 861101.Next Rept Anticipated by 861114 +, TXX-6136, Interim Deficiency Rept CP-86-66 Re Vertical Rebar Exposed During Insp of Core Bores in Auxiliary Bldg That Did Not Satisfy Criteria of Code Defined Lap Splice.Initially Reported on 860926.Next Rept Will Be Submitted by 870218 +, TXX-6125, Interim Deficiency Rept CP-86-71 Re Electrical Cable Pulling Tension.Initially Reported on 861002.Assessment of Effects of Deficiency on Plant Operations Should Be Completed by 870202.Next Rept Anticipated by 870225 +, TXX-6122, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Ultrasonic Testing Will Be Completed by 870227.Next Rept Anticipated by 870320 +, TXX-6326, Interim Deficiency Rept CP-86-78 Re Structural Steel Bolting Connections W/Threads in Shear Plane in Cable Spreading Room.Initially Reported on 861107.Calculations Completed Verifying Design Adequacy.Next Rept Submitted by 870604 +, TXX-6107, Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary & Containment Bldgs.Initially Reported on 860814.Present Air Gap Width Acceptable.Review & Evaluation Continuing.Next Rept to Be Submitted by 870313 +, TXX-6097, Interim Deficiency Rept CP-86-75 Re American Switch Co Solenoid Valves in Piston Air Actuators of Papco Dampers. Initially Reported on 860904.Evaluation Continuing. Next Rept Expected by 870219 +, TXX-6227, Interim Deficiency Rept CP-86-40 Re Procurement & Use of Nonqualified Agastat Relays in Class 1E Applications. Initially Reported on 861010.Corrective Actions Will Be Taken Upon Review Completion.Next Rept by 870306 +, TXX-6323, Interim Deficiency Rept CP-86-18 Re Difficulties in Starting & Operating Safety Chilled Water Chiller Units.Initially Reported on 860521.Vendors Contacted Re Revised Component Cooling Water Inlet Temp.Next Rept Submitted by 871218 +, TXX-6208, Interim Deficiency Rept CP-86-65 Re Unconsolidated Concrete in Exterior Wall of Reactor Containment Bldg.Initially Reported on 860915.Review Continuing.Final Rept Expected by 870313 +, TXX-6313, Interim Deficiency Rept CP-86-40 Re Procurement & Use of Nonqualified Agastat Relays in Several Class 1E Applications.Initially Reported on 861010.Identification of Nonqualified Relays Under Review.Next Rept by 870425 +, TXX-6288, Interim Deficiency Rept CP-86-71 Re Electrical Cable Pulling Tension.Initially Reported on 861002.Engineering Rept for Evaluation of Issue Should Be Completed by 870228.Summary of Plans Listed.Next Rept Anticipated by 870619 +, TXX-6168, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.QC Verification of Const Activities Scheduled for Completion by 870130.Next Rept Will Be Submitted by 870220 +, TXX-6187, Potential Interim Deficiency Rept CP-86-67 Re Design Calculations & Tests Used to Qualify Preoperational Piping Vibration Program.Initially Reported on 860926.Next Rept Will Be Submitted by 870219 +, TXX-6305, Interim Deficiency Rept CP-85-34 Re Adequacy of Conduit Supports.Initially Reported on 861021.Affected Unistrut Supports Will Be Replaced or Demonstrated as Not Needed. Next Rept Expected by 880201 +, TXX-6292, Final Deficiency Rept CP-86-50 Re Nut Alignment & Torque Requirements for Unistrut Spring Nuts on Instrument Mounts. Initially Reported on 861010.Plans Re Installations & Status of Mods Will Be Reported Via Deficiency Rept CP-86-19 +, TXX-6139, Interim Deficiency Rept CP-86-78 Re Deviations in Structural Steel Bolting in Cable Spreading Room.Initially Reported on 861107.Pertinent Std Design Criteria Will Be Reviewed.Next Rept Will Be Submitted by 870311 +, TXX-6138, Interim Deficiency Rept CP-85-31 Re Indeterminate Structural Integrity of Electrical Raceway Support Sys.Initially Reported on 850827.Addl Supports Added & Conduit Supports Modified.Next Rept Will Be Submitted by 870310 +, TXX-6286, Interim Deficiency Rept CP-86-53 Re Seismic Design of Conduits.Initially Reported on 861021.Testing Program Underway to Evaluate Ability of Adhesives or Clamps Applied to Couplings.Next Rept Expected by 870331 +, TXX-6287, Final Deficiency Rept CP-86-75 Re Asco Solenoid Valves in Piston Air Actuators of Papco Dampers.Initially Reported on 860904.Ethylene Propylene Diaphragms,Seals & O-rings of Valves Replaced.Issue Not Reportable Per 10CFR50.55(e) +, TXX-6290, Interim Deficiency Rept CP-86-67 Re Preoperational Vibrational Test Criteria.Initially Reported on 860926. Evaluation Continuing.Next Rept Expected by 870319 +...
Forwards Potential 10CFR50.55(e) Items Re Significant Deficiency Analysis Repts to Assist Board in Desire to Be Kept up-to-date on Matters of Potential Significance. Related Correspondence  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.