The following information was provided by The following information was provided by the licensee via phone and fax:</br>Entry into shutdown technical specification action statement due to an identified breach in ventilation ductwork.</br>At 2250 EDT on September 9, 2025, it was discovered that there was degraded manway sealant on the manway to fire damper HV-298A. This degraded sealant results in a direct path from the enclosure building to the atmosphere, challenging the enclosure building boundary. This condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v)(C).</br>There is no impact on the health and safety of the public or plant personnel.</br>The plant is currently in a 24-hour technical specification action statement (3.6.5.2) for Unit 2. Unit 3 is not impacted and continues to operate at 100 percent power.</br>The Resident Inspector has been notified.</br>* * * RETRACTION ON SEPTEMBER 12, 2025, AT 0908 EDT FROM JARED FARLEY TO ERIC SIMPSON * * *</br>The following information was provided by the licensee via phone and fax:</br>Millstone Unit 2 is retracting NRC Event Notification (EN) 57912, made on September 10, 2025, at 0523 EDT, regarding a condition identified at Millstone Power Station Unit 2. The condition involved degraded sealant on manways to fire dampers HV-298A/B/G, which resulted in a direct path from the enclosure building to the atmosphere, challenging the integrity of the enclosure building boundary. This condition was initially reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v)(C) for an event or condition that could have prevented the fulfillment of a safety function (control of release of radioactive material).</br>A subsequent review using additional information on hatch design and actual seating surface determined that there is reasonable assurance the enclosure building boundary remained operable and retained its safety function to control the release of radioactive material and mitigate the consequences of an accident. Based on this assessment, Unit 2 exited Technical Specification action statement 3.6.5.2, and the condition is not reportable under 10 CFR 50.72(b)(3)(v)(C). Therefore, NRC EN 57912 is being retracted.</br>The Resident Inspector has been notified.</br>Notified R1DO (Ford).r has been notified. Notified R1DO (Ford).  
02:50:00, 10 September 2025  +
05:23:00, 10 September 2025  +
02:50:00, 10 September 2025  +
The following information was provided by The following information was provided by the licensee via phone and fax:</br>Entry into shutdown technical specification action statement due to an identified breach in ventilation ductwork.</br>At 2250 EDT on September 9, 2025, it was discovered that there was degraded manway sealant on the manway to fire damper HV-298A. This degraded sealant results in a direct path from the enclosure building to the atmosphere, challenging the enclosure building boundary. This condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v)(C).</br>There is no impact on the health and safety of the public or plant personnel.</br>The plant is currently in a 24-hour technical specification action statement (3.6.5.2) for Unit 2. Unit 3 is not impacted and continues to operate at 100 percent power.</br>The Resident Inspector has been notified.</br>* * * RETRACTION ON SEPTEMBER 12, 2025, AT 0908 EDT FROM JARED FARLEY TO ERIC SIMPSON * * *</br>The following information was provided by the licensee via phone and fax:</br>Millstone Unit 2 is retracting NRC Event Notification (EN) 57912, made on September 10, 2025, at 0523 EDT, regarding a condition identified at Millstone Power Station Unit 2. The condition involved degraded sealant on manways to fire dampers HV-298A/B/G, which resulted in a direct path from the enclosure building to the atmosphere, challenging the integrity of the enclosure building boundary. This condition was initially reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v)(C) for an event or condition that could have prevented the fulfillment of a safety function (control of release of radioactive material).</br>A subsequent review using additional information on hatch design and actual seating surface determined that there is reasonable assurance the enclosure building boundary remained operable and retained its safety function to control the release of radioactive material and mitigate the consequences of an accident. Based on this assessment, Unit 2 exited Technical Specification action statement 3.6.5.2, and the condition is not reportable under 10 CFR 50.72(b)(3)(v)(C). Therefore, NRC EN 57912 is being retracted.</br>The Resident Inspector has been notified.</br>Notified R1DO (Ford).r has been notified. Notified R1DO (Ford).  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 12 September 2025  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
03:03:25, 24 September 2025  +
05:23:00, 10 September 2025  +
false  +
0.106 d (2.55 hours, 0.0152 weeks, 0.00349 months)  +
true  +
02:50:00, 10 September 2025  +
Enclosure Building Boundary Inoperable  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +