Browse wiki

Jump to navigation Jump to search
The following information was provided by The following information was provided by the licensee via phone and email:</br>At 1023 CDT, on 10/29/2024, with Unit 2 in Mode 1 at 100 percent (reactor) power, during the performance of surveillance procedure 2047, CONTROL ROD QUARTERLY EXERCISE, Unit 2 experienced an automatic reactor trip (followed by a) turbine trip. All control rods fully inserted into the core following the reactor trip. The cause of the Unit 2 reactor trip is being investigated. </br>Operations responded and stabilized the plant. Auxiliary feedwater actuated as expected. Decay heat is being removed by the steam generators through the main steam dumps to the condenser. The Unit 2 reactor trip was not complex with all systems responding normally post trip. </br>Due to the actuation of the reactor protection system (RPS) of Unit 2, this event is being reported as a RPS Actuation in accordance with the reporting criteria of 10 CFR 50.72(b)(2)(iv)(B). </br>Due to the actuation of the auxiliary feedwater system following the Unit 2 reactor trip, this event is being reported as a specified system actuation in accordance with the reporting criteria of 10 CFR 50.72(b)(3)(iv)(A). </br>There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified.  +
15:23:00, 29 October 2024  +
13:50:00, 29 October 2024  +
15:23:00, 29 October 2024  +
The following information was provided by The following information was provided by the licensee via phone and email:</br>At 1023 CDT, on 10/29/2024, with Unit 2 in Mode 1 at 100 percent (reactor) power, during the performance of surveillance procedure 2047, CONTROL ROD QUARTERLY EXERCISE, Unit 2 experienced an automatic reactor trip (followed by a) turbine trip. All control rods fully inserted into the core following the reactor trip. The cause of the Unit 2 reactor trip is being investigated. </br>Operations responded and stabilized the plant. Auxiliary feedwater actuated as expected. Decay heat is being removed by the steam generators through the main steam dumps to the condenser. The Unit 2 reactor trip was not complex with all systems responding normally post trip. </br>Due to the actuation of the reactor protection system (RPS) of Unit 2, this event is being reported as a RPS Actuation in accordance with the reporting criteria of 10 CFR 50.72(b)(2)(iv)(B). </br>Due to the actuation of the auxiliary feedwater system following the Unit 2 reactor trip, this event is being reported as a specified system actuation in accordance with the reporting criteria of 10 CFR 50.72(b)(3)(iv)(A). </br>There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 29 October 2024  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
11:20:09, 31 October 2024  +
13:50:00, 29 October 2024  +
-0.0646 d (-1.55 hours, -0.00923 weeks, -0.00212 months)  +
15:23:00, 29 October 2024  +
Automatic Reactor Trip  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +