Browse wiki
Jump to navigation
Jump to search
86 +
The following information was provided by … The following information was provided by the licensee via email:</br>At 1513 EST on 12/23/22, a Technical Specification required shutdown was initiated at the Davis-Besse Nuclear Power Station Unit 1. Technical Specification (TS) Action Limiting Condition of Operation (LCO) 3.7.9 for Ultimate Heat Sink water level minimum requirements was not met and condition 'A' was entered on 12/23/22 at 1412 EST with a required action to `Be in Mode 3' with a completion time of 6 hours and `Be Mode 5' with a completion time of 36 hours. This event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(i). There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.</br>At 1640 on 12/23/22, the NRC granted enforcement discretion for the shutdown requirements of TS LCO 3.7.9 and the shutdown was terminated with the unit remaining in Mode 1.minated with the unit remaining in Mode 1. +
20:13:00, 23 December 2022 +
56,284 +
17:02:00, 23 December 2022 +
20:13:00, 23 December 2022 +
The following information was provided by … The following information was provided by the licensee via email:</br>At 1513 EST on 12/23/22, a Technical Specification required shutdown was initiated at the Davis-Besse Nuclear Power Station Unit 1. Technical Specification (TS) Action Limiting Condition of Operation (LCO) 3.7.9 for Ultimate Heat Sink water level minimum requirements was not met and condition 'A' was entered on 12/23/22 at 1412 EST with a required action to `Be in Mode 3' with a completion time of 6 hours and `Be Mode 5' with a completion time of 36 hours. This event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(i). There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.</br>At 1640 on 12/23/22, the NRC granted enforcement discretion for the shutdown requirements of TS LCO 3.7.9 and the shutdown was terminated with the unit remaining in Mode 1.minated with the unit remaining in Mode 1. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 23 December 2022 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
13:01:16, 28 December 2022 +
17:02:00, 23 December 2022 +
true +
false +
-0.133 d (-3.18 hours, -0.0189 weeks, -0.00436 months) +
20:13:00, 23 December 2022 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.