The following information was provided by The following information was provided by the licensee via fax:</br>At 1359 CDT on May 10, 2022, the 1B LPCI Loop Upstream Injection valve (1-1001-28B) was found to have a motor operated torque switch issue and inadequate lubrication. This issue called into question the ability of the valve to close when required.</br>At 1746 CDT on May 10, 2022, both trains of Unit 1 LPCI were made simultaneously inoperable. TS 3.6.1.3 Condition A required de-activation of 1B LPCI Loop Downstream Injection valve (1-1001-29B) which was completed at 1746 CDT. Because of the de-activation of the 1B LPCI Loop downstream injection valve and LPCI Loop select logic, both trains of LPCI were made inoperable. Due to this inoperability, the system was in a condition that could have prevented the fulfillment of a safety function; therefore, this condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(V). Unit 1 HPCI and both loops of Core Spray are operable. After further engineering review, it was determined that 1B LPCI Loop Upstream injection valve condition was minor in nature and would not have affected the ability of the valve to close when required.</br>There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.</br>* * * UPDATE AT 12:32 EDT ON 05/11/22 FROM MARK HUMPHREY TO BRIAN P. SMITH * * *</br>The following information was provided by the licensee via phone call and email:</br>The last sentence in the second paragraph, "After further engineering review, it was determined that 1B LPCI Loop Upstream injection valve condition was minor in nature and would not have affected the ability of the valve to close when required," has been deleted. The licensee is continuing to follow up on the issue and believes that sentence to be unclear and premature.</br>Notified R3DO (Skokowski). and premature. Notified R3DO (Skokowski).  +
18:59:00, 10 May 2022  +
55,891  +
23:42:00, 10 May 2022  +
18:59:00, 10 May 2022  +
The following information was provided by The following information was provided by the licensee via fax:</br>At 1359 CDT on May 10, 2022, the 1B LPCI Loop Upstream Injection valve (1-1001-28B) was found to have a motor operated torque switch issue and inadequate lubrication. This issue called into question the ability of the valve to close when required.</br>At 1746 CDT on May 10, 2022, both trains of Unit 1 LPCI were made simultaneously inoperable. TS 3.6.1.3 Condition A required de-activation of 1B LPCI Loop Downstream Injection valve (1-1001-29B) which was completed at 1746 CDT. Because of the de-activation of the 1B LPCI Loop downstream injection valve and LPCI Loop select logic, both trains of LPCI were made inoperable. Due to this inoperability, the system was in a condition that could have prevented the fulfillment of a safety function; therefore, this condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(V). Unit 1 HPCI and both loops of Core Spray are operable. After further engineering review, it was determined that 1B LPCI Loop Upstream injection valve condition was minor in nature and would not have affected the ability of the valve to close when required.</br>There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.</br>* * * UPDATE AT 12:32 EDT ON 05/11/22 FROM MARK HUMPHREY TO BRIAN P. SMITH * * *</br>The following information was provided by the licensee via phone call and email:</br>The last sentence in the second paragraph, "After further engineering review, it was determined that 1B LPCI Loop Upstream injection valve condition was minor in nature and would not have affected the ability of the valve to close when required," has been deleted. The licensee is continuing to follow up on the issue and believes that sentence to be unclear and premature.</br>Notified R3DO (Skokowski). and premature. Notified R3DO (Skokowski).  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 11 May 2022  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
11:30:26, 13 May 2022  +
23:42:00, 10 May 2022  +
false  +
0.197 d (4.72 hours, 0.0281 weeks, 0.00647 months)  +
18:59:00, 10 May 2022  +
Both Trains of LOW Pressure Coolant Injection (LPCI) Inop  +