Browse wiki

Jump to navigation Jump to search
The following information was excerpted frThe following information was excerpted from an email received from CB&I:</br>This letter provides a report in accordance with 10 CFR 21.21 pertaining to the identification of a defect associated with a structural module piping penetration for the Vogtle Unit 3 AP1000 project. The defect is associated with a Pressurizer instrumentation piping penetration in structural module CA01 for Vogtle Unit 3.</br>This condition was previously identified by interim report letters dated July 1, 2015, and September 2, 2015. </br>The discovery date of these deviations is based on the date of the associated CB&I Power Inspection Report (IR). That IR was initiated on May 5, 2015. Interim Part 21 reports dated July 1, 2015, and September 2, 2015, were submitted to the NRC that state the evaluation of this condition was expected to be completed by October 30, 2015. The interim reports were identified as Accession Nos. ML15254A043 and ML15201A130, and Log Nos. 2015-50-01 and 2015-50-00, on the NRC 'Part 21 Reports' website.</br>Name and address of the individual or individuals informing the Commission:</br>Don DePierro</br>CB&I Power</br>128 S. Tryon St., Suite 1000</br>Charlotte, NC 28202ower 128 S. Tryon St., Suite 1000 Charlotte, NC 28202  +
04:00:00, 5 May 2015  +
51,507  +
15:33:00, 29 October 2015  +
04:00:00, 5 May 2015  +
The following information was excerpted frThe following information was excerpted from an email received from CB&I:</br>This letter provides a report in accordance with 10 CFR 21.21 pertaining to the identification of a defect associated with a structural module piping penetration for the Vogtle Unit 3 AP1000 project. The defect is associated with a Pressurizer instrumentation piping penetration in structural module CA01 for Vogtle Unit 3.</br>This condition was previously identified by interim report letters dated July 1, 2015, and September 2, 2015. </br>The discovery date of these deviations is based on the date of the associated CB&I Power Inspection Report (IR). That IR was initiated on May 5, 2015. Interim Part 21 reports dated July 1, 2015, and September 2, 2015, were submitted to the NRC that state the evaluation of this condition was expected to be completed by October 30, 2015. The interim reports were identified as Accession Nos. ML15254A043 and ML15201A130, and Log Nos. 2015-50-01 and 2015-50-00, on the NRC 'Part 21 Reports' website.</br>Name and address of the individual or individuals informing the Commission:</br>Don DePierro</br>CB&I Power</br>128 S. Tryon St., Suite 1000</br>Charlotte, NC 28202ower 128 S. Tryon St., Suite 1000 Charlotte, NC 28202  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 29 October 2015  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:46:27, 2 March 2018  +
15:33:00, 29 October 2015  +
177.481 d (4,259.55 hours, 25.354 weeks, 5.835 months)  +
04:00:00, 5 May 2015  +
Part 21 Report - Defect Associated with Pressurizer Instrumentation Piping Penetration in Module for Vogtle Unit 3  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.