At 2359 EDT on June 7, 2015, the Grand GulAt 2359 EDT on June 7, 2015, the Grand Gulf Nuclear Station declared a Notice of Unusual Event in accordance with Emergency Action Level HU4 for a fire in the protected area lasting greater than 15 minutes. The fire started in the wiring of a terminal box for Electro Hydraulic Pump C, the running pump located in the turbine building. The running pump was then deenergized by operators and the standby pump started. The site fire brigade responded and extinguished the fire. The emergency was terminated at 0030 on June 8, 2015.</br>The licensee notified state and local agencies and will inform the NRC Resident Inspector.</br>Notified DHS SWO, FEMA Ops Center, NICC Watch Officer, and FEMA NWC and Nuclear SSA via email.</br>* * * RETRACTION AT 1645 ON 7/9/2015 FROM KEITH HUFF TO MARK ABRAMOVITZ * * *</br>The notification of an Unusual Event is being retracted because the event did not meet the definition of 'fire' in NEI 99-01 Revision 5, 'Methodology of the Development of Emergency Action Levels'. The document was endorsed by the NRC on February 22, 2008 (see ADAMS ascension # ML080450149) and is part of the Grand Gulf Nuclear Station's current licensing basis. Per the guidance, a 'fire' is defined as: 'Combustion characterized by heat and light. Sources of smoke such as slipping drive belts or overheated electrical equipment do not constitute as 'fires'. Observation of flame is preferred but is NOT required if large quantities of smoke and heat are observed.'</br>According to eyewitness reports from personnel, flames were not observed at any time and evidence of large quantities of heat and smoke were not observed. Additionally, the definition of 'fire' specifically excludes overheated electrical equipment. This information leads to the conclusion that the event did not meet the definition of a 'fire' per NEI 99-01 Revision 5. Therefore, the event is not an immediately reportable Unusual Event under 10 CFR 50.72(a)(1)(i).</br>The licensee notified the NRC Resident Inspector and will notify the state and local governments.</br>Notified the R4DO (Haire) and NRR EO (Morris via e-mail).DO (Haire) and NRR EO (Morris via e-mail).  
03:59:00, 8 June 2015  +
51,137  +
00:45:00, 8 June 2015  +
03:59:00, 8 June 2015  +
At 2359 EDT on June 7, 2015, the Grand GulAt 2359 EDT on June 7, 2015, the Grand Gulf Nuclear Station declared a Notice of Unusual Event in accordance with Emergency Action Level HU4 for a fire in the protected area lasting greater than 15 minutes. The fire started in the wiring of a terminal box for Electro Hydraulic Pump C, the running pump located in the turbine building. The running pump was then deenergized by operators and the standby pump started. The site fire brigade responded and extinguished the fire. The emergency was terminated at 0030 on June 8, 2015.</br>The licensee notified state and local agencies and will inform the NRC Resident Inspector.</br>Notified DHS SWO, FEMA Ops Center, NICC Watch Officer, and FEMA NWC and Nuclear SSA via email.</br>* * * RETRACTION AT 1645 ON 7/9/2015 FROM KEITH HUFF TO MARK ABRAMOVITZ * * *</br>The notification of an Unusual Event is being retracted because the event did not meet the definition of 'fire' in NEI 99-01 Revision 5, 'Methodology of the Development of Emergency Action Levels'. The document was endorsed by the NRC on February 22, 2008 (see ADAMS ascension # ML080450149) and is part of the Grand Gulf Nuclear Station's current licensing basis. Per the guidance, a 'fire' is defined as: 'Combustion characterized by heat and light. Sources of smoke such as slipping drive belts or overheated electrical equipment do not constitute as 'fires'. Observation of flame is preferred but is NOT required if large quantities of smoke and heat are observed.'</br>According to eyewitness reports from personnel, flames were not observed at any time and evidence of large quantities of heat and smoke were not observed. Additionally, the definition of 'fire' specifically excludes overheated electrical equipment. This information leads to the conclusion that the event did not meet the definition of a 'fire' per NEI 99-01 Revision 5. Therefore, the event is not an immediately reportable Unusual Event under 10 CFR 50.72(a)(1)(i).</br>The licensee notified the NRC Resident Inspector and will notify the state and local governments.</br>Notified the R4DO (Haire) and NRR EO (Morris via e-mail).DO (Haire) and NRR EO (Morris via e-mail).  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 9 July 2015  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:47:17, 2 March 2018  +
00:45:00, 8 June 2015  +
false  +
-0.135 d (-3.23 hours, -0.0192 weeks, -0.00442 months)  +
true  +
03:59:00, 8 June 2015  +
Unusual Event - Fire in Protected Area Lasting Greater than 15 Minutes  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +