Browse wiki

Jump to navigation Jump to search
U1 entered Technical Specification 3.0.3, U1 entered Technical Specification 3.0.3, and initiated actions to reduce power via control rod insertion in preparations to enter startup within the following 6 hours. Entry into Tech Spec 3.0.3 was a result of both HPCI and RCIC injection systems being inoperable at the same time.</br>During startup from the U1 refueling outage, RCIC and HPCI full flow testing was unable to be completed at rated reactor pressure prior to the expiration of the 12 hour allowance per Tech Spec Surveillances 4.7.3.b* and 4.5.1.b.3** respectively. This occurred due to testing issues encountered while attempting to perform the rated pressure pump valve and flow tests.</br>U1 HPCI testing was completed satisfactorily at 0830, and HPCI was restored to operable. Plant shutdown was terminated at 0830 (EDT) as conditions for 3.0.3 no longer existed.</br>The licensee will notify the NRC Resident Inspector.ee will notify the NRC Resident Inspector.  +
10:18:00, 8 April 2014  +
50,007  +
09:45:00, 8 April 2014  +
10:18:00, 8 April 2014  +
U1 entered Technical Specification 3.0.3, U1 entered Technical Specification 3.0.3, and initiated actions to reduce power via control rod insertion in preparations to enter startup within the following 6 hours. Entry into Tech Spec 3.0.3 was a result of both HPCI and RCIC injection systems being inoperable at the same time.</br>During startup from the U1 refueling outage, RCIC and HPCI full flow testing was unable to be completed at rated reactor pressure prior to the expiration of the 12 hour allowance per Tech Spec Surveillances 4.7.3.b* and 4.5.1.b.3** respectively. This occurred due to testing issues encountered while attempting to perform the rated pressure pump valve and flow tests.</br>U1 HPCI testing was completed satisfactorily at 0830, and HPCI was restored to operable. Plant shutdown was terminated at 0830 (EDT) as conditions for 3.0.3 no longer existed.</br>The licensee will notify the NRC Resident Inspector.ee will notify the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
6.944444e-5 d (0.00167 hours, 9.920635e-6 weeks, 2.283e-6 months)  +  and 1.388889e-4 d (0.00333 hours, 1.984127e-5 weeks, 4.566e-6 months)  +
00:00:00, 8 April 2014  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:51:08, 2 March 2018  +
09:45:00, 8 April 2014  +
false  +
-0.0229 d (-0.55 hours, -0.00327 weeks, -7.5339e-4 months)  +
10:18:00, 8 April 2014  +
Shutdown Action Initiated Because Hpci and Rcic Were Simultaneously Inoperable  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +