Browse wiki

Jump to navigation Jump to search
At 0904 (EST) on Monday, December 2, 2013,At 0904 (EST) on Monday, December 2, 2013, Nine Mile Point Unit 2 was manually scrammed from approximately 40% thermal power due to the loss of both reactor recirculation pumps during a planned downpower evolution. Manual scram of the unit is procedurally required upon loss of both recirculation pumps to avoid potential power/flow oscillations. The reactor recirculation pumps failed to transfer to the low frequency motor generators when downshifted from fast speed. The cause of the loss of both reactor recirculation pumps is not known at this time. (Nine Mile Point Unit 2) NMP2 has commenced cooldown in preparation for the forced outage to investigate and commence repairs.</br>10 CFR 50.72(b)(2)(iv)(B) requires reporting within 4 hours of any event or condition that results in actuation of the reactor protection system (RPS) when the reactor is critical.</br>All control rods fully inserted. No safety systems actuated. Decay heat is being removed via the main condenser. The "A" recirculation pump was restarted in low speed at 1045 EST. Unit 2 is in a normal shutdown electrical lineup.</br>The licensee informed the NRC Resident Inspector and will inform the New York State Public Services Commission.New York State Public Services Commission.  +
14:04:00, 2 December 2013  +
49,593  +
11:03:00, 2 December 2013  +
14:04:00, 2 December 2013  +
At 0904 (EST) on Monday, December 2, 2013,At 0904 (EST) on Monday, December 2, 2013, Nine Mile Point Unit 2 was manually scrammed from approximately 40% thermal power due to the loss of both reactor recirculation pumps during a planned downpower evolution. Manual scram of the unit is procedurally required upon loss of both recirculation pumps to avoid potential power/flow oscillations. The reactor recirculation pumps failed to transfer to the low frequency motor generators when downshifted from fast speed. The cause of the loss of both reactor recirculation pumps is not known at this time. (Nine Mile Point Unit 2) NMP2 has commenced cooldown in preparation for the forced outage to investigate and commence repairs.</br>10 CFR 50.72(b)(2)(iv)(B) requires reporting within 4 hours of any event or condition that results in actuation of the reactor protection system (RPS) when the reactor is critical.</br>All control rods fully inserted. No safety systems actuated. Decay heat is being removed via the main condenser. The "A" recirculation pump was restarted in low speed at 1045 EST. Unit 2 is in a normal shutdown electrical lineup.</br>The licensee informed the NRC Resident Inspector and will inform the New York State Public Services Commission.New York State Public Services Commission.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
4.62963e-5 d (0.00111 hours, 6.613757e-6 weeks, 1.522e-6 months)  +
00:00:00, 2 December 2013  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:52:28, 2 March 2018  +
11:03:00, 2 December 2013  +
true  +
-0.126 d (-3.02 hours, -0.018 weeks, -0.00414 months)  +
14:04:00, 2 December 2013  +
Manual Scram Following Trip of Both Reactor Recirculation Pumps  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +