On 30 April, 2012, at 2328 (EDT), DC Cook … On 30 April, 2012, at 2328 (EDT), DC Cook Unit 2 Reactor automatically tripped due to a trip of the main turbine. The cause of the main turbine trip is still under investigation.</br>The electrical grid is stable and Unit 2 is being supplied by offsite power. All control rods fully inserted. Decay heat is being removed via Steam Generator PORVs to atmosphere. Preliminary evaluation indicates all plant systems functioned normally following the reactor trip. DC Cook Unit 2 remains stable in Mode 3 while conducting the post trip review. No radioactive releases were experienced as a result of this event.</br>This event is reportable under 10 CFR 50.72(b)(2)(iv)(B), Reactor Protection System (RPS) actuation, as a four (4) hour report, and under 10 CFR 50.72(b)(3)(iv)(A), specified system actuation of the Auxiliary Feedwater System, as an eight (8) hour report.</br>The DC Cook Resident NRC Inspector has been notified.</br>The licensee stated that the trip was uncomplicated and the reactor is stable in mode 3 at no load temperature and pressure. The unit is on steam generator atmospheric relief valves because the secondary steam load on the plant was causing too much of a cool down. There is no primary to secondary steam generator leakage for the unit. The trip had no impact on Unit 1 which continues to operate at full power. which continues to operate at full power. +
03:28:00, 1 May 2012 +
47,881 +
02:34:00, 1 May 2012 +
03:28:00, 1 May 2012 +
On 30 April, 2012, at 2328 (EDT), DC Cook … On 30 April, 2012, at 2328 (EDT), DC Cook Unit 2 Reactor automatically tripped due to a trip of the main turbine. The cause of the main turbine trip is still under investigation.</br>The electrical grid is stable and Unit 2 is being supplied by offsite power. All control rods fully inserted. Decay heat is being removed via Steam Generator PORVs to atmosphere. Preliminary evaluation indicates all plant systems functioned normally following the reactor trip. DC Cook Unit 2 remains stable in Mode 3 while conducting the post trip review. No radioactive releases were experienced as a result of this event.</br>This event is reportable under 10 CFR 50.72(b)(2)(iv)(B), Reactor Protection System (RPS) actuation, as a four (4) hour report, and under 10 CFR 50.72(b)(3)(iv)(A), specified system actuation of the Auxiliary Feedwater System, as an eight (8) hour report.</br>The DC Cook Resident NRC Inspector has been notified.</br>The licensee stated that the trip was uncomplicated and the reactor is stable in mode 3 at no load temperature and pressure. The unit is on steam generator atmospheric relief valves because the secondary steam load on the plant was causing too much of a cool down. There is no primary to secondary steam generator leakage for the unit. The trip had no impact on Unit 1 which continues to operate at full power. which continues to operate at full power. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
91 +
00:00:00, 1 May 2012 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:04:16, 2 March 2018 +
02:34:00, 1 May 2012 +
true +
-0.0375 d (-0.9 hours, -0.00536 weeks, -0.00123 months) +