Browse wiki

Jump to navigation Jump to search
This interim Part 21 is in regard to San OThis interim Part 21 is in regard to San Onofre Nuclear Generating Station, Unit 2, Steam Generator replacement.</br>During the first refueling outage following steam generator replacement, eddy current testing identified ten total tubes with depths of 90 to 28 percent of the tube wall thickness. Some of the affected tubes were located adjacent to retainer bars. The retainer bars are part of the floating anti-vibration bar (AVB) structure that stabilizes the u-bend region of the tubes.</br>Other tubes in the two steam generators had detectable wear associated with support points elsewhere in the AVB structure. Each steam generator has 9727 tubes with an 8 percent (778 tubes) design margin for tube plugging. </br>Discovery Date: February 13, 2012</br>Evaluation completion schedule date: May 31, 2012</br>Those Mitsubishi Heavy Industries customers potentially affected by this issue have been notified and will receive a copy of this interim report.</br>Reference Document: UET-20120089</br>Interim Report No: U21-018-IR (0)</br> </br>Notified R1DO (Joustra), R2DO (Nease), R3DO (Peterson), R4DO (O'Keefe), and Part 21 Group via email. </br>* * * UPDATE FROM MITSUBISHI HEAVY INDUSTRIES, LTD VIA FAX ON 6/4/12 AT 1145 EDT * * *</br>The vendor changed the number of tubes identified with wear depths of 90 to 28 percent from ten tubes to six tubes and only some of the tubes were adjacent to retainer bars.</br>Notified R1DO (Cahill), R2DO (Vias), R3DO (Passehl), R4DO (Gepford) and Part 21 Groups via email.</br>* * * UPDATE FROM MITSUBISHI HEAVY INDUSTRIES, LTD VIA FAX ON 9/7/12 AT 1539 EDT * * *</br>MHI evaluated that the deviation contains a reportable defect for San Onofre Nuclear Generating Station Unit 2 and 3.</br>Notified R4DO (Gaddy) and Part 21 Reactor Group via email.addy) and Part 21 Reactor Group via email.  +
04:00:00, 21 February 2012  +
47,833  +
15:58:00, 13 April 2012  +
04:00:00, 21 February 2012  +
This interim Part 21 is in regard to San OThis interim Part 21 is in regard to San Onofre Nuclear Generating Station, Unit 2, Steam Generator replacement.</br>During the first refueling outage following steam generator replacement, eddy current testing identified ten total tubes with depths of 90 to 28 percent of the tube wall thickness. Some of the affected tubes were located adjacent to retainer bars. The retainer bars are part of the floating anti-vibration bar (AVB) structure that stabilizes the u-bend region of the tubes.</br>Other tubes in the two steam generators had detectable wear associated with support points elsewhere in the AVB structure. Each steam generator has 9727 tubes with an 8 percent (778 tubes) design margin for tube plugging. </br>Discovery Date: February 13, 2012</br>Evaluation completion schedule date: May 31, 2012</br>Those Mitsubishi Heavy Industries customers potentially affected by this issue have been notified and will receive a copy of this interim report.</br>Reference Document: UET-20120089</br>Interim Report No: U21-018-IR (0)</br> </br>Notified R1DO (Joustra), R2DO (Nease), R3DO (Peterson), R4DO (O'Keefe), and Part 21 Group via email. </br>* * * UPDATE FROM MITSUBISHI HEAVY INDUSTRIES, LTD VIA FAX ON 6/4/12 AT 1145 EDT * * *</br>The vendor changed the number of tubes identified with wear depths of 90 to 28 percent from ten tubes to six tubes and only some of the tubes were adjacent to retainer bars.</br>Notified R1DO (Cahill), R2DO (Vias), R3DO (Passehl), R4DO (Gepford) and Part 21 Groups via email.</br>* * * UPDATE FROM MITSUBISHI HEAVY INDUSTRIES, LTD VIA FAX ON 9/7/12 AT 1539 EDT * * *</br>MHI evaluated that the deviation contains a reportable defect for San Onofre Nuclear Generating Station Unit 2 and 3.</br>Notified R4DO (Gaddy) and Part 21 Reactor Group via email.addy) and Part 21 Reactor Group via email.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 7 September 2012  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:24:22, 24 September 2017  +
15:58:00, 13 April 2012  +
52.54 d (1,260.97 hours, 7.506 weeks, 1.727 months)  +
04:00:00, 21 February 2012  +
Part 21 Interim Report - Steam Generator Tube Wear  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.